Actual Transmission Capacity definition

Actual Transmission Capacity means, at the applicable date of determination under Section 3.3(c), the actual transmission transfer capability of the New Transmission Facilities, as built.

Examples of Actual Transmission Capacity in a sentence

  • Where,12 Pt MWtTR A : Actual Transmission Capacity tariff for month “t”TSARy : Transmission System Allowed Revenues year “y”tPA : Actual System Coincident Peak Demand for month “t”, metered at delivery points to Distribution Licensees and Transmission Customers.

  • Where,12 Pt MWtTRA : Actual Transmission Capacity tariff for month “t”TSARy : Transmission System Allowed Revenues year “y”tPA : Actual System Coincident Peak Demand for month “t”, metered at delivery points to Distribution Licensees and Transmission Customers.

Related to Actual Transmission Capacity

  • Capacity Export Transmission Customer means a customer taking point to point transmission service under Tariff, Part II to export capacity from a generation resource located in the PJM Region that has qualified for an exception to the RPM must-offer requirement as described in Tariff, Attachment DD, section 6.6(g).

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Annual Transmission Costs means the total annual cost of the Transmission System for purposes of Network Integration Transmission Service shall be the amount specified in Attachment H for each Zone until amended by the applicable Transmission Owner or modified by the Commission.

  • Transmission Customer means any eligible customer, shipper or designated agent that can or does execute a transmission service agreement or can or does receive transmission service, including all persons who have pending requests for transmission service or for information regarding transmission.

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement.

  • Capacity Transmission Injection Rights means the rights to schedule energy and capacity deliveries at a Point of Interconnection of a Merchant Transmission Facility with the Transmission System. Capacity Transmission Injection Rights may be awarded only to a Merchant D.C. Transmission Facility and/or Controllable A.C. Merchant Transmission Facilities that connects the Transmission System to another control area. Deliveries scheduled using Capacity Transmission Injection Rights have rights similar to those under Firm Point-to-Point Transmission Service or, if coupled with a generating unit external to the PJM Region that satisfies all applicable criteria specified in the PJM Manuals, similar to Capacity Interconnection Rights.

  • Contract Capacity has the meaning set forth in Section 3.1(f).

  • Storage Capacity means any combination of space, injectability and deliverability.

  • Interruptible Capacity means capacity that may be interrupted by the Operator at any time in order to fulfil shippers’ nominations under a firm capacity reservation.

  • Excess capacity means volume or capacity in a duct, conduit, or support structure other than a utility pole or anchor which can be used, pursuant to the orders and regulations of the Commission, for a pole attachment.

  • Transmission Interconnection Customer means an entity that submits an Interconnection Request to interconnect or add Merchant Transmission Facilities to the Transmission System or to increase the capacity of Merchant Transmission Facilities interconnected with the Transmission System in the PJM Region or an entity that submits an Upgrade Request for Merchant Network Upgrades (including accelerating the construction of any transmission enhancement or expansion, other than Merchant Transmission Facilities, that is included in the Regional Transmission Expansion Plan prepared pursuant to Operating Agreement, Schedule 6).

  • Idle capacity means the unused capacity of partially used facilities. It is the difference between: (a) that which a facility could achieve under 100 percent operating time on a one-shift basis less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays; and (b) the extent to which the facility was actually used to meet demands during the accounting period. A multi-shift basis should be used if it can be shown that this amount of usage would normally be expected for the type of facility involved.

  • Transmission Service means Point-To-Point Transmission Service provided under Tariff, Part II on a firm and non-firm basis.

  • Qualifying Transmission Upgrade means a proposed enhancement or addition to the Transmission System that: (a) will increase the Capacity Emergency Transfer Limit into an LDA by a megawatt quantity certified by the Office of the Interconnection; (b) the Office of the Interconnection has determined will be in service on or before the commencement of the first Delivery Year for which such upgrade is the subject of a Sell Offer in the Base Residual Auction; (c) is the subject of a Facilities Study Agreement executed before the conduct of the Base Residual Auction for such Delivery Year and (d) a New Service Customer is obligated to fund through a rate or charge specific to such facility or upgrade.

  • Central Transmission Utility means the Government Company notified by the Central Government under Sub-Section (1) of Section 38 of the Electricity Act, 2003.

  • CTU or Central Transmission Utility means the Central Transmission Utility as defined in sub-section (10) of Section 2 of the Electricity Act 2003;

  • Rated Capacity means the Average Daily Flow for which the Works are approved to handle;

  • Design capacity means the volume of a containment feature at a discharging facility that accommodates all permitted flows and meets all Aquifer Protection Permit conditions, including allowances for appropriate peaking and safety factors to ensure sustained, reliable operation.

  • Available Capacity means the capacity from the Project, expressed in whole megawatts, that is available to generate Product. [For As-Available Product facilities only]

  • Transmission pipeline means any high pressure transmission pipeline connected to, but excluding the Maui Pipeline, that is used for the open access transportation of Gas, and includes all items of plant, equipment, fixtures and fittings directly appurtenanced to that pipeline, but excluding any item which is controlled by a party other than that pipeline’s TP Welded Party and any low pressure distribution system.

  • Interregional Transmission Project means transmission facilities that would be located within two or more neighboring transmission planning regions and are determined by each of those regions to be a more efficient or cost effective solution to regional transmission needs.

  • Network Transmission Service means transmission service provided pursuant to the rates, terms and conditions set forth in Tariff, Part III, or transmission service comparable to such service that is provided to a Load Serving Entity that is also a Transmission Owner.

  • Nameplate Capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.

  • Network Integration Transmission Service means the transmission service provided under Tariff, Part III.

  • P.01 Transmission Grade of Service (“GOS”) means a trunk facility provisioning standard with the statistical probability of no more than one call in 100 blocked on initial attempt during the average busy hour.