Well Control Equipment Sample Clauses

Well Control Equipment. Subject to Paragraph 706 and Article IX, Contractor shall maintain its well control equipment listed in Appendices B and D in good condition at all times and shall use all reasonable means to prevent and control fires and blowouts and to protect the hole.
AutoNDA by SimpleDocs
Well Control Equipment. The Contractor shall exercise care in the prevention of fires, explosions and blowouts and it shall do everything possible to maintain well control equipment in good operating condition at all times including but not necessarily limited to employing correct service schemes, replacement of unserviceable parts with original manufacturers spare parts, routine pressure testing and shall ensure that approved well control equipment is in good order at all times. During drilling operations the Contractor shall use satisfactory blow-out prevention equipment approved by the Company. The Contractor shall examine and test all blow-out prevention devices in accordance with the Company’s drilling or testing programme and to record the results of such tests on the drilling reports.

Related to Well Control Equipment

  • Capital Equipment Collaborator’s commitment, if any, to provide ICD with capital equipment to enable the research and development activities under the Research Plan appears in Appendix B. If Collaborator transfers to ICD the capital equipment or provides funds for ICD to purchase it, then ICD will own the equipment. If Collaborator loans capital equipment to ICD for use during the CRADA, Collaborator will be responsible for paying all costs and fees associated with the transport, installation, maintenance, repair, removal, or disposal of the equipment, and ICD will not be liable for any damage to the equipment.

  • Additional Equipment Additional Equipment may from time to time be added as the subject matter of this Agreement as agreed on by the parties. Any additional property will be added in an amendment describing the property, the monthly rental, security deposit, and stipulated loss value of the additional Equipment. All amendments must be in writing and signed by both parties. Other than by this amendment procedure, this Agreement may not be amended, modified, or altered in any manner except in writing signed by both parties.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Durable Medical Equipment Durable Medical Equipment is equipment that is Medically Necessary for treatment of an illness or Accidental Injury or to prevent further deterioration. This equipment is designed for repeated use and used to treat a medical condition or illness, and includes items such as oxygen equipment, functional wheelchairs, and crutches. Durable Medical Equipment may require Prior Authorization. Only Durable Medical Equipment considered standard and/or basic as defined by nationally recognized guidelines are Covered.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.

  • Required Equipment Employees are expected to be at their individual work stations with required equipment in operable condition at the scheduled shift starting time.

  • Special Equipment The Employer agrees to provide specialty tools, emergency supplies/equipment, testing equipment and safety equipment as needed to perform required duties as determined and authorized by the Chief or designee. The emergency supplies/equipment will include appropriate survival provisions and equipment for each permanent Maintenance Mechanic 4 and the Law Enforcement Communications Systems Supervisor when they are performing duties that would require such provisions and equipment. When necessary, the employer will replenish used or expired survival provisions and damaged and unusable equipment. All supplies and equipment will be returned to the employer when the employee is no longer performing the duties that would require the survival provisions and/or equipment.

  • Rental Equipment 7.1 We will at all times own all Rental Equipment supplied to you. You will not let, sell, charge, assign, sub-license or allow a third party to use the Rental Equipment nor remove any labels, and shall not prejudice our rights in the Rental Equipment in any way. We may replace the Rental Equipment from time to time either with your prior consent or provided that the replacement Rental Equipment is of a specification that is at least equal to the Rental Equipment originally supplied and such change does not materially disrupt the provision of the Services. 7.2 Subject to the other terms of this paragraph 7, we (or our authorised representative) shall, during our usual working hours: 7.2.1 where necessary install the Rental Equipment at your premises at a time and date agreed with you; and 7.2.2 use our reasonable endeavours to repair any faults to the Rental Equipment in accordance with our standard procedures (which are available on request). 7.3 It is your responsibility to look after the Rental Equipment that is in your possession or custody and you agree to pay for the Rental Equipment to be replaced or repaired if it is lost, stolen or damaged. 7.4 You will notify us promptly of any faults which occur, any repairs which become necessary, and of any loss, theft or damage to the Rental Equipment. 7.5 You agree that you will only use the Rental Equipment in conjunction with the relevant Services and shall comply with our reasonable instructions in relation to its use. 7.6 You shall be responsible for maintaining adequate cover in place to insure the Rental Equipment while it remains in your possession and custody. You will also be responsible for obtaining and, where appropriate, paying for all necessary licenses, consents and approvals required for the installation and use of the Rental Equipment. 7.7 You will not (and you will ensure that no-one else will) repair, alter, modify or maintain, or make any additions or attachments to, or otherwise alter, the Rental Equipment without our prior written consent. We will not be liable for any costs or charges incurred, faults caused by, or repairs required as a result of, installation or programming of Rental Equipment that is carried out by any other person (other than our employees or agents). You agree to indemnify us for all losses, damages and expenses that are brought against or incurred by us, arising as a result of the same. 7.8 On expiry or termination of the Agreement or the relevant Service, all Rental Equipment must be returned to us in reasonable condition, subject to reasonable wear and tear. If you fail to return or make available for collection the Rental Equipment in a reasonable condition or at all we may, at our option, invoice you for a sum equal to the original cost of the Rental Equipment less any depreciation together with any costs reasonably incurred by us. 7.9 In the event that you return Rental Equipment to us and it is not received by us, in the absence of reasonable evidence that the Rental Equipment has been delivered to us you accept that you shall remain liable for the Rental Equipment.

  • Removal of Equipment Subject, always, to the other terms and provisions of this Fee Agreement, the Company and any Sponsor Affiliates shall be entitled to remove and dispose of components of the Project from the Project in its sole discretion with the result that said components shall no longer be considered a part of the Project and, to the extent such constitute Economic Development Property, shall no longer be subject to the terms of this Fee Agreement. Economic Development Property is disposed of only when it is scrapped or sold or removed from the Project. If it is removed from the Project, it is subject to ad valorem property taxes to the extent the Property remains in the State and is otherwise subject to ad valorem property taxes.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!