Examples of Blackstart Resource in a sentence
X Single EOP-005-3 R7 Each Transmission Operator shall have Blackstart Resource testing requirements to verify that each Blackstart Resource is capable of meeting the requirements of its restoration plan.
The restoration plan shall be implemented to restore the Transmission Operator’s System following a Disturbance in which one or more areas of the Bulk Electric System (BES) shuts down and the use of Blackstart Resources is required to restore the shutdown area to a state whereby the choice of the next Load to be restored is not driven by the need to control frequency or voltage regardless of whether the Blackstart Resource is located within the Transmission Operator’s System.
Each Transmission Operator and each Generator Operator with a Blackstart Resource shall have written Blackstart Resource Agreements or mutually agreed upon procedures or protocols, specifying the terms and conditions of their arrangement.
Such Agreements shall include references to the Blackstart Resource testing requirements.
Further, as used in the definition of Blackstart Resource, these terms are intended to have the meaning of the defined terms.20 Therefore, it is appropriate to capitalize these terms in the Glossary in order to align the Glossary and Rules of Procedure definitions.
Each Transmission Operator shall have Blackstart Resource testing requirements to verify that each Blackstart Resource is capable of meeting the requirements of its restoration plan.
The SRB SDT defined a new term, Blackstart Resource, which allows for greater flexibility in providing resources for blackstart operations.
X Single EOP-005-3 R1.5 Identification of Cranking Paths and initial switching requirements between each Blackstart Resource and the unit(s) to be started.
Text of Requirement CAISO TE Responsibility (either Each, Split, Single or N/A) Responsibility Details EOP-005-3 R1.4 Identification of each Blackstart Resource and its characteristics including but not limited to the following: the name of the Blackstart Resource, location, megawatt and megavar capacity, and type of unit.
Support revisions to Appendix G (Designated Blackstart Resource Commitment) to OP-11 (Blackstart Resource Administration), including updates that rename Blackstart Owner to Proposed Blackstart Owner when appropriate, rename Generating Asset to resource, and implement other grammatical and terminology changes, as recommended by the RC at its January 19, 2022 meeting, together with such further non-material changes as the Chair and Vice-Chair of the RC may approve.