Coastal Construction Control Line definition

Coastal Construction Control Line. (CCCL) means the line established pursuant to the provisions of F.S. Ch. 161.053. Structures built forward of this line must be approved by the Florida Department of Environmental Protection prior to start of construction. The CCCL should not be confused with the “Coastal Control Setback
Coastal Construction Control Line. (CCCL) means the line established by the State of Florida pursuant to section 161.053, Florida Statutes, and filed in the public records of Bay County, which defines that portion of the beach dune system subject to severe fluctuations based on a 100-year storm surge, storm waves or other predictable weather conditions.
Coastal Construction Control Line means the line established by the Florida Department of Environmental Protection after a determination, through comprehensive engineering study and topographic survey, that the establishment of such control line is necessary for the protection of upland properties and the control of beach erosion, pursuant to Section 161.053, Florida Statutes.

Examples of Coastal Construction Control Line in a sentence

  • This subsection applies to activities located in uplands and waters of the state, including wetlands, but excludes activities located along the sandy beaches or inlets fronting the Atlantic Ocean and the Gulf of Mexico seaward of the Coastal Construction Control Line (CCCL) in counties where a CCCL has been established (these activities are addressed in subsection C.3. of this Order).

  • The subject property spans multiple flood zones, with portions of the property seaward of the Coastal Construction Control Line, and in the Coastal High Hazard Area as defined by Naples Comprehensive Plan.

  • Delineation of the Coastal Construction Control Line or notation that the site is seaward of the coastal construction control line, if applicable.

  • Projects west of the Coastal Construction Control Line require a permit from the FL Department of Environmental Protection.

  • Project Seaward of the CCCL?Determine if the project site is located seaward of the Coastal Construction Control Line.

  • Maximum height for properties outside of the Coastal Construction Control Line (CCCL) is to be measured from one foot above the crown of the road directly in front of the property.

  • Boundary and topographic survey, including the location of all easements, rights of way, and Coastal Setback Line or Coastal Construction Control Line as appropriate.

  • This can be done through implementation of a Coastal Construction Control Line or CCCL.

  • A Coastal Construction Control Line will prohibit construction within a certain distance of the sea.

  • Coordinate with the Department of Environmental Protection on permits for development located seaward of the Coastal Construction Control Line.


More Definitions of Coastal Construction Control Line

Coastal Construction Control Line. (CCCL) means the line established pursuant to the provisions of F.S. Ch.
Coastal Construction Control Line means the line established in accordance with Section 161.053, Florida Statutes, which represents the landward limit of areas at risk of significant

Related to Coastal Construction Control Line

  • Original construction ’ shall mean the first or initial construction

  • New construction means, for the purposes of determining insurance rates, structures for which the “start of construction” commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, new construction means structures for which the start of construction commenced on or after the effective date of a floodplain management regulation adopted by a community and includes any subsequent improvements to such structures.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • Commencement of Construction means the initial disturbance of soils associated with clearing, grading, or excavating activities or other construction activities.

  • Construction project means the same as that term is defined in Section 38-1a-102.