Facility Operating Constraints definition

Facility Operating Constraints means the physical and operational constraints of the Facility to accommodate the operation of trains as specified in paragraph 5 of Schedule 2 or as published from time to time by ABP;
Facility Operating Constraints means the physical and operational constraints of the Facility to accommodate the operation of trains as specified in paragraph 5 of Schedule 2 or as published from time to time by DB Cargo;
Facility Operating Constraints means the physical and operational constraints of the facility to accommodate the operation of trains as specified in paragraph 5 of Schedule 2 or as published from time to time by DB Cargo; “facility owner” has the meaning ascribed to it under section 17(6) of the Act; “Facility Services” are those services to be provided by DB Cargo to [ BShort ] and which are included in the Access Sum, as more particularly described in paragraph 6 of Schedule 2;

Examples of Facility Operating Constraints in a sentence

  • The Train Operator shall use its reasonable endeavours to ensure that any Specification provided in accordance with this Clause 7.1 conforms to the Facility Operating Constraints.

  • ABP shall use its reasonable endeavours, having regard to the Facility Operating Constraints, the Decision Criteria and its Safety Obligations, to provide such Stabling facilities as are necessary or expedient for or in connection with the provision of the Services.

  • Other Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by ABP from time to time.

  • The Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by ABP from time to time.

  • Other Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by the Facility Owner from time to time.

  • Further details of the Service Facility Operating Constraints are specified in the relevant DB Cargo Safe System of Work and any relevant instructions, as amended from time to time, or otherwise provided to the Access Beneficiary by DB Cargo periodically.

  • If either party proposes an amendment to this Contract (other than in respect of the matters dealt with by Clause 8, the Service Facility Operating Constraints Change Procedure or Clause 11), it shall notify the other party of the details of the proposed amendment and the Second Level Representatives of the parties shall meet within eight (8) Working Days of such notification to discuss the proposed amendment with a view to reaching agreement regarding it.

  • XX Xxxxxxxx shall use its reasonable endeavours to ensure that any Specification provided in accordance with this Clause 7.1 conforms to the Facility Operating Constraints.

  • DBCi shall use its reasonable endeavours, having regard to the Facility Operating Constraints, the Decision Criteria and its Safety Obligations, to provide such Stabling facilities as are necessary or expedient for or in connection with the provision of the Train Services.

  • The facility has the capacity to accommodate [ insert capacity – trains per week/maximum train length or other measure ] Other Facility Operating Constraints will be specified in the relevant Safe System of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by DB Cargo from time to time.

Related to Facility Operating Constraints

  • Interconnected Reliability Operating Limit or “IROL” shall mean the value (such as MW, MVAR, Amperes, Frequency, or Volts) derived from, or a subset of, the System Operating Limits, which if exceeded, could expose a widespread area of the bulk electrical system to instability, uncontrolled separation(s) or cascading outages.

  • Facility Operator means a person that controls the operation of a facility.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Day-ahead Scheduling Reserves Resources means synchronized and non-synchronized generation resources and Demand Resources electrically located within the PJM Region that are capable of providing Day-ahead Scheduling Reserves.

  • Limited Resource Constraint means, for the 2017/2018 Delivery Year and for FRR Capacity Plans the 2017/2018 and Delivery Years, for the PJM Region or each LDA for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for a Delivery Year, a limit on the total amount of Unforced Capacity that can be committed as Limited Demand Resources for the 2017/2018 Delivery Year in the PJM Region or in such LDA, calculated as the Limited Demand Resource Reliability Target for the PJM Region or such LDA, respectively, minus the Short Term Resource Procurement Target for the PJM Region or such LDA, respectively.

  • Day-ahead Scheduling Reserves Requirement means the sum of Base Day-ahead Scheduling Reserves Requirement and Additional Day-ahead Scheduling Reserves Requirement.

  • Least developed country construction material means a construction material that—

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility. Interconnection Customer:

  • Train Loading Infrastructure means conveyors, stockpile areas, blending and screening facilities, stackers, re‑claimers and other infrastructure reasonably required for the loading of iron ore, freight goods or other products onto the relevant Railway for transport (directly or indirectly) to a loading port; and

  • Environmentally constrained area means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.

  • Generating Facility means the Generating Unit(s) comprising Seller’s power plant, as more particularly described in Section 1.02 and Exhibit B, including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.

  • Continuous emission monitoring system or "CEMS" means the equipment required under section 11 of this rule to sample, analyze, measure, and provide, by means of readings recorded at least once every fifteen (15) minutes, using an automated data acquisition and handling system (DAHS), a permanent record of nitrogen oxides emissions, stack gas volumetric flow rate, stack gas moisture content, and oxygen or carbon dioxide concentration, as applicable, in a manner consistent with 40 CFR 75*. The following systems are the principal types of continuous emission monitoring systems required under section 11 of this rule:

  • Train Unloading Infrastructure means train unloading infrastructure reasonably required for the unloading of iron ore from the Railway to be processed, or blended with other iron ore, at processing or blending facilities in the vicinity of that train unloading infrastructure and with the resulting iron ore products then loaded on to the Railway for transport (directly or indirectly) to a loading port. Company to obtain prior Ministerial in-principle approval

  • Standard Operating Procedures or “SOP” means the procedures as specified in the Annexes or Attachments to the relevant Schedules;

  • Base Capacity Demand Resource Constraint for the PJM Region or an LDA, shall mean, for the 2018/2019 and 2019/2020 Delivery Years, the maximum Unforced Capacity amount, determined by PJM, of Base Capacity Demand Resources and Base Capacity Energy Efficiency Resources that is consistent with the maintenance of reliability. As more fully set forth in the PJM Manuals, PJM calculates the Base Capacity Demand Resource Constraint for the PJM Region or an LDA, by first determining a reference annual loss of load expectation (“LOLE”) assuming no Base Capacity Resources, including no Base Capacity Demand Resources or Base Capacity Energy Efficiency Resources. The calculation for the PJM Region uses a daily distribution of loads under a range of weather scenarios (based on the most recent load forecast and iteratively shifting the load distributions to result in the Installed Reserve Margin established for the Delivery Year in question) and a weekly capacity distribution (based on the cumulative capacity availability distributions developed for the Installed Reserve Margin study for the Delivery Year in question). The calculation for each relevant LDA uses a daily distribution of loads under a range of weather scenarios (based on the most recent load forecast for the Delivery Year in question) and a weekly capacity distribution (based on the cumulative capacity availability distributions developed for the Installed Reserve Margin study for the Delivery Year in question). For the relevant LDA calculation, the weekly capacity distributions are adjusted to reflect the Capacity Emergency Transfer Limit for the Delivery Year in question. For both the PJM Region and LDA analyses, PJM then models the commitment of varying amounts of Base Capacity Demand Resources and Base Capacity Energy Efficiency Resources (displacing otherwise committed generation) as interruptible from June 1 through September 30 and unavailable the rest of the Delivery Year in question and calculates the LOLE at each DR and EE level. The Base Capacity Demand Resource Constraint is the combined amount of Base Capacity Demand Resources and Base Capacity Energy Efficiency Resources, stated as a percentage of the unrestricted annual peak load, that produces no more than a five percent increase in the LOLE, compared to the reference value. The Base Capacity Demand Resource Constraint shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Generating Facilities means Interconnection Customer’s device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities. Generation Interconnection Customer:

  • Base Day-ahead Scheduling Reserves Requirement means the thirty-minute reserve requirement for the PJM Region established consistent with the Applicable Standards, plus any additional thirty-minute reserves scheduled in response to an RTO-wide Hot or Cold Weather Alert or other reasons for conservative operations. Base Load Generation Resource

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • PJM Region Reliability Requirement means, for purposes of the Base Residual Auction, the Forecast Pool Requirement multiplied by the Preliminary PJM Region Peak Load Forecast, less the sum of all Preliminary Unforced Capacity Obligations of FRR Entities in the PJM Region; and, for purposes of the Incremental Auctions, the Forecast Pool Requirement multiplied by the updated PJM Region Peak Load Forecast, less the sum of all updated Unforced Capacity Obligations of FRR Entities in the PJM Region.

  • General purpose equipment means equipment, which is not limited to research, medical, scientific or other technical activities. Examples include office equipment and furnishings, modular offices, telephone networks, information technology equipment and systems, air conditioning equipment, reproduction and printing equipment, and motor vehicles.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Primary dose monitoring system means a system which will monitor the useful beam during irradiation and which will terminate irradiation when a preselected number of dose monitor units have been delivered.

  • State Level Monitoring Cell means the body constituted by the State Government for the control and elimination of ragging in institutions within the jurisdiction of the State, established under a State Law or on the advice of the Central Government, as the case may be.

  • Maintenance and Operations Revenue or “M&O Revenue” means (i) those revenues which the District receives from the levy of its annual ad valorem maintenance and operations tax pursuant to Section 45.002 of the TEXAS EDUCATION CODE, or other lawful authority, and Article VII § 3 of the TEXAS CONSTITUTION, plus (ii) all State revenues to which the District is or may be entitled under the applicable provisions of the TEXAS EDUCATION CODE or any other statutory provision as well as any amendment or successor statute to these provisions, as applicable, less

  • WTO GPA country construction material means a construction material that—