Construction Dewatering definition

Construction Dewatering means the act of draining or pumping stormwater or groundwater
Construction Dewatering means the removal of water for construction activities by pumping, drainage or evaporation.
Construction Dewatering means the removal of water through any means from Premises to facilitate Construction, including but not limited to one or more of the following:

Examples of Construction Dewatering in a sentence

  • FMP Warszawa cooperates with airspace users in cases connected with ATFCM.Airspace of FIR Warszawa is divided in 8 sectors (B, C, D, G, J, R, SE, T – sectors S and E are usually joined).

  • The Contractor shall construct settling ponds for effluent from dewatering operations, as required by the Construction Dewatering Permit.

  • In the event the dewatering plan does not comply with those requirements applicable to the Noticed General Permit for Short-term Construction Dewatering the Company shall not proceed with further permitting or dewatering activities, shall notify JEA of any failure to meet applicable standards, requirements, or rules, and shall await instruction from JEA.

  • Construction Dewatering shall not be discharged to the sanitary sewer.

  • If Company encounters groundwater, the Company shall be responsible for obtaining; a Generic Permit for Discharge of Produced Ground Water From any Non-Contaminated Site Activity from the Florida Department of Environmental Protection (FDEP), and a Noticed General Permit for Short-term Construction Dewatering from the St. Johns River Water Management District (SJRWMD) before any dewatering activities can begin.

  • The Contractor must obtain a Notice of Intent to Use Noticed General Permit for Short Term Construction Dewatering (Form 40C-22-0590-1) prior to the commencement of any dewatering.

  • The Design-Builder shall be responsible for handling, treating, discharging and/or disposing of any contaminated water removed from excavations per the Part 5 – Special Provisions – Handling and Treatment of Contaminated Construction Dewatering Fluids.

  • Instructions (CGP 1.2.5. and 2.3.7.):If you will be discharging storm water that is removed from excavations, trenches, foundations, vaults, or other similar points of accumulation, it must be permitted by UPDES permit UTG070000 (Construction Dewatering and Hydrostatic Testing Permit) unless it can be managed onsite through percolation or evaporation.

  • The Owner acknowledges and agrees that prior to building permit issuance a Construction Dewatering Management Plan is provided for review due to possible ground water contamination.

  • No groundwatering operation shall begin until a Construction Dewatering Permit has been obtained from the Colorado Department of Health and Environment (CDPHE).


More Definitions of Construction Dewatering

Construction Dewatering means the action of pumping or actively removing ground water, surface water, and/or accumulated storm water from a construction site or other related activities. MPDES General Permit for Construction Dewatering applies to the discharge of construction dewatering effluent to state surface water with increased sediment and turbidity as the primary pollutants of concern, including:
Construction Dewatering means the act of draining or pumping stormwater or groundwater from building foundations, vaults, and trenches, or other similar points of accumulation, including from sediment basins or similar impoundments for maintenance or decommissioning purposes. Construction dewatering does not include temporary pumparounds associated with instream construction activities.
Construction Dewatering means the act of pumping ground water or storm water away from an active construction site.
Construction Dewatering means the act of pumping groundwater or storm water away from an active construction site.
Construction Dewatering means the process of draining an excavated area that is flooded with rain water or groundwater before construction can start.

Related to Construction Dewatering

  • construction site means a workplace where construction work is being performed;

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Construction Work means any work in connection with⎯

  • Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,

  • Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;

  • Construction and demolition waste means waste from building materials, debris and rubble resulting from construction, remodeling, repair and demolition operations;