Examples of Production Testing in a sentence
In addition to accurate financial and accounting records, Employees are responsible for maintaining complete and accurate records pertaining to Operations, Quality, R&D, Production, Testing etc.
Certified Interconnection Equipment shall not require further design testing or Production Testing, as specified by IEEE Standard 1547 Sections 5.1 and 5.2, or additional Interconnection Equipment modification to meet the requirements.
If the proposal to plug and abandon a Development Well that has not produced Hydrocarbons (other than as a result of Production Testing) does not receive approval by Vote, but the Operator deems the well bore not to be safe or in sound enough condition for it to perform further operations, the Operator may nevertheless proceed to plug and abandon that Development Well and shall give each Participating Party notice of that fact.
If the proposal to plug and abandon an Exploratory Well that has not produced Hydrocarbons (other than as a result of Production Testing) does not receive approval by Vote, but the Operator deems the well bore not to be safe or in sound enough condition for it to perform further operations, the Operator may nevertheless proceed to plug and abandon that Exploratory Well, and shall give each Participating Party notice of that fact.
Included are Type Testing, Production Testing, Commissioning Testing, and Periodic Testing.
Any Participating Party may propose the permanent plugging and abandonment of a well that has produced Hydrocarbons (other than as a result of Production Testing) by notifying the other Participating Parties.
If the proposal to plug and abandon an Appraisal Well that has not produced Hydrocarbons (other than as a result of Production Testing) does not receive approval by Vote, but the Operator deems the well bore not to be safe or in sound enough condition for it to perform further operations, the Operator may nevertheless proceed to plug and abandon that Appraisal Well, and shall give each Participating Party notice of that fact.
Equipment tested and approved (e.g. listed) by a NRTL as having met both the Type Testing and Production Testing requirements is considered to be Certified Equipment for purposes of Interconnection with RPU’s Distribution System.
A type of trim and design accepted when test- ed in a vertical configuration may be used in a horizontal configuration without further testing.(3) Production Testing.
CSA’s Vegetable / Flower Seed / Grower Shipper Liaison & Plant Health Committee will form a subcommittee called “Cucurbit Seed Production Testing Program.” The subcommittee meetings will be led and conducted per CSA’s By-Laws.