Preliminary Project definition

Preliminary Project means a project which outlines the conceptual and basic design elements and factors of a particular healthcare premise, including the list of the required items and possible locations, which is prepared based on the ground, soil and land investigations as required by the final requirements program and by making use of the existing information on the maps, which also proposes one or more solutions incorporating the drawings, cross-sections, appearances and profiles prepared based on the information and data provided by the Environmental Impact Assessment (EIA) and feasibility report, as applicable;

Examples of Preliminary Project in a sentence

  • The approved Preliminary Project Schedule will be used for payment purposes not to exceed 90 calendar days after NTP.

  • The University reserves the right to issue written orders whether through a formal Change Order or Preliminary Project Cost and Schedule Impact Report, directing changes in the Contract at any time prior to the acceptance of the Project without voiding the Contract, and Contractor shall promptly comply with such order or direction.

  • Completely cost load the Preliminary Project Schedule to balance the contract award CLINS shown on the Price Schedule.

  • The University and Contractor understand and agree that the Contract Sum and Contract Time cannot be changed by implication, oral agreements, actions, inactions, course of conduct or Preliminary Project Cost and Schedule Impact Report.

  • Specify desired installation and acceptance dates for all items in Schedule below, modifying the sample line items and sample table entries as needed.] Line Item No. Subsystem / Item Configuration Table No. Site / Site CodeDelivery (Tenderer to specify in the Preliminary Project Plan) Installation (weeks from Effective Date) Acceptance (weeks from Effective Date) Liquidated Damages Milestone0Project Plan- -- - - -W_no1Subsystem 11 - -- -- -:etc.

  • The Preliminary Project Schedule may be summary in nature for the remaining performance period.

  • Format Preliminary Project Descriptions to match that specified by the latest edition of the Construction Specification's Institute's "Manual of Practice".

  • The Preliminary Project Plan must also address any other topics specified in the BDS.

  • Within 15 calendar days after the NTP is acknowledged submit the Preliminary Project Schedule defining the planned operations detailed for the first 90 calendar days for approval.

  • Submit the Preliminary Project Schedule, defining the Contractor's planned operations for the first 90 calendar days for approval within 15 calendar days after the NTP is acknowledged.

Related to Preliminary Project

  • Preliminary plat means a map showing the salient features of a proposed subdivision submitted to an approving authority for purposes of preliminary consideration.

  • Preliminary Work means all work done in the concept and preparatory stages (including non-exhaustively design, artwork, colour matching).

  • Preliminary Prospectus means any preliminary prospectus referred to in paragraph 1(a) above and any preliminary prospectus included in the Registration Statement at the Effective Date that omits Rule 430A Information.

  • Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.

  • Preliminary Prospectuses means, collectively, the Canadian Preliminary Prospectus and the U.S. Preliminary Prospectus;

  • Canadian Preliminary Prospectus means the Initial Canadian Preliminary Prospectus, as amended by the Amended and Restated Canadian Preliminary Prospectus, including the Documents Incorporated by Reference;

  • U.S. Preliminary Prospectus means the Canadian Preliminary Prospectus with such deletions therefrom and additions thereto as are permitted or required by Form F-10 and the applicable rules and regulations of the SEC, included in the Initial Registration Statement as amended at such time, including the Documents Incorporated by Reference therein;

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Preliminary Prospectus Supplement means any preliminary prospectus supplement to the Base Prospectus which describes the Securities and the offering thereof and is used prior to filing of the Final Prospectus Supplement, together with the Base Prospectus.

  • Preliminary Final Prospectus means any preliminary prospectus supplement to the Basic Prospectus which describes the Securities and the offering thereof and is used prior to filing of the Final Prospectus, together with the Basic Prospectus.

  • Preliminary Plans means a site plan, architectural floor plans, elevations, outline specifications and a cost estimate for each utility, site development, conversion, and remodeling project. The drawings shall be sufficiently descriptive to accurately convey the location, scope, cost and the nature of the improvement being proposed.

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Preliminary Mortgage Schedule As defined in Section 3.

  • Public project means any of the following:

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Project Facility means facility being one or more of the following facilities as specified in the Special Conditions of Contract, being developed in accordance with the Project and the Detailed Project Implementation Report and includes all its buildings, equipment, facilities, software and systems and includes without limitation, where the circumstances so require, any expansion thereof from time to time and may include any new location to be separately mentioned in the Special Conditions of Contract.

  • Mixed-use project means a project comprising both a qualified

  • Additional Facilities has the meaning assigned to that term in Section 2.9(a).

  • Redevelopment project means a specific construction project

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Condominium Project Real estate including the separate ownership in fee, or on a satisfactory leasehold estate, of a particular residential unit with an indivisible interest in the real estate designated for common ownership strictly by unit owners.

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Preliminary Offering Memorandum means the preliminary offering memorandum consisting of the Red Xxxxxxx Prospectus and the preliminary international wrap to be used for offer and sale to persons/entities that are resident outside India;

  • Major project means a project comprising of a series of works, activities or services which is intended, in itself, to accomplish a definite and indivisible task of a precise economic or technical nature, which has clearly identified goals and whose total cost exceeds that which is specified in the Framework Agreement;

  • Existing Project means a project declared under commercial operation prior to the date of effectiveness of these Regulations;

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.