Water Diversions Sample Clauses

Water Diversions. PacifiCorp will seek to eliminate screened diversions from Shovel and Negro Creeks, and will seek to modify its water rights to move the point of diversion from Shovel and Negro Creeks to the Klamath River.4
AutoNDA by SimpleDocs
Water Diversions. (A) Season of Diversion. After October 31, 2018, Permittee shall confine the period of diversion to December 15 through March 31. (B) Water Storage and Control. Permittee shall cease all water diversion at the point of diversion when WSFs are filled to capacity. Water shall not leak, overflow, or overtop WSFs at any time. Permittee shall regularly inspect all WSFs and infrastructure used to divert water to storage and use and repair any leaks. (C) Diversion Intakes. Permittee shall plug, cap, block (e.g., with a shut-off valve), or remove all intakes at the end of each diversion season. (D) Underground Water Diversion Infrastructure. Infrastructure installed in the streambed (e.g., cistern or spring box) shall not exceed 10 percent of the active channel width and shall not be located in the deepest portion of the channel. The depth of the intake shall be no greater than one foot below the streambed.
Water Diversions. (A) Season of Diversion. After October 31, 2018, Permittee shall confine the period of diversion to December 15 through March 31. (B) Water Storage and Control. Permittee shall cease all water diversion at the point of diversion when WSFs are filled to capacity. Water shall not leak, overflow, or overtop WSFs at any time. (C) Diversion Intakes. Permittee shall plug, cap, block (e.g., shut-off valve), or remove all intakes at the end of each diversion season. (D) Underground Water Diversion Infrastructure. Infrastructure installed in the streambed (e.g., cistern or spring box) shall not exceed 10 percent of the active channel width and shall not be located in the deepest portion of the channel. The depth of the screened intake shall be no greater than one foot below the streambed.
Water Diversions 

Related to Water Diversions

  • Diversion In case, the contractor is directed in writing by an Officer of NFL and / or the authorized warehouse in-charge to carry the material further to any other destination after reaching the original destination as per the Delivery challan, the contractor, would carry out such instructions. The payment of such diverted delivery of material will be the same as if it is direct delivery to the final destination.

  • WATERBEDS The Tenant: (check one)

  • Transporting Students 1. Employees shall not transport students except in accordance with School Board rules. The Board shall adopt a school board policy outlining the teacher’s and the Board’s responsibilities and liabilities. Said policy shall be included in all school handbooks beginning with the 2004-05 school year. 2. Teachers will not be required to transport pupils to and from activities which take place away from the school grounds.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Community Property Each spouse individually is bound by, and such spouse’s interest, if any, in any Optioned Shares is subject to, the terms of this Agreement. Nothing in this Agreement shall create a community property interest where none otherwise exists.

  • Trade Facilitation The Parties, in accordance with the provisions set out in Annex IV, with the aim to facilitate trade between the EFTA States and Serbia, shall: (a) simplify, to the greatest extent possible, procedures for trade in goods and related services; (b) promote co-operation among them in order to enhance their participation in the development and implementation of international conventions and recommendations on trade facilitation; and (c) co-operate on trade facilitation within the framework of the Joint Committee.

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!