Project Right of Way definition

Project Right of Way or “Project ROW” means any real property (which term is inclusive of all estates and interests in real property), which is (a) necessary for ownership and operation of the Project and (b) within the lines established by the NEPA Approval to delineate the outside limits of the Project, as such limits may be adjusted from time to time in accordance with the CDA Documents (including adjustments for Additional Properties). The term specifically includes all air space, surface rights and subsurface rights within the limits of the Project Right of Way.
Project Right of Way means any real property within the Xxxx Ex Corridor (which term is inclusive of all estates and interests in real property, including easements), which is:
Project Right of Way means the “Project Right of Way” as defined in Exhibit A (Definitions) to the CA. Proprietary Intellectual Property means any Intellectual Property that is patented or copyrighted by the Operating Company, Concessionaire, the Department or any other Person, as applicable, or any of its respective contractors or subcontractors, or, if not patented or copyrighted, is created, held and managed as a trade secret or confidential information by the Operating Company, Concessionaire, the Department or any other Person, as applicable, or any of its respective contractors or subcontractors, but excludes any item of Intellectual Property that is produced for multiple purposes and is not unique to the technology that is being applied to or for the Project. Safety Compliance Order means a “Safety Compliance Order” as defined in Exhibit A (Definitions) to the CA. Service Commencement Date means the “Service Commencement Date” as defined in Exhibit A (Definitions) to the CA. Shared Facilities Agreement means that certain Shared Facilities Agreement dated as of July 31, 2012 by and between the Concessionaire and Capital Beltway Express, LLC. Shared Services has the meaning given to such term in the Shared Facilities Agreement.

Examples of Project Right of Way in a sentence

  • Do not close any highways or streets unless specifically allowed by the Contract.Any illegal drugs, drug paraphernalia, mobile drug labs or dumps, weapons or firearms found on the Project Right of Way shall be considered a potential crime scene and shall not be handled or moved.

  • In such circumstances, the provisions of Section 5.5.8 shall apply, including the application of Section 8.2 to those circumstances where IFA is pursuing a Business Opportunity involving a Utility in the Project Right of Way.

  • DB Contractor shall obtain all other Governmental Approvals, including any modifications, renewals and extensions of the TxDOT-Provided Approvals, and, except to the extent the Contract Documents expressly provide TxDOT is responsible therefor, all third party approvals and agreements required in connection with the Project, the Project Right of Way or the Work.

  • Developer shall obtain all other Governmental Approvals, including any modifications, renewals and extensions of the TxDOT-Provided Approvals, and, except to the extent the Contract Documents expressly provide TxDOT is responsible therefor, all third party approvals and agreements required in connection with the Project, the Project Right of Way or the Work.

  • Developer shall review with IFA all third-party requests for new signs in the Project Right of Way.

  • In such circumstances, the provisions of Section 7.5.8 shall apply, including the application of Section 11.2 to those circumstances where TxDOT is pursuing a Business Opportunity involving a Utility in the Project Right of Way.

  • It also authorizes Developer to enter the Project Right of Way TxDOT owns in order to conduct surveys and site investigations, including geotechnical, Hazardous Materials and Utilities investigations.

  • The Developer will be responsible, at its own cost and expense, for the maintenance, repair and replacement of the existing drainage system located within and outside of the Project Right of Way in accordance with the Technical Requirements, except to the extent such responsibility is allocated to the Department in accordance with the Technical Requirements.

  • DB Contractor shall obtain all other Governmental Approvals, including any modifications, renewals and extensions of the TxDOT-Provided Approvals, and, except to the extent the DBA Documents expressly provide TxDOT is responsible therefor, all third party approvals and agreements required in connection with the Project, the Project Right of Way or the Work.

  • Thorns are far from pleasant, and we desire their prompt removal.


More Definitions of Project Right of Way

Project Right of Way means (a) all real property within the access control line for the Project, including the HOT Lanes Right of Way, and (b) all other right of way, including temporary and permanent easements, that is necessary for the performance of the Work, in each case indicated as the cross-hatched portion shown on the map attached to this Agreement as Exhibit N-1.
Project Right of Way means all real property (which term is inclusive of all estates and interests in real property) necessary for ownership and operation of the Project, specifically including all property within the access control line for the Project.
Project Right of Way means the physical area necessary for the completion of the Phase 2 Work and for the provision of the Services.
Project Right of Way means the real property identified in Exhibit B-2 (Design Plans).
Project Right of Way or “Project ROW” means any real property (which term is inclusive of all estates, easements, leases and other interests in real property, whether temporary or permanent), improvements and fixtures within the lines established by the Project Right of Way Maps to delineate the outside limits of the Project (both horizontal and, where specified, vertical), as such limits may be adjusted from time to time in accordance with the Contract Documents. The term specifically includes all air space, surface rights and subsurface rights within the horizontal limits of the Project Right of Way to the extent they are subject to an interest held by FDOT.

Related to Project Right of Way

  • Right-of-way means and refers to the total land required and acquired for the project, both in its width and length, together with all way leaves, easements, unrestricted access and other rights of way, howsoever described, necessary for construction and maintenance of the Project Highway in accordance with this Agreement;

  • Lands means the purchase of real property or interest in real property.

  • Underground facility means any item which shall be buried or placed below ground for use in connection with the storage or conveyance of water, sewage, electronic, telephone or telegraphic communications, electric energy, oil, gas or other substances, and shall include, but not be limited to pipes, sewers, conduits, cables, valves, lines, wires, manholes, attachments and those portions of poles and their attachments below ground.

  • The Site, where applicable, means the designated project place(s) named in the bidding document.

  • Adjacent Property means all land adjoining and surrounding the Stadium Site on which will be located any public streets, sidewalks, plazas, or bridges and any public or private parking facilities or other accoutrements to be developed by Authority or other parties in connection with the Project.

  • Owned Property has the meaning set forth in Section 4.10(a).

  • Project site, where applicable, means the place indicated in bidding documents.

  • Underground tank means a device meeting the definition of tank whose entire surface area is totally below the surface of and covered by the ground.