Minimum Requirements Document definition

Minimum Requirements Document means the document setting forth the minimum requirements that may be required by the Sponsor, which, if so required, will be submitted with Customer’s application and approved by Sponsor.
Minimum Requirements Document means the minimum requirements document that may be required by Columbia Gas of Massachusetts, which, if so required, will be submitted with Customer’s application and approved by Columbia Gas of Massachusetts.
Minimum Requirements Document means the minimum requirements document that may be required by the PA, which, if so required, will be submitted with Customer’s application and approved by PA.

Examples of Minimum Requirements Document in a sentence

  • BGE and the Customer will develop a Minimum Requirements Document (MRD) specifying project-specific incentive offer conditions such as milestones, measurement & verification, interconnection and permitting plans and operational requirements along with any additional required documentation.

  • It is very important that the Minimum Requirements Document is shared with the design and construction team by the customer early on in the project cycle so that the plant performance will meet the requirement of MRD and not jeopardize the incentive expected.

  • The Mass Save Minimum Requirements Document (MRD), which lays out the energy-using equipment and system details that will lead the project to achieve the target EUI.

  • Minimum Requirements DocumentSubsequent to BGE’s review and approval of the CHP project, BGE will work with the applicant to develop a Minimum Requirements Document for the proposed project.

  • BGE and the Customer will develop a Minimum Requirements Document (MRD) specifying project-specific incentive offer conditions such as milestones, measurement & verification,interconnection and permitting plans and operational requirements along with any additional required documentation.

  • Requirements are outlined in WSTP Consultant Services Management Plan Minimum Requirements (Document Number CD-CP-PL-01) attached as Appendix Z.

  • Due to the increase in incentive levels, the 2013 EE Plan requires additional safeguards to protect these investments of ratepayer dollars through the use of a Minimum Requirements Document (MRD).

  • Furthermore, in the event that Toray is underperforming, National Grid would have the ability under the terms of the Minimum Requirements Document (“MRD”) to adjust any remaining incentive amounts.4 Nonetheless, the Company is not opposed to including language in the final agreement between Toray and National Grid that specifies a four-year repayment window to reflect the payment period for the AGT incentive.

  • Motion to accept all the recommendations: Ed Rutkowski, BRITSeconded: Patty Braden, ROMS March 23, 2017 Approval of Database Clean-Up Best Practices and Minimum Requirements Document: Garrett Hungerford (REDF)Jonathan Deahl (WATE) motioned to approve the Database Clean-Up Best Practices and Minimum Requirements Document.

  • Accordingly, it would be difficult to conclude that the parties had expressly or impliedly agreed that satisfaction of the requirement to deliver them was essential for the purposes of s 7(4)(a).


More Definitions of Minimum Requirements Document

Minimum Requirements Document means [TBC] Multi-Disciplinary Reviews has the meaning gives to it in Annex 1(Scope) of Part B of Appendix 5 to this Schedule 3B. Named Suppliers are named suppliers defined in the Contract Data and other Suppliers who have signed the Joining Deed.
Minimum Requirements Document means the document setting forth the minimum requirements that may be required by National Grid, which, if so required, will be submitted with Customer’s application and approved by National Grid.
Minimum Requirements Document means the minimum requirements document that may be required by Rhode Island Energy, which, if so required, will be submitted with Customer’s application and approved by Rhode Island Energy.
Minimum Requirements Document means the minimum requirements document that may be required by the PA, which, if so required, will be submitted with Customer’s application and approved by PA.(g)“Program” means any of the energy efficiency programs offered to a C&I Customer by PA. (h)“ PA” or “Program Administrator” means The Berkshire Gas Company, or Cape Light Compact JPE, or Eversource Energy, or Liberty Utilities, or National Grid, or Unitil, as applicable.(i)“ Program Materials” means the documents and information provided or made available by

Related to Minimum Requirements Document

  • Program Requirements means that Partner has to fulfill certain program requirements as described in detail in the applicable SAP PartnerEdge Model and the PartnerEdge Program Guide.

  • Default Requirement means the amount specified as being applicable to the Reference Entity in the Standard, or its equivalent in the relevant Obligation Currency (or, if no such amount is specified, U.S.$ 10,000,000 or its equivalent in the relevant Obligation Currency) in either case, as of the occurrence of the relevant Credit Event.

  • Minimum Extended Summer Resource Requirement means, for Delivery Years through May 31, 2017, the minimum amount of capacity that PJM will seek to procure from Extended Summer Demand Resources and Annual Resources for the PJM Region and for each Locational Deliverability Area for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for such Delivery Year. For the PJM Region, the Minimum Extended Summer Resource Requirement shall be equal to the RTO Reliability Requirement minus [the Limited Demand Resource Reliability Target for the PJM Region in Unforced Capacity]. For an LDA, the Minimum Extended Summer Resource Requirement shall be equal to the LDA Reliability Requirement minus [the LDA CETL] minus [the Limited Demand Resource Reliability Target for such LDA in Unforced Capacity]. The LDA CETL may be adjusted pro rata for the amount of load served under the FRR Alternative. Minimum Generation Emergency:

  • Compliance schedule means a schedule of events, by date, which will result in compliance with these regulations.

  • Capital Requirements Directive means Directive 2013/36/EU of the European Parliament and of the Council of 26 June 2013 on access to the activity of credit institutions and the prudential supervision of credit institutions and investment firms, as amended or replaced from time to time.

  • Reporting Requirement By January 31, 2017, the District will provide for OCR’s review and approval the Web Accessibility Policy drafted consistent with Item 1.

  • Payment Requirement means the amount specified as being applicable to the Reference Entity in the Standard or its equivalent in the relevant Obligation Currency (or, if no such amount is specified, USD 1,000,000 or its equivalent in the relevant Obligation Currency) in either case as of the occurrence of the relevant Failure to Pay or Potential Failure to Pay, as applicable.

  • Performance Requirements The ordering entity reserves the right to inspect and verify that all deliveries are in accordance with specifications, both at the point of delivery and at the point of use. For orders that specify an “authorized party” to receive and inspect deliveries and/or installations, acceptance and inspection procedures must be performed by the” authorized party” to be considered and accepted by the ordering entity. Products inspected at the time of use are subject to refusal and return requirements for issues of quality such as defects in manufacturing and/or workmanship. Products will not be considered accepted by the ordering entity until the installation is complete for the applicable products.

  • Minimum Annual Resource Requirement means, for Delivery Years through May 31, 2017, the minimum amount of capacity that PJM will seek to procure from Annual Resources for the PJM Region and for each Locational Deliverability Area for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for such Delivery Year. For the PJM Region, the Minimum Annual Resource Requirement shall be equal to the RTO Reliability Requirement minus [the Sub-Annual Resource Reliability Target for the RTO in Unforced Capacity]. For an LDA, the Minimum Annual Resource Requirement shall be equal to the LDA Reliability Requirement minus [the LDA CETL] minus [the Sub-Annual Resource Reliability Target for such LDA in Unforced Capacity]. The LDA CETL may be adjusted pro rata for the amount of load served under the FRR Alternative.

  • MREL Requirement means the minimum requirement for own funds and eligible liabilities which is or, as the case may be, will be applicable to the Issuer;

  • Day-ahead Scheduling Reserves Requirement means the sum of Base Day-ahead Scheduling Reserves Requirement and Additional Day-ahead Scheduling Reserves Requirement.

  • Reporting Requirements As defined in Section 11.12.

  • Applicable Technical Requirements and Standards means those certain technical requirements and standards applicable to interconnections of generation and/or transmission facilities with the facilities of an Interconnected Transmission Owner or, as the case may be and to the extent applicable, of an Electric Distributor, as published by Transmission Provider in a PJM Manual provided, however, that, with respect to any generation facilities with maximum generating capacity of 2 MW or less (synchronous) or 5 MW or less (inverter-based) for which the Interconnection Customer executes a Construction Service Agreement or Interconnection Service Agreement on or after March 19, 2005, “Applicable Technical Requirements and Standards” shall refer to the “PJM Small Generator Interconnection Applicable Technical Requirements and Standards.” All Applicable Technical Requirements and Standards shall be publicly available through postings on Transmission Provider’s internet website.