Normal Capacity definition

Normal Capacity means 6,000 KW per hour per module or 72,000 KW per hour for the 12 module plant;
Normal Capacity means the Plant both manufacturing and shipping 2,475,000 square feet of Products during the same period of three (3) consecutive months in response to firm orders received by the Licensee in the normal course of business justifying the manufacturing of such quantity of Products;
Normal Capacity shall have the meaning set forth in Section 13.6(a).

Examples of Normal Capacity in a sentence

  • NAANOVO, through NAANOVO MEXICO WTE S.A., shall provide the electric power output capacity provided in Section 4 of this Schedule in respect of the combined amount of Normal Capacity, which shall be the actual achieved net Kilowatt (KW) capability of the WTE plants constructed by NAANOVO.

  • The units shall operate satisfactorily and without structural damage in daily load sharing from 100 per cent of the Normal Capacity to the minimum capacity of the units depending on the power contract requirements of NAANOVO MEXICO WTE S.A.


More Definitions of Normal Capacity

Normal Capacity means the Plant both manufacturing and shipping 2,475,000 square feet of Canco Products during the same period of three (3) consecutive months in response to firm orders received by the Corporation in the normal course of business justifying the manufacturing of such quantity of Canco Products;
Normal Capacity is defined as the share of the policy that would otherwise be ceded to the Reinsurer automatically under this Agreement in the absence of a Jumbo Break.
Normal Capacity means, where the Customer is:

Related to Normal Capacity

  • Nominal Capacity means the volume indicated by the manufacturer that represents the maximum recommended filling level.

  • Additional Capacity means, in relation to the Network, the capability of the Network to carry additional task by an enhancement or improvement of the infrastructure forming part of the Network or Associated Facilities;

  • RA Capacity means the maximum megawatt amount that the CAISO recognizes from a Project that qualifies for Buyer’s Resource Adequacy Requirements and is associated with the Project’s Capacity Attributes.

  • Technical Capacity means the maximum firm capacity that the transmission system operator can offer to the network users, taking account of system integrity and the operational requirements of the transmission network;

  • New Capacity means a new Generator, a substantial addition to the capacity of an existing Generator, or the reactivation of all or a portion of a Generator that has been out of service for five years or more that commences commercial service after the effective date of this definition. For purposes of Section 23.4.5 of this Attachment H, “Offer Floor” for a Mitigated Capacity Zone Installed Capacity Supplier that is not a Special Case Resource shall mean the lesser of (i) a numerical value equal to 75% of the Mitigation Net CONE translated into a seasonally adjusted monthly UCAP value (“Mitigation Net CONE Offer Floor”), or (ii) the numerical value that is the first year value of the Unit Net CONE determined as specified in Section 23.4.5.7, translated into a seasonally adjusted monthly UCAP value using an appropriate class outage rate, (“Unit Net CONE Offer Floor”). The Offer Floor for a Mitigated Capacity Zone Installed Capacity Supplier that is a Special Case Resource shall mean a numerical value determined as specified in Section 23.4.5.7.5. The Offer Floor for Additional CRIS MW shall mean a numerical value determined as specified in Section 23.4.5.7.6. For the purposes of Section 23.4.5 of this Attachment H, “Non-Qualifying Entry Sponsors” shall mean a Transmission Owner, Public Power Entity, or any other entity with a Transmission District in the NYCA, or an agency or instrumentality of New York State or a political subdivision thereof.

  • Local Capacity Area has the meaning set forth in the CAISO Tariff.

  • Idle capacity means the unused capacity of partially used facilities. It is the difference between: (a) that which a facility could achieve under 100 percent operating time on a one-shift basis less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays; and (b) the extent to which the facility was actually used to meet demands during the accounting period. A multi-shift basis should be used if it can be shown that this amount of usage would normally be expected for the type of facility involved.

  • Storage Capacity means any combination of space, injectability and deliverability.

  • System Capacity means the operational capacity of the System at any applicable point in time.

  • Excess Capacity means volume or capacity in a duct, conduit, or support structure other than a utility pole or anchor which can be used, pursuant to the orders and regulations of the Commission, for a pole attachment.

  • Contract Capacity has the meaning set forth in Section 3.1(f).

  • Official capacity means (i) when used with respect to a Director, the office of Director of the Company, and (ii) when used with respect to a person other than a Director, the elective or appointive office of the Company held by such person or the employment or agency relationship undertaken by such person on behalf of the Company, but in each case does not include service for any other foreign or domestic corporation or any partnership, joint venture, sole proprietorship, trust, employee benefit plan or other enterprise.

  • Bid Capacity meanss capacity offered by the bidder in his Bid under invitation.

  • Maximum Capacity or ‘Pmax’ means the maximum continuous active power which a power-generating module can produce, less any demand associated solely with facilitating the operation of that power-generating module and not fed into the network as specified in the connection agreement or as agreed between the relevant system operator and the power-generating facility owner;

  • Design capacity means the volume of a containment feature at a discharging facility that accommodates all permitted flows and meets all Aquifer Protection Permit conditions, including allowances for appropriate peaking and safety factors to ensure sustained, reliable operation.

  • Rated Capacity means the Average Daily Flow for which the Works are approved to handle;

  • Nameplate capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Licensed capacity means the number of children the Department has determined the day care home can care for at any one time in addition to any children living in the home who are under the age of 12 years. Children age 12 and over on the premises are not considered in determining licensed capacity.

  • Interruptible Capacity means capacity that may be interrupted by the Operator at any time in order to fulfil shippers’ nominations under a firm capacity reservation.

  • Contracted Capacity means the capacity (in MW AC) contracted with MSEDCL for supply by the successful bidder at the Delivery Point from the Solar Power Project.

  • Unforced Capacity shall have the meaning specified in the Reliability Assurance Agreement.

  • Available Capacity means the capacity from the Project, expressed in whole megawatts, that is available to generate Product. [For As-Available Product facilities only]

  • Reserved Capacity means the maximum amount of capacity and energy that the Transmission Provider agrees to transmit for the Transmission Customer over the Transmission Provider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery under Tariff, Part II. Reserved Capacity shall be expressed in terms of whole megawatts on a sixty (60) minute interval (commencing on the clock hour) basis.

  • Installed Capacity or 'IC’ means the summation of the name plate capacities of all the units of the generating station or the capacity of the generating station (reckoned at the generator terminals), approved by the Commission from time to time;

  • Committed Capacity means that portion of the Capacity that is required to meet the Capacity Entitlements of Access Holders;