Preliminary Engineering Study definition

Preliminary Engineering Study means a preliminary study of the consumption of electricity of a System load within a Facility and activities and Measures that could give rise to Electricity Savings, meeting the minimum requirements as outlined in Exhibit B to the Program Rules;
Preliminary Engineering Study means a preliminary study of the consumption of electricity of a System within a Facility, or of a Facility, in order to assess and evaluate (a) Measures, or their implementation, that could give rise to Electricity Savings, or (b) where approved by the IESO, electricity generation by the Participant that could reduce the electricity consumption by a System within a Facility, or of a Facility, from a Distribution System.
Preliminary Engineering Study means a study conducted with respect to the Facility in accordance with an Engineering Study Incentive Schedule, meeting the minimum requirements as outlined in the Incentive Schedule;

Examples of Preliminary Engineering Study in a sentence

  • SIGN SUPPORTS 2-44 SECTION 200 - PRELIMINARY DESIGN 201 STRUCTURE TYPE STUDY 201.1 GENERAL In conformance with Section 1400 of the ODOT Location and Design Manual, Volume Three, a Structure Type Study shall be included in the Preferred Alternative Verification Review Submission for a Major Project or in the Minor Project Preliminary Engineering Study Review Submission.

  • Adopt the Recommended Alternative for the CR 747 Preliminary Engineering Study (PES) from C 48 to 1,000 feet south of C 478 (Staff Recommends Approval).

  • Utility urges the Company to enter into a Preliminary Engineering Study with Utility to develop a preliminary engineering cost estimate for this specific project.

  • Engineering costs (Interconnect Screening, Preliminary Engineering Study, and Detailed Engineering Study costs).

  • Task Order Four with Infrastructure Consulting and Engineering PLLC and Sumter County Board of County Commissioners (BOCC) for a Preliminary Engineering Study of CR 747 (Staff Recommends Approval).

  • Reasons for determining the use of the widths in Section 55-6.03 must be documented in the Preliminary Engineering Study for INDOT projects or in the Safety and Design Report for Local Public Agency projects.

  • A short discussion of the probable causes and corrective action to be incorporated into the project for each section and intersection should be included in the Preliminary Engineering Study for INDOT projects or in the Safety and Design Report for Local Public Agency projects.

  • The engineer should prepare a Preliminary Engineering Study for INDOT projects or a Safety and Design Report for LPA projects.

  • Reasons for determining the use of the width shown in Section 55-6.03 must be documented in the Preliminary Engineering Study for an INDOT-route project, or in the Safety and Design Report for a local-agency-route project.

  • The Services to be provided to Client by SoCalGas shall consist of the following tasks to this agreement including (check all that apply ) as detailed in the applicable Exhibit: • Exhibit A – Interconnect Capacity Study ( ),• Exhibit A1 – Preliminary Engineering Study ( ),• Exhibit A2 – Detailed Engineering Study ( ),• Exhibit A3 – Detailed Engineering Study and Long Lead Materials Procurement ( ).


More Definitions of Preliminary Engineering Study

Preliminary Engineering Study means a preliminary study of the System load within a Facility and specific activities, Measures and, if applicable, Generation that can be implemented in order to reduce the electricity consumption in the Facility, as further described in Exhibit B – Preliminary Engineering Study Minimum Requirements to these Program Rules;

Related to Preliminary Engineering Study

  • Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.

  • Preliminary Work means all work done in the concept and preparatory stages (including non-exhaustively design, artwork, colour matching).

  • Independent Engineering Report means a report, in form and substance satisfactory to the Administrative Agent and each of the Lenders, prepared by an Independent Engineer, addressed to the Administrative Agent and the Lenders with respect to the Oil and Gas Properties owned by the Borrower or its Subsidiaries (or to be acquired by the Borrower or any of its Subsidiaries, as applicable) which are or are to be included in the Borrowing Base, which report shall (a) specify the location, quantity, and type of the estimated Proven Reserves attributable to such Oil and Gas Properties, (b) contain a projection of the rate of production of such Oil and Gas Properties, (c) contain an estimate of the net operating revenues to be derived from the production and sale of Hydrocarbons from such Proven Reserves based on product price and cost escalation assumptions specified by the Administrative Agent and the Lenders, and (d) contain such other information as is customarily obtained from and provided in such reports or is otherwise reasonably requested by the Administrative Agent or any Lender.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Feasibility Study means the evaluation and analysis of the potential of a project, which aims at supporting the process of decision-making by objectively and rationally uncovering its strengths and weaknesses, opportunities and threats, as well as identifying the resources required to carry it through and ultimately its prospects for success;

  • Initial Engineering Report means the engineering report concerning Oil and Gas Properties of Loan Parties dated as of June 30, 2006 prepared by Netherland, Xxxxxx & Associates and XxXxxxxx & XxxXxxxxxxx.

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.

  • Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;

  • Project Engineer means the surveyor or engineer employed by or private

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Architect/Engineer or “A/E” means the Person identified in the Agreement responsible for providing professional design services and construction contract administration for the Project. The A/E shall be (1) a registered architect holding a license and certificate of authorization issued by the Ohio Architects Board pursuant to ORC Chapter 4703, (2) a landscape architect holding a license and certificate of authorization issued by the Ohio Landscape Architects Board pursuant to ORC Chapter 4703, or (3) a professional engineer or professional surveyor holding a license and certificate of authorization issued by the Ohio Engineers and Surveyors Board pursuant to ORC Chapter 4733. As used in the Agreement, the term A/E may include a criteria architect or engineer for a Design-Build project.

  • Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Design Development Documents means the Drawings, Specifications and other documents prepared by the Trade Contractor that establish and describe the size and character of the Trade Contractor Work as to architectural, civil, structural, mechanical and electrical systems, graphics and signage, and other elements, and which include typical construction details, equipment layouts and specifications that identify major materials and systems.

  • conformity assessment body means a body that performs conformity assessment activities including calibration, testing, certification and inspection;

  • Development Phase means the period before a vehicle type is type approved.

  • Project area budget means a multiyear projection of annual or cumulative

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Development Report means a written account of Licensee’s progress under the Development Plan having at least the information specified on Appendix B to this Agreement, and shall be sent to the address specified on Appendix B.

  • Phase I Study means a study in humans which provides for the first introduction into humans of a product, conducted in healthy volunteers or patients to obtain information on product safety, tolerability, pharmacological activity or pharmacokinetics, as more fully defined in 21 C.F.R. § 312.21(a) (or the non-United States equivalent thereof).

  • Engineering Report means either an Independent Engineering Report or an Internal Engineering Report.

  • Independent Engineer means XxXxxxxx and XxxXxxxxxxx or any other third party engineering firm acceptable to the Administrative Agent in its sole discretion.

  • conformity assessment means the process demonstrating whether the requirements of this Regulation relating to a device have been fulfilled;

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;