Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.
Preliminary Work means all work done in the concept and preparatory stages (including non-exhaustively design, artwork, colour matching).
Independent Engineering Report means a report, in form and substance satisfactory to the Administrative Agent and each of the Lenders, prepared by an Independent Engineer, addressed to the Administrative Agent and the Lenders with respect to the Oil and Gas Properties owned by the Borrower or its Subsidiaries (or to be acquired by the Borrower or any of its Subsidiaries, as applicable) which are or are to be included in the Borrowing Base, which report shall (a) specify the location, quantity, and type of the estimated Proven Reserves attributable to such Oil and Gas Properties, (b) contain a projection of the rate of production of such Oil and Gas Properties, (c) contain an estimate of the net operating revenues to be derived from the production and sale of Hydrocarbons from such Proven Reserves based on product price and cost escalation assumptions specified by the Administrative Agent and the Lenders, and (d) contain such other information as is customarily obtained from and provided in such reports or is otherwise reasonably requested by the Administrative Agent or any Lender.
The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.
Feasibility Study means the evaluation and analysis of the potential of a project, which aims at supporting the process of decision-making by objectively and rationally uncovering its strengths and weaknesses, opportunities and threats, as well as identifying the resources required to carry it through and ultimately its prospects for success;
Initial Engineering Report means the engineering report concerning Oil and Gas Properties of Loan Parties dated as of June 30, 2006 prepared by Netherland, Xxxxxx & Associates and XxXxxxxx & XxxXxxxxxxx.
Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.
Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.
Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;
Project Engineer means the surveyor or engineer employed by or private
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Architect/Engineer or “A/E” means the Person identified in the Agreement responsible for providing professional design services and construction contract administration for the Project. The A/E shall be (1) a registered architect holding a license and certificate of authorization issued by the Ohio Architects Board pursuant to ORC Chapter 4703, (2) a landscape architect holding a license and certificate of authorization issued by the Ohio Landscape Architects Board pursuant to ORC Chapter 4703, or (3) a professional engineer or professional surveyor holding a license and certificate of authorization issued by the Ohio Engineers and Surveyors Board pursuant to ORC Chapter 4733. As used in the Agreement, the term A/E may include a criteria architect or engineer for a Design-Build project.
Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.
Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.
Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;
Design Development Documents means the Drawings, Specifications and other documents prepared by the Trade Contractor that establish and describe the size and character of the Trade Contractor Work as to architectural, civil, structural, mechanical and electrical systems, graphics and signage, and other elements, and which include typical construction details, equipment layouts and specifications that identify major materials and systems.
conformity assessment body means a body that performs conformity assessment activities including calibration, testing, certification and inspection;
Development Phase means the period before a vehicle type is type approved.
Project area budget means a multiyear projection of annual or cumulative
Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.
Development Report means a written account of Licensee’s progress under the Development Plan having at least the information specified on Appendix B to this Agreement, and shall be sent to the address specified on Appendix B.
Phase I Study means a study in humans which provides for the first introduction into humans of a product, conducted in healthy volunteers or patients to obtain information on product safety, tolerability, pharmacological activity or pharmacokinetics, as more fully defined in 21 C.F.R. § 312.21(a) (or the non-United States equivalent thereof).
Engineering Report means either an Independent Engineering Report or an Internal Engineering Report.
Independent Engineer means XxXxxxxx and XxxXxxxxxxx or any other third party engineering firm acceptable to the Administrative Agent in its sole discretion.
conformity assessment means the process demonstrating whether the requirements of this Regulation relating to a device have been fulfilled;
Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;