Water Diversions Clause Samples

Water Diversions. PacifiCorp will seek to eliminate screened diversions from Shovel and Negro Creeks, and will seek to modify its water rights to move the point of diversion from Shovel and Negro Creeks to the Klamath River.4
Water Diversions. (A) Season of Diversion. After October 31, 2018, Permittee shall confine the period of diversion to December 15 through March 31. (B) Water Storage and Control. Permittee shall cease all water diversion at the point of diversion when WSFs are filled to capacity. Water shall not leak, overflow, or overtop WSFs at any time. Permittee shall regularly inspect all WSFs and infrastructure used to divert water to storage and use and repair any leaks. (C) Diversion Intakes. Permittee shall plug, cap, block (e.g., with a shut-off valve), or remove all intakes at the end of each diversion season. (D) Underground Water Diversion Infrastructure. Infrastructure installed in the streambed (e.g., cistern or spring box) shall not exceed 10 percent of the active channel width and shall not be located in the deepest portion of the channel. The depth of the intake shall be no greater than one foot below the streambed.
Water Diversions. (A) Season of Diversion. After October 31, 2018, Permittee shall confine the period of diversion to December 15 through March 31. (B) Water Storage and Control. Permittee shall cease all water diversion at the point of diversion when WSFs are filled to capacity. Water shall not leak, overflow, or overtop WSFs at any time. (C) Diversion Intakes. Permittee shall plug, cap, block (e.g., shut-off valve), or remove all intakes at the end of each diversion season. (D) Underground Water Diversion Infrastructure. Infrastructure installed in the streambed (e.g., cistern or spring box) shall not exceed 10 percent of the active channel width and shall not be located in the deepest portion of the channel. The depth of the screened intake shall be no greater than one foot below the streambed.
Water Diversions 

Related to Water Diversions

  • Procurement Project not financed with EU Funds The procurement is covered by the Government Procurement Agreement (GPA): yes

  • WATERBEDS The Tenant: (check one)

  • Transporting Students 1. Employees shall not transport students except in accordance with School Board rules. The Board shall adopt a school board policy outlining the teacher’s and the Board’s responsibilities and liabilities. Said policy shall be included in all school handbooks beginning with the 2004-05 school year. 2. Teachers will not be required to transport pupils to and from activities which take place away from the school grounds.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.