Examples of Facility certification in a sentence
The required data shall be submitted within thirty (30) days of the end of each reporting period on forms provided by the District or by providing copies of reports required by the State for Solid Waste Facility certification.
The site audit is a review by CAISO of the Metering Facility data as recorded as part of the Metering Facility certification and as documented in the most current Site Verification Data Sheet on file at CAISO.
Operator will submit prior to delivery of electrical output from the Facility to Dominion North Carolina Power evidence of Qualifying Facility certification.
Section 3.2.3 describes the specific requirements for certification and the maintenance of Metering Facility certification for CAISO Metered Entities.
Standard: If a Resource Agency has recommended removal of a dam associated with the Facility, certification is not allowed.
The Retail Marijuana Testing Facility certification program is contingent upon successful on-site inspection, successful participation in proficiency testing, and ongoing compliance with the applicable requirements in this rule.
The required data shallbe submitted within thirty (30) days of the end of each reporting period on forms provided by the District or by providing copies of reports required by the State for Solid Waste Facility certification.
Following Facility certification and prior to commencement of construction, geotechnical borings will be performed as determined necessary by a professional engineer to allow foundation design to be finalized for turbine locations.
The purpose of Loblaw Brands Limited (LBL) "Made in a Peanut-Free Facility" certification program is to certify food products processed in facilities that are free of peanuts and tree nuts.
Facility certification shall be performed in the operational condition, upon completion of facility construction and equipment installation and prior to exposure of clean flight hardware or other sensitive hardware.