Examples of Meter Work in a sentence
In addition to Level 1 and 2 Meter Work, Level 3 Meter Workers can install, remove and replace all meters consistent with the above including transformer-rated meters.
In addition to Level 1 Meter Work, Level 2 Meter Workers can install, remove and replace single-phase, network, and poly-phase meters, 600 volt phase to phase maximum.
In addition to performing Class 1 and 2 Meter Work, Class 3 a Meter Worker can install, remove and replace all meters consistent with the above including transformer-rated meters.
When Meter Work Type is set to K08, M11 or M15 this field should also be used toprovide details of the problem.2FLDTariff Configuration Code1See descriptionA code to indicate the tariff (or rate category) functionality that the Supplier requires to be delivered by Keypad metering installed at a Meter Point.
When Meter Work Type is set to M11 or M15 this field should also be used to provide details of the problem.
A summary of Obligations: • Within 6 Supply Point System Business Days of (mostly read this as Business Days),Shippers should update the Meter Information in UK Link using: • JOB transaction where this relates to Meter Work under Schedule 2B of the Gas Act.
They could control the meter replacement program, arrange Meter Work or arrange purchase of new meters; there is no fixed summary of the MAM service, as this will be determined by commercial contract.
Meter Work Project (Meter Purchases) – This project represents the annual purchase and receipt of customer service meters and Automated Meter Reading (“AMR”) devices.
The solar O is over abundant and could explain the difference in ratios.
ApprovedDTC CP 3570 –Amend DTC Annex C Rules to expand D0312 Rule 11 to exclude the sending of D0312 to a Supplier whoThis CP sought to amend DTC Annex C Rules to expand D0312 Rule 11 to provide an exclusion clause so that when the Supplier at the time of the Meter Work no longer holds a Supplier licence and has been ended in MDD, MPAS will not send the D0312 to that Supplier.