General Conditions Work Cost Limit definition

General Conditions Work Cost Limit means the maximum amount Owner will pay for the General Conditions Work, as set forth in the Section 2.3 below. [Discussion point - set up as General Conditions Work Lump Sum or General Conditions Work GMP]
General Conditions Work Cost Limit means the maximum amount Owner will pay for the General Conditions Work, as set forth in the applicable GMP Amendment.
General Conditions Work Cost Limit means the maximum amount Owner will pay for the General Conditions Work, as set forth in the Section 2.3 below.[Discussion point - set up as General Conditions Work Lump Sum or General Conditions Work GMP]

Examples of General Conditions Work Cost Limit in a sentence

  • Costs of all General Conditions Work, subject to the General Conditions Work Cost Limit; provided, however, the cost of General Conditions Work pertaining to any Subcontract shall not be Cost of the Work if such costs are paid pursuant to that Subcontract.

  • Costs arising from or related to the General Conditions Work in excess of the General Conditions Work Cost Limit.

  • The General Conditions Work Cost Limit for the Deliverable Portion of Work is Dollars ($ ).

  • Construction Manager shall bear, without Owner’s reimbursement, all costs in excess of (a) the Project GMP; (b) Cost of the Work for a Deliverable Portion of Work in excess of the GMP for that Work; and (c) General Conditions Work costs for a Deliverable Portion of Work in excess of the General Conditions Work Cost Limit for that Work.

  • Design-Builder shall be responsible for, and shall pay without Owner’s reimbursement, all costs and expenses, including Costs of the Work, arising from the General Conditions Work that are in excess of the General Conditions Work Cost Limit.

  • General Conditions Work costs not payable as Cost of the Costs in Excess of General Conditions Work Cost Limit.

  • General Conditions Work costs not payable as Cost of the Work including: from or related to the General Conditions Work in excess of the General Conditions Work Cost Limit.

  • Construction Manager shall be responsible for, and shall pay without Owner’s reimbursement, all costs and expenses, including Costs of the Work, arising from the General Conditions Work that are in excess of the General Conditions Work Cost Limit.

  • Costs of all General Conditions Work, subject to the General Conditions Work Cost Limit; provided, however, the cost of General Conditions Work pertaining to any Subcontract shall not be Cost of the Work if such costs are paid pursuant to that Subcontract.General Conditions Work costs include:Administrative Expenses.

Related to General Conditions Work Cost Limit

  • General Conditions means the “International Development Association General Conditions for Credits and Grants”, dated July 1, 2005 (as amended through October 15, 2006).

  • General Condition means these General Terms and Conditions of Contract.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Construction and Demolition Debris means and includes:

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Base Building Work means the base building work for the Building as described in this Manual.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • GENERAL AND SPECIAL CONDITIONS OF CONTRACT means the instructions to Tenderer and General and special conditions of contract pertaining to the work for which above tenders have been called for.

  • Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and

  • Scheduled Construction Period means the period commencing from the Appointed Date and ending on Scheduled Completion Date;

  • Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Landlord’s Work means the work of constructing the Tenant Improvements.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Eligible Project Costs means such portion of the Project costs disbursed and loaned from the OPWC to the Recipient for the sole and express purpose of acquiring, constructing, reconstructing, expanding, improving, engineering and equipping the Project, other direct expenses, and related financing costs thereto.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Work crew means a program of partial confinement

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Building Work has the meaning given to it in section 6 of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth);

  • Baseline Schedule means the initial time schedule prepared by Contractor for Owner’s information and acceptance that conveys Contractor’s and Subcontractors’ activities (including coordination and review activities required in the Contract Documents to be performed by A/E and ODR), durations, and sequence of work related to the entire Project to the extent required by the Contract Documents. The schedule clearly demonstrates the critical path of activities, durations and necessary predecessor conditions that drive the end date of the schedule. The Baseline Schedule shall not exceed the time limit current under the Contract Documents.

  • The Contract Price/ Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Minimum Improvements means the acquisition of land and construction of a 152-unit market rate residential apartment building, construction of a stormwater pond and related improvements. The Minimum Improvements are more fully depicted in Exhibit B, which is attached hereto and incorporated herein.