Methodology Element definition

Methodology Element means the Methodology Element specified in this Methodology Element Submission;
Methodology Element means a methodology, methodology revision, module or tool (including additionality tools, performance benchmarks and technology benchmarks).

Examples of Methodology Element in a sentence

  • The Developer is the sole owner of all rights in and to the Methodology Element Documentation and the right to grant the license granted hereunder.

  • The Developer shall have the sole right, but not the obligation, to apply for copyright registrations of the Methodology Element Documentation.

  • The Developer further represents that it has received all consents and releases necessary for Verra to take advantage of its rights under this Agreement and that the Methodology Element Documentation does not infringe the intellectual property rights of any other party.

  • Validation/verification bodies shall adhere to the instructional text in the Methodology Element Assessment Report Template and refer to the guidance in the Validation and Verification Manual when completing the methodology assessment report.

  • All information that is furnished by the Developer in the Methodology Element Documentation and any other documentation relating to this Methodology Element is true, accurate and complete in all material respects.

  • The absence of paid sick days forces ill workers to decide between caring for their deteriorating health or losing jobs and income, risking impoverishment to themselves and their families.

  • This Methodology Element Approval Request and, all non contractual or other obligations arising out of or in connection with it, are governed by English law.

  • The corporate finance team reports directly to the board of directors of the Company.

  • All information that is furnished by the Developer in this Methodology Element Submission, the Methodology Element Documentation and any other documentation relating to this Methodology Element Submission is true, accurate and complete in all material respects.

  • The developer shall provide to the VCSA the most recent version of the methodology documentation, the final versions of the two assessment reports and a signed Methodology Element Approval Request Form.

Related to Methodology Element

  • Methodology means the process used by the Steward to determine its calculation of its Supplied quantity of Designated Printed Paper and Packaging, including, but not limited to, data sources, percentage allocation of data reported, data collection systems, and the use of calculators, worksheets, commercial software, or mathematical formulae.

  • Standard operating procedure means a formal written procedure offi- cially adopted by the plant owner or operator and available on a routine basis to those persons responsible for carrying out the procedure.

  • Service Level Standards has the meaning ascribed thereto in Section 2.1 hereof.

  • Design Criteria Professional means a firm who holds a current certificate of registration under Chapter 481 of the Florida Statutes, to practice architecture or landscape architecture, or a firm who holds a current certificate as a registered engineer under Chapter 471 of the Florida Statutes, to practice engineering, and who is employed by or under contract to the District to provide professional architect services, landscape architect services, or engineering services in connection with the preparation of the Design Criteria Package.

  • Service Specification means and include detailed description, statements to technical data, performance characteristics, and standards (Indian as well as) as applicable and as specified in the Contract as well as those specifications relating to Industry standards and codes applicable to the performance of the work, work performance quality and the specifications affecting the works or any additional specification required to be produced by the DCO to meet the design criteria.

  • Standard Operating Procedures or “SOP” means the procedures as specified in the Annexes or Attachments to the relevant Schedules;

  • external engineering service means an engineering service situated outside the boundaries of a land area and that is necessary to serve the use and development of the land area;

  • Parameter means a physical, biological, or chemical property of state water when a value of that

  • Service Levels means the service levels to be met by the Services as referenced in the Contract Letter and set out in the Specification Schedule.

  • Configuration means State-specific changes made to the Software without Source Code or structural data model changes occurring.

  • Benchmarking Report means the report produced by the Supplier following the Benchmark Review and as further described in this Framework Schedule 7;

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Electronic Subcontracting Reporting System (eSRS) means the Governmentwide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.

  • Baseline Schedule means the initial time schedule prepared by Contractor for Owner’s information and acceptance that conveys Contractor’s and Subcontractors’ activities (including coordination and review activities required in the Contract Documents to be performed by A/E and ODR), durations, and sequence of work related to the entire Project to the extent required by the Contract Documents. The schedule clearly demonstrates the critical path of activities, durations and necessary predecessor conditions that drive the end date of the schedule. The Baseline Schedule shall not exceed the time limit current under the Contract Documents.

  • Benchmarks mean the performance milestones that are set forth in Appendix D.

  • Service Specifications means the following documents, as applicable to the Services under Your order:

  • Peer support specialist means an individual who has experienced a severe and persistent mental illness and who has successfully completed standardized training to provide peer support services through the medical assistance program or the Iowa Behavioral Health Care Plan.

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Implementation Services has the meaning set forth in Section 2.1.

  • Design Criteria means the design criteria set out in the Ministry’s publication “Design Criteria for Sanitary Sewers, Storm Sewers and Forcemains for Alterations Authorized under Environmental Compliance Approval”, (as amended from time to time).

  • Model shall refer to a particular brand of Vehicle sold by an OEM (e.g., Taurus, Tahoe, Grand Caravan).

  • technical specification means, with respect to any Software, the document setting forth the technical specifications for such Software and included in the Statement of Work.

  • Corrective Measure The contractor shall repair any deficiencies to meet the performance guideline within warranty period.

  • layout plan means a plan of the project depicting the division or proposed division of land into plots, roads, open spaces, amenities, etc. and other details as may be necessary;

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Maintenance Schedule means a document which describes the specific scheduled maintenance tasks and their frequency of completion necessary for the safe operation of those aircraft to which it applies;