Prefeasibility Study definition

Prefeasibility Study means the prefeasibility study dated March 17, 2020 included in the 2020 Marmato Technical Report.
Prefeasibility Study. (PFS) means the optional study that, if produced, is required to be submitted to EMRA by the Company under Section 2.3.
Prefeasibility Study means a prefeasibility study by a reputable engineering firm.

Examples of Prefeasibility Study in a sentence

  • The Company may produce, at its sole discretion, a Preliminary Economic Assessment (PEA) and a Prefeasibility Study (PFS).

  • White Rock announced in 20204 a positive updated Mt Xxxxxxxxxx Prefeasibility Study (U-PFS) based on a “Gold First Strategy” with a gold Probable Reserve (JORC 2012) using a conventional crush / grind and CIL processing circuit.

  • Upon the Optionee paying such sums, incurring such expenditures, issuing such Royce Shares and preparing and delivering the Pre-feasibility Study as required pursuant to sections 2.2(a), (b) and (c) hereof, the Optionee will be deemed to have exercised the Option and to have acquired a 100% right, title and interest in the Property, subject only to the Royalty.

  • Notwithstanding section 3.1, upon the Optionee, having completed the payments and share issuances pursuant to section 2.2(a) and having prepared and delivered a Pre-feasibility Study pursuant to section 2.2(c), notwithstanding the amount of exploration expenditures that may have been incurred on the Property, the Optionee will have earned a 100% interest in the Property.

  • To earn its interest, Barrick must incur a minimum US$10.0 million in exploration expenditures and deliver a qualifying Pre-feasibility Study prior to the sixth anniversary of the Agreement.


More Definitions of Prefeasibility Study

Prefeasibility Study means a prefeasibility study in respect of the Project completed by or on behalf of GCP.
Prefeasibility Study means a study of the feasibility of developing and operating a mine on the Properties, including an analysis of economic, engineering, geological, environmental, regulatory and other considerations, and containing the level of detail customary in the industry to determine whether the veins, ore bodies or other targets identified in Stage I of Earn-in Activities are of sufficient interest to the Parties to proceed with Stage II of Earn-in Activities (with all estimates developed to an accuracy within +/-15%).
Prefeasibility Study or “PFS” means the prefeasibility study on the Gunnison Project that is the subject of the Technical Report;
Prefeasibility Study means the early stage analysis of mineral exploration conducted by a geologist or a certified firm employing the qualified professional as per the Guidelines.
Prefeasibility Study means a comprehensive study of the viability of a mineral project that
Prefeasibility Study means the technical report dated November 6, 2012, prepared in accordance with NI 43-101 and entitled “Technical Report – Prefeasibility Study of the Carbon Creek Coal Property, British Columbia, Canada” by Xxxxx Xxxxxxxxx, Xxxx Xxxxx and Xxxxx Xxxxxxx of Norwest Corporation as filed on SEDAR on November 7, 2012;
Prefeasibility Study means a written study prepared by independent consultants under the Operator’s supervision at the direction of the Management Committee in such form and of such standard as may be required by the Management Committee, which shall include a preliminary evaluation of the commercial potential of an ore body within the limits of the Mining Properties, a preliminary engineering study (mining and exploitation methods, assessment of equipment, machinery and tools required) and a preliminary economical study (costs of capital, production schedule, annual estimated yield and budget).