Examples of Effluent Requirements in a sentence
SD 001Effluent To Surface Water Surface Discharge: Minor Stabilization Pond Effluent Requirements 6.1.1The Permittee shall submit a monthly DMR : Due by 21 days after the end of each calendar month following permit issuance.
SD 002Effluent To Surface Water Surface Discharge: Class A Major Facility Effluent Requirements 6.1.1The Permittee shall submit a monthly DMR : Due by 21 days after the end of each calendar month following permit issuance.
Within this owned- and-operated facility, we are applying our Global Effluent Requirements (GER) to address water quality around our production as well as implementing our draft water recycle re-use guidelines.
SD 002Effluent To Surface Water Surface Discharge: Class B Minor Facility Effluent Requirements 6.1.1The Permittee shall submit a monthly DMR : Due by 21 days after the end of each calendar month following permit issuance.
The District finals will be held at the Third Quarter District Conference meeting.
Coli – Escherichia Coli Bacteria5Thirty (30) day Geometric Mean6Seven (7) day Geometric Mean7Total Nitrogen is the summation of the analytical results for Total Nitrates, Total Nitrites, and Total Kjeldahl Nitrogen 1.3. Standard Effluent Requirements The discharges to Waters of the Commonwealth shall not produce floating solids, visible foam or a visible sheen on the surface of the receiving waters.
The following Tables compare the required removal efficiencies at each of the demonstration sites for treated wastewater to be discharged, as outlined in Table 3-6 Effluent Requirements Minimum % Reduction in Parameters, with proven removal efficiencies offered by the individual INNOQUA Technologies; outlined in Chapter 4, Table 4-2, Table 4-4, Table 4-5 and Table 4-7.
Table 12: Treated Effluent Requirements Parameter PEQS Value (mg/L) COD removal, by any biological treatment, would not exceed about 1.6 to 1.8 times the amount of BOD removed.
SD001Effluent To Surface Water Surface Discharge: Minor Stabilization Pond Effluent Requirements 6.1.1The Permittee shall submit a monthly DMR : Due by 21 days after the end of each calendar month following permit issuance.