PJM Grid definition

PJM Grid means the system of transmission lines, distribution lines, and associated facilities that have been placed under PJM’s operational control.
PJM Grid means the PJM electricity transmission grid.

Examples of PJM Grid in a sentence

  • Seller, as administrator for Buyer pursuant to the Administrative Services Agreement shall provide, or arrange for DPL or DDOT, as applicable, to provide, access to the applicable Site to permit Seller to deliver and install each Bloom System and the BOF to the applicable Site and to connect the Facility to DPL or the PJM Grid, as the case may be.

  • Then, on an annual basis if the customer is a net generator the customer will then be compensated by the utility the average annual PJM Grid LMP price per kilowatt-hour for the over generation.

  • Moreover, Judge Riggs’ opinion does not account for the following factors: • The difficulty of filling seats on commissions and boards throughout Nevada.

  • Mr. Stemetzki noted that Mr. Fitzpatrick was unable to attend today’s EGOC meeting and that he would walk thru PJM’s presentation entitled “Winter Operations of the PJM Grid: December 1, 2021 – February 28, 2022.” Mr. Babula noted that the PJM presentation was also sent to the EGOC and it is currently posted on the EGOC web page located on the ISO-NE web site.

  • The “Initial Performance Test” shall consist of a test of each of the Units in accordance with the terms of the Turbine Supply Agreement to confirm each such Unit is integrated with the PJM Grid and is delivering Energy to the PJM Grid consistent with PJM requirements.

  • Schedule 3.1(n) lists all Site Leases and easements or rights of way for transmission lines from the Site Leases to the Interconnection Point (or Delivery Point (as defined in the QFCP-RC Tariff)), as applicable, with the PJM Grid and identifies any material reciprocal easement or operating agreements relating thereto.

  • PJM Interconnection, L.L.C., Winter Operations of the PJM Grid: December 1, 2020 – February 28, 2021, at 26–30 (Apr.

  • Employees assigned to the night shift will receive a shift differential of ten percent (10%) over their current rate during the period of assignment.

  • RESYS B 420 RESYS Type B RESYS M40 RESYS P40 RESYS M20Earth leakage relaysRESYS P40▲Core balance transformersFunctionsEarth leakage protection relayRESYS Type P40 is associated witha remote trip breaking device (automatic power cut-off), and provides the following functions:- protection against indirect contacts,- limitation of leakage currents.

  • Atlantic Shores project documents fail to address cost issues with its connection to and upgrading of the PJM Grid.

Related to PJM Grid

  • CAISO Grid means the system of transmission lines and associated facilities of the Participating Transmission Owners that have been placed under the CAISO’s operational control.

  • PJM Tariff or “Tariff shall mean that certain “PJM Open Access Transmission Tariff”, including any schedules, appendices or exhibits attached thereto, on file with FERC and as amended from time to time thereafter.

  • PJM EIS GATS means the PJM Environmental Information Services, Inc. Generation Attribute Tracking System.

  • PJM Tariffs means the PJM OATT and the PJM Amended and Restated Operating Agreement, collectively.

  • Smart grid means capital improvements to an electric distribution utility's distribution infrastructure that improve reliability, efficiency, resiliency, or reduce energy demand or use, including, but not limited to, advanced metering and automation of system functions.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • PJM Management means the officers, executives, supervisors and employee managers of PJM.

  • CAISO Tariff means the California Independent System Operator Corporation Operating Agreement and Tariff, including the rules, protocols, procedures and standards attached thereto, as the same may be amended or modified from time to time and approved by the FERC.

  • PJM Interconnection, L.L.C. or "PJM" means the privately-

  • Customer Interconnection Facilities means all facilities and equipment owned and/or controlled, operated and maintained by Interconnection Customer on Interconnection Customer’s side of the Point of Interconnection identified in the appropriate appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions, or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System.

  • ISO-NE Tariff means ISO-NE’s Transmission, Markets and Services Tariff, FERC Electric Tariff No. 3, as amended from time to time.

  • CAISO means the California Independent System Operator Corporation or any successor entity performing similar functions.

  • Energy storage system means a system which stores energy and releases it in the same form as was input.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Capacity Storage Resource means any Energy Storage Resource that participates in the Reliability Pricing Model or is otherwise treated as capacity in PJM’s markets such as through a Fixed Resource Requirement Capacity Plan.

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Supplier of water means any person who owns or operates a public water system.

  • Inter-connection Point means interface point of renewable energy generating facility with the transmission system or distribution system, as the case may be:

  • Levee system means a flood protection system which consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accordance with sound engineering practices.

  • PJM Region shall have the meaning specified in the Operating Agreement. “PJM Tariff,” “Tariff,” “O.A.T.T.,” “OATT,” or “PJM Open Access Transmission Tariff” shall mean that certain PJM Open Access Transmission Tariff, including any schedules, appendices or exhibits attached thereto, on file with FERC and as amended from time to time thereafter.

  • Capacity Resource shall have the meaning provided in the Reliability Assurance Agreement.

  • Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).

  • Generation Interconnection Customer means an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region.

  • Service Level means the standard set forth below by which IBM measures the level of service it provides in this SLA.

  • Attachment point means a point on the network at which network assets are connected to assets owned by another person.

  • Wastewater System means a system of wastewater collection, treatment,