Frame Delay Variation definition

Frame Delay Variation also known as packet jitter, is a measurement of the average variation (measured in milliseconds) in the time delay for packet transfers between two performance test frames. Frame Delay Variation is determined by Crown Castle by averaging sample measurements taken each calendar month between designated points of presence. If Frame Delay Variation in any month exceeds the number of milliseconds set forth in the table below and such failure is quality- impacting, Licensee shall be entitled to a Product Credit equal to the percentage of the applicable MRC set forth in the following table: 2ms or less No Credit No Credit No Credit No Credit >2ms to 3ms No Credit No Credit No Credit 10% >3ms to 4ms No Credit 10% 15% 30% >4ms 10% 20% 30% 50%
Frame Delay Variation also known as packet jitter, is a measurement of the average variation (measured in milliseconds) in the time delay for packet transfers between two performance test frames. Frame Delay Variation is determined by Service Provider by averaging sample measurements taken each calendar month between designated points of presence. If Frame Delay Variation in any month exceeds the number of milliseconds set forth in the table below and such failure is service-impacting, Subscribing Entity shall be entitled to a Service Credit equal to the percentage of the Service MRC set forth in the following table: 2ms or less No Credit >2ms to 3ms No Credit >3ms to 4ms No Credit >4ms 10%

Examples of Frame Delay Variation in a sentence

  • The monthly Jitter / Frame Delay Variation is calculated as the average of all of the frame delay variation measurements during such calendar month and is expressed in milliseconds (ms).

  • Jitter or Frame Delay Variation is defined as the variation in delay for two consecutive frames that are transmitted (one way) from a network origination point and received at a network destination point (TWC network hub to TWC network hub).

  • Product Credits issued to Licensee hereunder shall be Licensee’s sole and exclusive remedy at law or in equity on account of any Outage and/or failure to meet any objectives or parameters (including, without limitation, Network Latency, Frame Delivery Rate (Packet Delivery) or Frame Delay Variation (Jitter)) set forth in this Supplement.

  • Service Credits issued to Customer hereunder shall be Customer’s sole and exclusive remedy at law or in equity on account of any Service Outage and/or failure to meet any objectives or parameters (including, without limitation, Network Latency, Frame Delivery Rate (Packet Delivery) or Frame Delay Variation (Jitter)) set forth in this Supplement.

  • In no event shall Service Credits in any month for any and all interruptions, disruptions, failures, and/or degradations in Service (including, without limitation, any Service Outages or failure to meet any Network Latency, Frame Delivery Rate (Packet Loss), Frame Delay Variation (Jitter) or other objectives or parameters set forth in this Supplement) exceed fifty percent (50%) of the MRC for the affected Service for that month.

  • Vendor shall list values for each of the following attributes (Frame Delay, Frame Delay Variation, Frame Loss Ratio, and Availability) for each CoS marking and these variables must be in minimal accordance with sections 13, 14, and 15 of this document.

  • The service has an expectation of low Frame Delay, Frame Delay Variation and Frame Loss Ratio.

  • In no event shall Product Credits in any month for any and all interruptions, disruptions, failures, and/or degradations in quality (including, without limitation, any Product Failures or failure to meet any Network Latency, Frame Delivery Rate (Packet Loss), Frame Delay Variation (Jitter) or other objectives or parameters set forth in this Supplement) exceed fifty percent (50%) of the MRC for the affected Product for that month.

  • The below values of the following performance parameters (Frame Loss, Frame Delay, Frame Delay Variation) are common (approximate) in the backbone network of the Provider and in the access network with regard to provision of GTS Ethernet Line.

  • The value is provided as an average per calendar month;• Frame Delay Variation (= Frame Jitter) – variation of Frame Delay between the source and destination UNI.

Related to Frame Delay Variation

  • Tenant Delays means (A) Tenant’s request for changes to Landlord’s Work, regardless of whether any such changes are performed, (B) construction of any such changes, (C) Tenant’s request for materials, finishes, or installations requiring unusually long lead times that were not originally included as a part of Landlord’s Work, (D) Tenant’s delay (which shall mean more than 5 business days) in reviewing, revising, or approving any plans and specifications relating to Landlord’s Work, (E) Tenant’s delay in providing information critical to the normal progression of the Project (Tenant shall provide such information as soon as reasonably possible, but in no event longer than 5 business days after receipt of any request for such information from Landlord), and (F) any other act or omission by Tenant or any Tenant Party (as defined herein), or persons employed by any of such persons, (iv) “Substantially Completed” means the substantial completion of Landlord’s Work (A) in a good and workmanlike manner, (B) in accordance with the requirements described in Exhibit C, and (C) in accordance with all applicable Legal Requirements (including, but not limited to, securing the applicable final building inspection for Landlord’s Work), subject only to normal “punch list” items, and (v) “Existing Tenant Delay” means the refusal or failure by the Existing Tenant (as defined below) to surrender the Premises by July 1, 2010 in accordance with the terms and conditions of the Existing Lease (as defined below). Landlord will promptly perform such punch list items. Tenant shall obtain, at its sole cost and expense, any applicable use and occupancy permit for the Premises issued by the applicable Governmental Authority. If Tenant does not elect to void this Lease within 5 business days of the lapse of such 60 day period, such right to void this Lease shall be waived and this Lease shall remain in full force and effect. If neither Landlord nor Tenant elects to void this Lease within 5 business days of the lapse of such 60 day period, such right to void this Lease shall be waived and this Lease shall remain in full force and effect. Sequoia Pharmaceuticals, Inc. (“Existing Tenant”), is currently leasing the Premises from Landlord, and the lease agreement (“Existing Lease”) between Landlord and Existing Tenant is scheduled to expire on July 1, 2010 subject to Landlord’s right to advance the expiration date. Tenant understands, acknowledges, and agrees that Landlord makes no guaranty, representation, or assurance that Landlord will be able to recapture the Premises from the Existing Tenant by July 1, 2010 and that Landlord shall have no obligation or duty to seek the vacation or removal of the Existing Tenant from the Premises.

  • Force Majeure Delays means any actual delay in the construction of the Tenant Improvements, which is beyond the reasonable control of Landlord or Tenant, as the case may be, as described in Paragraph 33 of the Lease.

  • Excusable Delays mean delays arising without the fault or negligence of Lessor and Lessor's subcontractors and suppliers at any tier, and shall include, without limitation: (1) acts of God or of the public enemy, (2) acts of the United States of America in either its sovereign or contractual capacity, (3) acts of another contractor in the performance of a contract with the Government, (4) fires, (5) floods, (6) epidemics, (7) quarantine restrictions, (8) strikes, (9) freight embargoes, (10) unusually severe weather, or (11) delays of subcontractors or suppliers at any tier arising from unforeseeable causes beyond the control and without the fault or negligence of both the Lessor and any such subcontractor or supplier.

  • Changes/Extra Work The SUBRECIPIENT shall make no changes to this CONTRACT without the COUNTY’s written consent. In the event that there are new or unforeseen requirements, the COUNTY with the SUBRECIPIENT’s concurrence has the discretion to request official changes at any time without changing the intent of this CONTRACT.

  • Force Majeure Delay means with respect to the Servicer, any cause or event which is beyond the control and not due to the negligence of the Servicer, which delays, prevents or prohibits such Person’s delivery of the reports required to be delivered or the performance of any other duty or obligation of the Servicer under the Indenture, as the case may be, including, without limitation, computer, electrical and mechanical failures, acts of God or the elements and fire; provided, that no such cause or event shall be deemed to be a Force Majeure Delay unless the Servicer shall have given the Indenture Trustee written notice thereof as soon as practicable after the beginning of such delay.

  • Excusable Delay means a delay due to acts of God, governmental restrictions, stays, judgments, orders, decrees, enemy actions, civil commotion, fire, casualty, strikes, work stoppages, shortages of labor or materials or other causes beyond the reasonable control of Borrower, but lack of funds in and of itself shall not be deemed a cause beyond the control of Borrower.

  • Tenant Delay means an actual delay in the occurrence of the Substantial Completion Date or the Final Completion Date with respect to Landlord’s Work as the result of: (1) any unreasonable delay by Tenant in approving the Plans; (2) any request by Tenant that Landlord delay the commencement or completion of Landlord’s Work for any reason; (3) any request by Tenant to change the Plans after initial approval thereof by Tenant, or the making of any changes to Landlord’s Work requested by Tenant and agreed to by Landlord after initial approval of the Plans by Tenant; (4) any failure by Tenant to respond in writing within seven (7) business days after any written request by Landlord for clarification or interpretation of the Plans or for approval of changes in the Plans deemed necessary by Landlord; or (5) any other act or omission of Tenant or its officers, agents, employees or contractors; Notwithstanding the foregoing, no event shall be deemed to be a Tenant Delay until and unless Landlord has given Tenant written notice (the “Tenant Delay Notice”) advising Tenant (i) that a Tenant Delay is occurring, (ii) of the basis on which Landlord has determined that a Tenant Delay is occurring, and (iii) the actions which Landlord believes that Tenant must take to eliminate such Tenant Delay, and Tenant has failed to correct the Tenant Delay specified in the Tenant Delay Notice within forty-eight (48) hours following receipt thereof. No period of time prior to expiration of such 48-hour period shall be included in the period of time charged to Tenant pursuant to such Tenant Delay Notice if Tenant corrects the Tenant Delay specified in the Tenant Delay Notice within such 48-hour period.

  • Construction Change Directive means a written order prepared by Owner Parties and signed by Owner directing Contractor to perform a change in the Work prior to agreeing to a change, if any, to the Contract Time, schedule of performance of the Work, Contract Sum, or Contractor’s compensation.

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Additional SDU Study means a deliverability study that a Developer may elect to pursue as that term is defined in OATT Section 25 (OATT Attachment S). For purposes of Section 23.4.5 of this Attachment H, “Affiliated Entity” shall mean, with respect to a person or Entity:

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • BASE budget means the minimum general fund budget of a district, which includes 80% of the basic

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Baseline Schedule means the initial time schedule prepared by Contractor for Owner’s information and acceptance that conveys Contractor’s and Subcontractors’ activities (including coordination and review activities required in the Contract Documents to be performed by A/E and ODR), durations, and sequence of work related to the entire Project to the extent required by the Contract Documents. The schedule clearly demonstrates the critical path of activities, durations and necessary predecessor conditions that drive the end date of the schedule. The Baseline Schedule shall not exceed the time limit current under the Contract Documents.

  • Base Building Work means the base building work for the Building as described in this Manual.

  • Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;

  • Excused Downtime means the number of minutes in the Charging Period that the LSP is unavailable due to:

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Brand Name or Equal Specification means a specification which uses one or more manufacturer’s names or catalogue numbers to describe the standard of quality, performance, and other characteristics needed to meet District requirements, and which provides for the submission of equivalent products.

  • piece-work means any system by which earnings are calculated upon the quantity or output of work performed;

  • Data Universal Number System (DUNS) Number means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

  • Unit Price Work means the Work, or a portion of the Work, paid for based on incremental units of measurement.

  • Non-Extension Drawing has the meaning specified in Section 3.5(d).

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Change Order means a written order to the Contractor signed by the Contracting Officer, issued after execu- tion of the Contract, authorizing a change in the term or scope of the Contract.