Examples of Lot B in a sentence
The County intends to make awards per lot as follows: LOT A – Facilities Management – One (1) Award LOT B – Orange County Convention Center – One (1) Award LOT C – Utilities, Fire Rescue and Other County Sites – One (1) Award Award shall be based on the Proposer’s ranking during evaluation of the proposals, where the highest ranking proposer will be awarded Lot A, second ranking will be awarded Lot B and third ranking will be awarded Lot C.
Contractors will only be awarded one lot, as follows: LOT A – Facilities Management – One (1) Award LOT B – Orange County Convention Center – One (1) Award LOT C – Utilities, Fire Rescue and Other County Sites – One (1) Award Award shall be based on the Proposer’s ranking during evaluation of the proposals, where the highest ranking proposer will be award d Lot A, second ranking will be awarded Lot B and third ranking will be awarded Lot C.
These two Proposals are substantially responsive and get the highest total score for Lot A and Lot B respectively.
In such a case, a decision has to be made on whether this Proposer should be awarded Lot A or Lot B by considering the combined scores of Proposers for Lot A and Lot B.]Cross discounts for award of multiple lots will not be considered.
Contractors will only be awarded one lot, as follows: LOT A – Facilities Management – One (1) Award LOT B – Orange County Convention Center – One (1) Award LOT C – Utilities, Fire Rescue and Other County Sites – One (1) Award Award shall be based on the Proposer’s ranking during evaluation of the proposals, where the highest ranking proposer will be awarded Lot A, second ranking will be awarded Lot B and third ranking will be awarded Lot C.
Tract C of Lot B of NE1/4 NW1/4 less Pengra Subdivision, Section 17, T2N, R7E, BHM, Pennington County, South Dakota.
Lot C – Utilities, Fire Rescue, and Other County Sites Award shall be based on the lowest responsive and responsible bidder, where the lowest responsive and responsible bidder will be awarded Lot A, second-lowest responsive and responsible bidder will be awarded Lot B and third-lowest will be awarded Lot C.
A daily production range of 85 to 125 curb miles per day for Lot A areas and 85 to 125 curb miles per day for Lot B areas shall be used and followed while performing operations under this contract.
Waiver to provide 2 loading spaces on Lot B (1 designated loading zone at the southwest corner of Lot B and 1 “18x36 Live Loading Area” on the easterly side of Building 2 on Lot B) where 4 are required based on the requirement for 1 loading space per 20 rental units.
The front yard setback is waived so as to allow for a 6.2’ front setback on Lot A, and a 17.0’ setback on Lot B as shown on the Approved Plans.