Existing and historic use period definition

Existing and historic use period or "historic period" means the period of time prior to the effective date during which an existing well or well system produced groundwater from an aquifer within the district.
Existing and historic use period means the period of time from January 1, 1992, through the May 31, 2002, for all land within the boundaries of the District as such boundaries existed on May 31, 2002, and means the period of time from January 1, 1992, through November 16, 2005, for all other land within the boundaries of the District.
Existing and historic use period means the time period that includes the Existing Use Period from January 1, 1992, through January 7, 2003, and the Historic Use Period from January 1, 1960, through December 31, 1991.

Related to Existing and historic use period

  • Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);

  • CIC Protection Period means the two-year period beginning on the date of a Change in Control and ending on the day before the second annual anniversary of the date of the Change in Control.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Historic Structure means any structure that is:

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.

  • Erosion and sediment control plan means a comprehensive plan developed to address pollution caused by erosion and sedimentation of soil particles or rock fragments during construction.

  • Closing protection letter means an agreement by the division to indemnify a lender or owner or both for loss caused by a division closer’s theft of settlement funds or failure to comply with written closing instructions relating to title certificate coverage when agreed to by the division closer.

  • Certified historic structure means a building that is

  • Change in Control Protection Period means the period beginning on the date of the consummation of the Change in Control and ending on the first anniversary of such Change in Control.

  • Historic resource means a publicly or privately owned historic building, structure, site, object, feature, or open space located within an historic district designated by the national register of historic places, the state register of historic sites, or a local unit acting under the local historic districts act, 1970 PA 169, MCL 399.201 to 399.215, or that is individually listed on the state register of historic sites or national register of historic places, and includes all of the following:

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • National Ambient Air Quality Standards or “NAAQS” means national ambient air quality standards that are promulgated pursuant to Section 109 of the Act, 42 U.S.C. § 7409.

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

  • Stormwater management system means any equipment, plants,

  • Project labor agreement means an agreement by which labor organizations agree to terms and conditions of employment, to cooperate in resolving labor disputes, and to maintain labor peace on the Project.

  • Planning and service area or “PSA” means a geographic area of the state that is designated by the commission for purposes of planning, development, delivery and overall administration of services under a multiyear area plan. “PSA” may be interpreted as either singular or plural dependent on context. “Provider” means any person, company, firm, association or other legal entity that provides services

  • Community rehabilitation program means a program that provides directly or facilitates the provision of one or more of the following vocational rehabilitation services to individuals with disabilities to enable those individuals to maximize their opportunities for employment, including career advancement:

  • Historic site means any real property, man-made structure,

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Contracting and procuring means the systems for obtaining the supply of goods, materials, manufactured items, services, building and engineering services, works of construction and maintenance and for disposal of surplus and obsolete assets.

  • Interim Number Portability or “INP” means the use of existing and available call routing, forwarding, and addressing capabilities (e.g. remote call forwarding) to enable a Customer to receive Telephone Exchange Service provided by any Local Exchange Carrier operating within the exchange area with which the Customer’s telephone number(s) is associated, without having to change the telephone number presently assigned to the Customer and regardless of whether the Customer’s chosen Local Exchange Carrier is the carrier that originally assigned the number to the Customer.

  • Public Finance Management Act ’ means the Public Finance Management Act, 1999 (Act No. 1 of 1999);

  • Resource Conservation and Recovery Act means the Resource Conservation and Recovery Act, 42 U.S.C. Section 6901, et seq., as in effect from time to time.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.