Examples of Meter Work in a sentence
The respondent concedes that the Meter Work Notification incorrectly identifies the petitioner’s apartment as unit .
In addition to Level 1 Meter Work, Level 2 Meter Workers can install, remove and replace single-phase, network, and poly-phase meters, 600 volt phase to phase maximum.
Additionally must have the knowledge needed for up to 600 volts, poly-phase, (two-phase and three phase) services and the forms and voltages applicable to Level 2 Meter Work.
In addition to Level 1 and 2 Meter Work, Level 3 Meter Workers can install, remove and replace all meters consistent with the above including transformer-rated meters.
In addition to Level 1 Meter Work, Level 2 Meter Workers can install, remove, replace inspect, program, and test singlephase, network, polyphase, and transformer rated meters, including those with internal diagnostics, and/or meter driven load control devices on services with up to 600 volts phase to phase and can operate test-bypass facilities or determine if installations without bypass facilities are safe to disconnect.
When Meter Work Type is set to K08, M11 or M15 this field should also be used toprovide details of the problem.2FLDTariff Configuration Code1See descriptionA code to indicate the tariff (or rate category) functionality that the Supplier requires to be delivered by Keypad metering installed at a Meter Point.
A summary of Obligations: • Within 6 Supply Point System Business Days of (mostly read this as Business Days),Shippers should update the Meter Information in UK Link using: • JOB transaction where this relates to Meter Work under Schedule 2B of the Gas Act.
Communication wiring may be routed inside the panel, and work can be in and around energized circuits.2.Work to be PerformedIn addition to Level 1 Meter Work, Level 2 Meter Workers can install, remove and replace single-phase, network, and poly-phase meters, 600-volt phase to phase maximum.
Perform all inspections as described in the Field Meter Work Site Inspection, Safety and Environmental Section of this document.
The technician performed three tests on the meter pursuant to Meter Work Notification no.