Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.
Interruption Period shall have the meaning set forth in Section 5 hereof.
Unplanned Service Interruption means any Service Interruption where events or circumstances prevent the timely communication of prior warning or notice to the Trader or any affected Customer;
Outage has the meaning set forth in the CAISO Tariff.
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Restoration Threshold means an amount equal to 5% of the outstanding principal amount of the Loan.
Alteration Threshold means an amount equal to 5% of the outstanding principal amount of the Loan.
Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.
Basic generation service or "BGS" means electric generation
Continuous emissions rate monitoring system or “CERMS” means the total equipment required for the determination and recording of the pollutant mass emissions rate (in terms of mass per unit of time).
Continuous emissions monitoring system (CEMS) means all of the equipment that may be required to meet the data acquisition and availability requirements of this section, to sample, condition (if applicable), analyze, and provide a record of emissions on a continuous basis.
Continuous emission monitoring system or "CEMS" means the equipment required under section 11 of this rule to sample, analyze, measure, and provide, by means of readings recorded at least once every fifteen (15) minutes, using an automated data acquisition and handling system (DAHS), a permanent record of nitrogen oxides emissions, stack gas volumetric flow rate, stack gas moisture content, and oxygen or carbon dioxide concentration, as applicable, in a manner consistent with 40 CFR 75*. The following systems are the principal types of continuous emission monitoring systems required under section 11 of this rule:
Continuous monitoring system means the total equipment, required under the emission monitoring section in applicable subsections used to sample and condition (if applicable), to analyze, and to provide a permanent record of emissions or process parameters.
Normal Minimum Generation means the lowest output level of a generating resource under normal operating conditions.
Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.
Planned Service Interruption means a Service Interruption that has been scheduled to occur in accordance with Schedule 5;
Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.
Continuous emissions monitoring system or “CEMS” means all of the equipment that may be required to meet the data acquisition and availability requirements of this chapter, to sample, to condition (if applicable), to analyze, and to provide a record of emissions on a continuous basis.
Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement.
Excused Downtime means the number of minutes in the Charging Period that the LSP is unavailable due to:
Minimum Generation Emergency means an Emergency declared by the Office of the Interconnection in which the Office of the Interconnection anticipates requesting one or more generating resources to operate at or below Normal Minimum Generation, in order to manage, alleviate, or end the Emergency.
Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.
Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,
Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.
Maximum Generation Emergency means an Emergency declared by the Office of the Interconnection to address either a generation or transmission emergency in which the Office of the Interconnection anticipates requesting one or more Generation Capacity Resources, or Non- Retail Behind The Meter Generation resources to operate at its maximum net or gross electrical power output, subject to the equipment stress limits for such Generation Capacity Resource or Non-Retail Behind The Meter resource in order to manage, alleviate, or end the Emergency.
Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.