Cost Estimator definition

Cost Estimator shall have the meaning set forth in Section
Cost Estimator has the meaning set forth in Section 2.3 below. "Design Development Documents" has the meaning set forth in Section 4.5 below. "Developer" has the meaning set forth in the introductory paragraph hereof. "Development Agreement" has the meaning set forth in the introductory paragraph hereof. "Development Fee" has the meaning set forth in Article 9 below. "Director of Regulation" means the director of gaming operations appointed by the Authority pursuant to the Tribe's Gaming Ordinance. "Effective Date" means, the first (1st) day of the first (1st) calendar month following the later of (a) the date the Authority receives all Required Approvals with respect to the Development Agreement, or (b) closing of the Proposed Financing. "Executive Project Committee" means the Authority Representative, the Project Executive and senior executives of each of the Architect and the Construction Manager. "Final Budget" has the meaning set forth in Section 5.3 below. B-2
Cost Estimator has the meaning set forth in Section 2.3 below.

Examples of Cost Estimator in a sentence

  • MDOT will procure a separate Independent Cost Estimator (ICE), with whom MDOT and the CMGC will collaborate with throughout the design phase of the Project.

  • The Construction Manager shall participate in a meeting with the Department and Independent Cost Estimator (ICE) to establish baseline production rate assumptions and various other input standards for formulation of future cost and schedule estimates.

  • Compliance Monitoring Fees (annual):$75 per low-income unit within a multiple building project$85 per low-income unit when each BIN is its own project building$140 per low-income unit for buildings in which the owner has elected average income Reimbursement for Cost Estimator: Applicants with projects involving rehabilitation or adaptive re-use are responsible for the cost of the independent cost estimator.

  • Lead Cost Estimator – This position is responsible for overseeing the development of cost estimates for the Project.

  • MnDOT will retain an Independent Cost Estimator (ICE) and Engineer’s Estimator (EE) who will provide comparative price estimates both during and at the end of design.

  • Submit an organizational chart containing the names of each key staff member (Project Manager, Superintendent, Cost Estimator, Scheduler, etc.), together with their resumes, who will be proposed to provide the requested services, including their qualifications and recent relevant experience providing similar services.

  • Licenses and any other pertinent information shall be submitted which demonstrates satisfaction of all the Cost Estimator requirements identified in Section 3.5, “Minimum Qualification and Experience Requirements.”Additionally, a detailed resume is required to be submitted for the Cost Estimator that reflects the Cost Estimator’s education, qualifications, and experience within the last five years on currently ongoing or completed projects similar in nature to the Project described in this RFQ.

  • Proposer shall complete and submit Form RFQ-QSC for this section of its Qualification for the Cost Estimator.

  • Each of the CONSULTANT employees assigned as a Cost Estimator shall have at least ten(10) years experience in estimating complex highway projects for contractors.

  • Cost Estimator Tools Changing the way you access health care information for the better, my Healthcare Cost Estimator (myHCE) allows you to research treatment options based on your specific situation.


More Definitions of Cost Estimator

Cost Estimator means a third party, such as the general contractor chosen by The Township to construct the Project or a cost-estimating consultant, designated by The Township to determine the Estimated Construction Cost. “Estimated Construction Cost” means an estimate of the cost to construct the Project itemized for each Phase of development and for each Major Category of Work. “Contractor” shall mean the general contractor chosen by The Township with input from the Architect to construct the Project. If The Township approves, in its sole and absolute discretion, the Schematic Design Documents, and desires to proceed with the Design Development Phase, it shall issue a written notice to proceed with the Design Development Phase to Architect.

Related to Cost Estimator

  • Cost Estimate means the detailed projected expenditure, including material costs and overhead, equipment costs and overhead, labor costs and overhead, and all taxes associated with each major material and service component, required for a line extension. It shall also separately identify any incremental costs associated with providing premium services. The Company may, for the purpose of standardization, establish standard construction cost estimates, for basic or premium service plans, which shall not exceed, in any event, the average cost of constructing such line extensions in the area involved, in which case the term “cost estimate” as used in this section will be understood to mean the standard estimate thus established.

  • Current closure cost estimate means the most recent of the estimates pre- pared in accordance with § 265.142 (a), (b), and (c).

  • State Estimator means a computer model that computes the state (voltage magnitudes and angles) of the Transmission System using the network model and real-time measurements. Line flows, transformer flows, and injections at the busses are calculated from the known state and the transmission line parameters. The State Estimator has the capability to detect and identify bad measurements.

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Estimate means to be based on technical evaluation of the sources contributing to the discharge including, but not limited to, pump capabilities, water meters, and batch discharge volumes.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Estimated Cost , for the purposes of rule 22, means the estimated cost to maintain, repair or replace a major capital item;

  • Estimated Costs means costs estimated by the Authority as likely to be:

  • Project Expenses means usual and customary operating and financial costs. The term does not include extraordinary capital expenses, development fees and other non-operating expenses.

  • Phase I means the first part of the tuition incentive assistance program defined as the academic period of 80 semester or 120 term credits, or less, leading to an associate degree or certificate.

  • Cost Share means the member’s financial obligation for a covered Service. Depending on the plan type, Cost Share may include one or more of the following: deductible, Copay, Access Fee, and Coinsurance.

  • Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.

  • Operating Costs means the incremental expenses incurred by the Recipient on account of Project implementation, management, and monitoring, including for office space rental, utilities, and supplies, bank charges, communications, vehicle operation, maintenance, and insurance, building and equipment maintenance, advertising expenses, travel and supervision, salaries of contractual and temporary staff, but excluding salaries, fees, honoraria, and bonuses of members of the Recipient’s civil service.

  • SF1-4 Intrinsic Loss Estimate means total losses under this Single Family Shared-Loss Agreement in the amount of eleven million dollars ($11,000,000.00).

  • Cost outlier means cases which have an extraordinarily high cost as established in 79.1(5)“f,” so as to be eligible for additional payments above and beyond the initial DRG payment.

  • Cost price means the actual cost of an item or article of tangible personal property computed in the

  • Intrinsic Loss Estimate means total losses under the shared loss agreements in the amount of One hundred Sixty-eight million dollars ($168,000,000.00).

  • Baseline means the “Initial Small Business Lending Baseline” set forth on the Initial Supplemental Report (as defined in the Definitive Agreement), subject to adjustment pursuant to Section 3(a).

  • Estimated Value means the value of the Contract estimated under these Contract and Procurement Regulations.

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.

  • Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.

  • Operating Expense means salaries, wages, cost of maintenance and operation, materials, supplies, insurance and all other items normally included under recognized accounting practices, but does not include allowances for depreciation in the value of physical property.

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.

  • Quantity Surveyor means a duly qualified quantity surveyor of at least five (5) year’s experience in the assessment of building material and construction costs. Quantity Surveyor Assessment means an assessment by an independent Quantity Surveyor of the Construction Cost to the reasonable satisfaction of the Council. Regulation means the Environmental Planning and Assessment Regulation, 2000 (as amended).

  • Operating parameter value means a minimum or maximum value established for a control device or process parameter that, if achieved by itself or in combination with one (1) or more other operating parameter values, determines that an owner or operator has complied with an applicable emission limit.