Examples of Construction Stormwater Control Plan in a sentence
Construction site operators shall modify their Construction Stormwater Control Plan to maintain compliance whenever there is a change in design, construction, operation, or maintenance at the site that has, or could have, a significant effect on the discharge of pollutants to waters of the state.
Construction site operators shall maintain, update, and implement their Construction Stormwater Control Plan.
For projects with 5,000 square feet or more of new plus replaced impervious surface or 7,000 square feet or more of land disturbing activity, site inspections shall be conducted by a Certified Erosion and Sediment Control Lead who shall be identified in the Construction Stormwater Control Plan and shall be present on-site or on-call at all times.
Construction Stormwater Control Plan (Standard Erosion and Sediment Control Plan).
Large Project Construction Stormwater Control Plan Narrative: Thornton Creek Confluence Project.
Since more than one (1) acre of disturbance is proposed the applicant shall demonstrate that coverage from the NYSDEC under GP-0-15-002, including a Full SWPPP (Erosion & Sedimentation and Post Construction Stormwater Control Plan) has been obtained.
However, please reference Section 01 11 00, paragraph 1.17 Construction Stormwater Control Plan Erosion, and Sediment Control, sub paragraphs A & B and the Streambed Alteration Agreement paragraphs 2.47 through 2.51 for requirements related to stormwater control, erosion prevention, and sediment control.
All projects must submit a Construction Stormwater Control Plan (Section 2.3); however, the project category determines what level of detail is required for the plan documentation.
Since more than one (1) acre of disturbance is proposed, the Applicant shall obtain coverage from the NYSDEC under GP-02-01 including a Full SWPPP (Erosion & Sedimentation and Post Construction Stormwater Control Plan).
Currently, the contact is Daniela Schwedas.For parcel-based projects that get a DPD construction permit, the DPD Drainage and Side Sewer reviewers also review the dewatering design (included in the Construction Stormwater Control Plan plan).