Examples of Connected Delivery Facility in a sentence
For the purposes of this Section L a "Maintenance Relevant Facility" is a Connected Delivery Facility or Connected Offtake System or the Consumer's Plant at an NTS Supply Point, and a "Maintenance Relevant Party" is any User, a relevant Transporter, a Delivery Facility Operator, Connected Offtake System Operator or (in relation to an NTS Supply Point) the consumer.
This first element is outside of UNC arrangements and the scope of this Modification Proposal, although the existing UNC definition of a Connected Delivery Facility will apply to the hydrogen gas production facility.• The second element which will be owned and operated by Scotland Gas Networks Plc, is the gas transportation network which will require a new purpose-built low-pressure network to be constructed in parallel with the existing natural gas network to supply hydrogen to consumer’s homes.
This first element is outside of UNC arrangements and the scope of this Modification Proposal, although the existing UNC definition of a Connected Delivery Facility will apply to the hydrogen gas production facility.• The second element which will be owned and operated by Scotland Gas Networks Plc, is the gas transportation network which will require a new purpose-built low-pressure network to be constructed in parallel with the existing natural gas network to supply hydrogen to customer’s homes.
The ratio of this allocation of revenues between capacity and commodity is known as the capacity/commodity split.TAR NC requires that the transmission services revenue is recovered through capacity-based charges and that flow-based charges, i.e. commodity charges, should only recover the variable costs associated with the quantity of gas transported.
This first element is outside of UNC arrangements and the scope of this Modification Proposal, although the existing UNC definition of a Connected Delivery Facility will apply to the Hydrogen gas production facility.• The second element which will be owned and operated by Scotland Gas Networks Plc, is the gas transportation network which will require a new purpose-built low-pressure network to be constructed in parallel with the existing natural gas network to supply Hydrogen to consumer’s homes.
Where in relation to a Connected Delivery Facility there is (in accordance with paragraph 1.4.2) more than one System Entry Point the Network Entry Provisions applicable in respect of each System Entry Point may be contained in one Network Entry Agreement.
NGN hereby notifies you that, due to a [constraint on the System][breach of the Gas Entry Conditions], the System is unable to accept, to the extent identified in this TFA, Gas from the DFO’s Connected Delivery Facility at the rate and/or amount specified in the latest DFN.
An Aggregate System Entry Point is a System Entry Point, or (in the casewhere in relation to a Connected Delivery Facility there is more than one System Entry Point and/or there are several adjacent Connected Delivery Facilities) any two or more of the System Entry Points in respect of such Connected Delivery Facility(ies) so designated by National Gas Transmission pursuant to paragraph 1.5.2.
Where so specified pursuant to paragraph 1.4.3 by agreement of the Delivery Facility Operators, a System Entry Point may comprise the Individual System Entry Points at which more than one Connected Delivery Facility, each in operation at 1 March 1996, is connected to the Total System.
IGT" LDZ System Entry Point where the Connected Delivery Facility is a pipeline system operated by an Independent Gas Transporter ("relevant IGT system"), and where so provided in an agreement referred to in paragraph 3.12.5, an IGT LDZ System Entry Point may be treated as comprising separate System Entry Points for such purposes as are specified in such agreement.