Examples of Minimum Requirements Document in a sentence
A National Grid representative may conduct a post-installation verification of the newly installed equipment to ensure that the installation is consistent with the Application as pre-approved, represents sound engineering practices, and complies with the attached Minimum Requirements Document (if applicable).
A Minimum Requirements Document will be completed and submitted to the Washington Office to determine the minimum tool (either mechanized or non-mechanized) needed to complete this project.
Furthermore, in the event that Toray is underperforming, National Grid would have the ability under the terms of the Minimum Requirements Document (“MRD”) to adjust any remaining incentive amounts.4 Nonetheless, the Company is not opposed to including language in the final agreement between Toray and National Grid that specifies a four-year repayment window to reflect the payment period for the AGT incentive.
Opportunities for communication/reinforcing Life Saving Rules requirements with the workforce include, but are not limited to during: □ Permitting Process□ Orientations□ job planning or tailgate□ PSI Conversations□ LSR Verification□ Leadership visits / Reliability conversationsAdditional details are provided in the ConocoPhillips Life Saving Rules Minimum Requirements Document and in the flip guides handed out to site personnel.
BGE and the Customer will develop a Minimum Requirements Document (MRD) specifying project-specific incentive offer conditions such as milestones, measurement & verification, interconnection and permitting plans and operational requirementsalong with any additional required documentation.
BGE and the Customer will develop a Minimum Requirements Document (MRD) specifying project-specific incentive offer conditions such as milestones, measurement & verification,interconnection and permitting plans and operational requirements along with any additional required documentation.
Therefore, the Contractor shall ensure that requirements are allocated in the functional requirements and system design documents to address C2 level of trust, and that those requirements are based on the INS C&TS Guidance Document 9.0, Minimum Requirements Document or the most currently approved INS directive.
A map showing and detailing the Eastern Region is provided in the Minimum Requirements Document referenced above and is also available on the 2020 ETI CCGT RFP Website.** The Eastern Region shown in the map (and also shown in the same map in Appendix D) is based on 138 kV and higher transmission facilities and excludes certain areas that contain lower voltage facilities that are not relevant for this RFP.