Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.
Application Review Start Date means the later date of either the date on which the District issues its written notice that the Applicant has submitted a completed Application or the date on which the Comptroller issues its written notice that the Applicant has submitted a completed Application and as further identified in Section 2.3.A of this Agreement.
Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Timeline means the list of critical dates and actions included in the Introductory Materials.
Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.
Studies means activities needed to prepare project implementation, such as preparatory, mapping, feasibility, evaluation, testing and validation studies, including in the form of software, and any other technical support measure, including prior action to define and develop a project and decide on its financing, such as reconnaissance of the sites concerned and preparation of the financial package;
Feasibility Study means the evaluation and analysis of the potential of a project, which aims at supporting the process of decision-making by objectively and rationally uncovering its strengths and weaknesses, opportunities and threats, as well as identifying the resources required to carry it through and ultimately its prospects for success;
Study means the investigation to be conducted in accordance with the Protocol.
Samples means physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged.
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
Root Cause Analysis Report means a report addressing a problem or non-conformance, in order to get to the ‘root cause’ of the problem, which thereby assists in correcting or eliminating the cause, and prevent the problem from recurring.
Sample means a sample of blood, tissue or other biological material.
Test Complete has the meaning stated in Section 3.4(c).
Project Implementation Manual or “PIM” means the manual containing details of financial and accounting procedures, procurement arrangements, environmental and social monitoring and mitigation arrangements, and other administrative and organizational arrangements, as shall have been agreed with the Association for purposes of Project implementation, as the same may be amended from time to time, and such term includes any schedules to the PIM;
service delivery and budget implementation plan means a detailed plan approved by the executive mayor of the municipality, in terms of section 53(l) (c) (ii) of the MFMA, for implementing the municipality's delivery of municipal services and which indicate –
project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;
Virtual Completion means the premise is in the opinion of the Employer fit for occupation.
Project Deliverables means the Project deliverables set out in Schedule 2. Project Material means all the material including but not limited to documents, computer software, and data stored by any means which is created by the Fellow in the course of undertaking the Project.
Utilization review plan or "plan" means a written procedure for performing review.
Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
Improvement completion assurance means a surety bond, letter of credit,
Project Completion Date means the date on which the Completion Certificate is issued;
Batch means a specific quantity of Product that is intended to have uniform character and quality, within specified limits, and is produced according to a single manufacturing order during the same cycle of manufacture.