Construction Survey definition

Construction Survey means a survey of —
Construction Survey means the measurements made to control elevation, horizontal position and dimensions, and configuration, prior to or while construction is in progress.21.2 Attesting to Quality and Responsibility for Surveys To provide the client with the assurance that the work was performed under the direct supervision of a licensee, and was performed to a certain standard, documentation shall be sealed and signed by the licensee inresponsible charge, including, but not limited to, the following: 1. When a boundary, route, easement, or lease survey is performed, a plat shall be prepared and the plat shall bear the seal and signature of the Professional Surveyor in responsible charge.2. When a topographic survey, hydrographic survey or construction survey is performed at the request of a client, any plat, map or report that is the final product of that licensee for that project shall be sealed and signed by the Professional Surveyor or the Professional Engineer in responsible charge. If a topographic survey, hydrographic survey or construction survey is performed by a licensee to obtain data to be used by that licensee to perform calculations or to be incorporated into a final product of that project, then the final product of that project shall be sealed and signed by the Professional Surveyor or the Professional Engineer in responsible charge. 21.3 The boundary, route, easement, and lease survey plat shall conform to the following requirements and shall include the followinginformation:
Construction Survey means the measurements made to control elevation, horizontal position and dimensions, and configuration, prior to or while construction is in progress. Source: Miss. Code Ann.§73-13-15

Examples of Construction Survey in a sentence

  • If there is no provision in the Contract documents for a Construction Survey Bid Item, the Engineer will set the necessary centerline, slopes and grade stakes promptly upon notification by the Contractor that stakes are needed, unless otherwise noted on the Plans.

  • Minimum standards for Construction Survey provided by the Engineer will meet the requirements of Section 2526.

  • Post Construction Survey: After completion of pier placement, the Contractor shall provide the Owner’s Representative with an as-built survey showing the actual locations of the piers at the top elevations.

  • Post Construction Survey: After completion of pile driving, the Contractor shall provide the Architect/Engineer with an as-built survey showing the actual locations of the piles at cut-off elevations.

  • The Reinstatement Panel will carefully consider the explanations given and examine any related evidence (for example recorded delivery or bank records).

  • Field Notes are routed to Sustainable Development and Construction Survey Section for approval.

  • Field Notes are routed to Sustainable Development and Construction Survey Section for approval.12.

  • This phase of the work may or may not be performed in conjunction with Phase F "Construction Survey and Layout Phase" of this agreement.

  • After Field Notes are approved by the Sustainable Development and Construction Survey Section, the field notes and the warranty deed are sent to Real Estate Services.13.

  • When a plan for a Construction Survey is prepared, the certification identified in § 1.9.7(C) of this Part shall be included on the plan.


More Definitions of Construction Survey

Construction Survey means the laying of stakes for a construction project.
Construction Survey means a survey to position on the ground physical structures and/or improvements that have been designed for a particular tract of land.

Related to Construction Survey

  • construction site means a workplace where construction work is being performed;

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • construction supervisor means a competent person responsible for supervising construction activities on a construction site;

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Architect/Engineer or “A/E” means the Person identified in the Agreement responsible for providing professional design services and construction contract administration for the Project. The A/E shall be (1) a registered architect holding a license and certificate of authorization issued by the Ohio Architects Board pursuant to ORC Chapter 4703, (2) a landscape architect holding a license and certificate of authorization issued by the Ohio Landscape Architects Board pursuant to ORC Chapter 4703, or (3) a professional engineer or professional surveyor holding a license and certificate of authorization issued by the Ohio Engineers and Surveyors Board pursuant to ORC Chapter 4733. As used in the Agreement, the term A/E may include a criteria architect or engineer for a Design-Build project.

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Land surveyor means the land surveyor appointed by the Seller, to act as such from time to time in respect of the Development or a member of a firm so appointed.

  • Survey means a survey of the Property prepared by a surveyor licensed in the State and satisfactory to Lender and the company or companies issuing the Title Insurance Policy, and containing a certification of such surveyor satisfactory to Lender.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Construction Work means any work in connection with⎯

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Architect means the person or other entity engaged by the PHA to perform architectural, engineering, design, and other services related to the work as provided for in the contract. When a PHA uses an engineer to act in this capacity, the terms “architect” and “engineer” shall be synonymous. The Architect shall serve as a technical representative of the Contracting Officer. The Architect’s authority is as set forth elsewhere in this contract.

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • Plans and Specifications means the plans, drawings and specifications reasonably necessary to properly assess and review proposed Work prior to issuance of any approval that may be required under this Agreement;

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Construction Completion Certificate means a document:

  • Design-Build Firm means a partnership, corporation or other legal entity that:

  • Professional land surveyor means a professional land surveyor licensed under ch. 443.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Architect/Engineer (A/E means a person registered as an architect pursuant to Tex. Occ. Code Ann., Ch. 1051, as a landscape architect pursuant to Tex. Occ. Code Ann., Ch. 1052, a person licensed as a professional engineer pursuant Tex. Occ. Code Ann., Ch. 1001, and/or a firm employed by Owner or Design-Build Contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.

  • construction work permit means a document issued in terms of regulation 3; "contractor" means an employer who performs construction work;

  • Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.

  • Contracting Body Satisfaction Survey shall have the meaning set out in Clause 18.1;