Weighted FTE counts Sample Clauses

Weighted FTE counts. Subject to the provisions of § 413.81, for purposes of determining direct GME payment—
AutoNDA by SimpleDocs

Related to Weighted FTE counts

  • Maximum Class Size A. By August 26 of each year, no regular classroom teacher in an elementary school or K-8 school shall be assigned more than the number of students for each grade listed except as provided in 22-2-B and 22-8 below: K = 26 1-3 = 29 4-6/Stand Alone (at K-8 school) 7-8 = 30 Combination/Multi-Age Classes = 27

  • Class Size a) When CONTRACTOR is a NPS, CONTRACTOR shall ensure that class size shall not exceed a ratio of one teacher per fourteen (14) pupils. Each classroom with 2 or more students shall be assigned at least one paraprofessional. Upon written approval by an authorized XXX representative, class size may be temporarily increased by a ratio of 1 teacher to sixteen (16) pupils when necessary to provide services to pupils with disabilities. For any billing period where the class size has exceeded sixteen (16) students for five consecutive school days, the CONTRACTOR shall have a 10% decrease in its approved daily rate for those LEA students that exceeded sixteen (16), for those days (over five).

  • SALARY STEP INCREASES a. Increases to steps above the entry step shall be based on performance and length of service. The employee must have earned the equivalent of at least twenty-six

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!