Investigative Work Plan definition

Investigative Work Plan means a written list of tasks required to complete an investigation.
Investigative Work Plan means the plan of investigative and remedial action required by applicable Law, Environmental Approvals or the Hazardous Materials Management Plan to be prepared if Hazardous Materials are encountered or spilled, dumped, discharged or released at any time on, under, within or about the Project Right of Way.
Investigative Work Plan. (IWP) means a plan prepared by DB Contractor addressing the methods, techniques, and analytical testing requirements to adequately characterize the extent of impacts by Hazardous Materials to an area of concern as described in Section 3.4.1 of Exhibit 2 to the Capital Maintenance Agreement.

Examples of Investigative Work Plan in a sentence

  • Such assumption of generator and arranger status does not relieve Developer from its scope of responsibilities under Section 12.2.1. Whenever TxDOT has such arranger liability, Developer’s Investigative Work Plan, Site Investigative Report and remediation plans shall be subject to the prior approval of TxDOT.

  • Entitlement to compensation or a time extension shall be limited to work performed pursuant to DB Contractor’s Hazardous Materials Management Plan, Investigative Work Plan and Site Investigative Report for such Unknown Hazardous Materials as approved by TxDOT, in writing.

  • The annual ordinary General Assembly is informed of the Committee’s annual report which includes the management, activities, situation of the Association and the financial report.

  • The applicant shall prepare and submit to [the Department] OER a Phase II Investigative Work Plan to [the] implement an ASTM compliant or otherwise OER-approvable Phase II ESA, prepared in accordance with the CEQR Technical Manual.

  • The Investigative Work Plan and addenda were subsequently approved by the NYSDEC and became an appendix to an investigation VCA for implementation of the investigation described herein, entered into between the NYSDEC and CooperVision.

  • Based on the findings of the Phase I ESA, a Phase II Subsurface Investigative Work Plan (Phase II Work Plan) and Site Specific Health and Safety Plan (HASP) have beenwere prepared and submitted to NYCDEP for review and approval for the proposed parkland and Retail Site “A.” The Phase II Work Plan includes soil, groundwater, and soil vapor testing at locations distributed across the two sites.

  • For example, there are works focusing on Poisson processes [76], [179], [246], and some recent work on one-dimensional [124], [153] and multi-dimensional (network) point processes [116], [226].

  • Based on the findings of the Phase I ESA (dated October 2012), a Phase II Subsurface Investigative Work Plan (Phase II Work Plan) and Site Specific Health and Safety Plan (HASP) werehave been prepared and submitted to NYCDEP for review and approval for the proposed parkland and Retail Site “A”.

  • In 2017 the Village as part of its Investigative Work Plan (Funding Agreement 03) performed water testing and closed-circuit television inspection on 82 properties (41 properties in the Wrayburn Road Area and 41 properties in the Terrace Drive Area).

  • Letter dated May 29, 2019 from Kip Turner to Rick Fleck, Camarillo Aircraft Service re: Camarillo Aircraft Services Lease Expiration Letter dated June 11, 2019 from Erin Powers to Ninyo and Moore re: Notice to Proceed, AEA No. 19-09, Consulting Services Contract to Prepare a State Water Board Required PFAS Investigative Work Plan at Oxnard Airport Letter dated June 13, 2019 from Jorge Rubio to Charles McLaughlin, Carolyn Richardson, Aspen Helicopters, Inc.

Related to Investigative Work Plan

  • Investigative information means information, records, and documents received or generated by a physical therapy licensing board pursuant to an investigation.

  • Current significant investigative information means investigative information that a licensing board, after an inquiry or investigation that includes notification and an opportunity for the audiologist or speech-language pathologist to respond, if required by state law, has reason to believe is not groundless and, if proved true, would indicate more than a minor infraction.

  • Background investigation means the investigation conducted by a licensee or applicant to support the determination of trustworthiness and reliability.

  • clinical investigation means any systematic investigation in one or more human subjects, undertaken to assess the safety or performance of a device;

  • Collective Work means a work, such as a periodical issue, anthology or encyclopedia, in which the Work in its entirety in unmodified form, along with a number of other contributions, constituting separate and independent works in themselves, are assembled into a collective whole. A work that constitutes a Collective Work will not be considered a Derivative Work (as defined below) for the purposes of this License.

  • Complaint Investigation means an investigation of any complaint that has been made to a proper authority that is not covered by an abuse investigation.

  • Collaboration Know-How means all Know-How conceived, discovered, developed or otherwise made by or on behalf of a particular Party or any of its Affiliates or permitted subcontractors of any of the foregoing (solely or jointly by or on behalf of a particular Party or any of its Affiliates or permitted subcontractors of any of the foregoing) in the course of [***].

  • Defective Work means (a) Work that is unsatisfactory, deficient or damaged, does not conform to the Contract Documents, or does not meet the requirements of any inspection, test or approval, or (b) Work associated with punch list items that the Contractor fails to complete within a reasonable time after issuance of the punch list by the Project Manager.

  • Experimental or Investigative means treatments, devices or prescription medications which are recommended by a Physician, but are not considered by the medical community as a whole to be safe and effective for the condition for which the treatments, devices or prescription medications are being used. This includes any treatments, procedures, facilities, equipment, drugs, drug usage, devices, or supplies not recognized as accepted medical practice, and any of those items requiring federal or other governmental agency approval not received at the time services are rendered.

  • Remedial investigation means a process to determine the nature and extent of a discharge of a contaminant at a site or a discharge of a contaminant that has migrated or is migrating from the site and the problems presented by a discharge, and may include data collected, site characterization, sampling, monitoring, and the gathering of any other sufficient and relevant information necessary to determine the necessity for remedial action and to support the evaluation of remedial actions if necessary;

  • Study Materials means all the materials and information created for the Study, or required to be submitted to the Sponsor including all data, results, Biological Samples, Case Report Forms (or their equivalent) in whatever form held, conclusions, discoveries, inventions, know-how and the like, whether patentable or not, relating to the Study, which are discovered or developed as a result of the Study, but excluding the Institution’s ordinary patient records.

  • Demolition works means any physical activity to tear down or break up a structure (or part thereof) or surface, or the like, and includes the loading of demolition waste and the unloading of plant or machinery.

  • Development Work means any work carried out in relation to the physical construction of a mine;

  • Urgent Works means any urgent measures, which in the opinion of the Engineer-in-charge become necessary during the progress of the work to obviate any risk of accident or failure or which become necessary for security.

  • Assistive technology service means any service that directly assists a child with a disability in the selection, acquisition, or use of an assistive technology device. The term includes:

  • Work/ works means work / works to be executed in accordance with the contract.

  • Work Plan means a plan that describes each individual activity to be conducted to complete eligible activities and the associated costs of each individual activity.

  • Research Project means a discrete scientific endeavor to answer a research question or a set of research questions related to medical marijuana and is required for a medical marijuana research license.

  • Work Products are defined as all materials, tangible or not, created in whatever medium pursuant to this Agreement, including without limitation publications, promotional or educational materials, reports, manuals, specifications, drawings and sketches, computer programs, software and databases, schematics, marks, logos, graphic designs, notes, matters and combinations thereof, and all forms of intellectual property.

  • Study means the investigation to be conducted in accordance with the Protocol.

  • Controlled technical information means technical information with military or space application that is subject to controls on the access, use, reproduction, modification, performance, display, release, disclosure, or dissemination. Controlled technical information would meet the criteria, if disseminated, for distribution statements B through F using the criteria set forth in DoD Instruction 5230.24, Distribution Statements on Technical Documents. The term does not include information that is lawfully publicly available without restrictions.

  • Investigational Product means the Study Drug identified above and the control material, as further detailed in the Protocol;

  • Contractor Materials means Materials owned or developed prior to the provision of the Work, or developed by Contractor independently from the provision of the Work and without use of the JBE Materials or Confidential Information.

  • Studies means activities needed to prepare project implementation, such as preparatory, mapping, feasibility, evaluation, testing and validation studies, including in the form of software, and any other technical support measure, including prior action to define and develop a project and decide on its financing, such as reconnaissance of the sites concerned and preparation of the financial package;

  • Work Product means any and all works, including work papers, notes, materials, approaches, designs, specifications, systems, innovations, improvements, inventions, software, programs, source code, documentation, training materials, audio or audiovisual recordings, methodologies, concepts, studies, reports, whether finished or unfinished, and whether or not included in the Deliverables, that are developed, produced, generated, or provided by Contractor in connection with Contractor’s performance of its duties under the Contract or through use of any funding provided under this Contract.

  • Massive Multiauthor Collaboration Site (or “MMC Site”) means any World Wide Web server that publishes copyrightable works and also provides prominent facilities for anybody to edit those works. A public wiki that anybody can edit is an example of such a server. A “Massive Multiauthor Collaboration” (or “MMC”) contained in the site means any set of copyrightable works thus published on the MMC site.