Raw Materials Cost definition

Raw Materials Cost means the direct cost of material used in a finished Product, including the normal quantity of material wasted in the production process, purchasing costs, inbound freight charges and any applicable subcontractor charges.
Raw Materials Cost has the meaning set forth in Section 9.1.
Raw Materials Cost means the actual delivered cost to AIPC of the ingredients used to manufacture the Products, including but not limited to semolina, first clear flour, egg powder, spinach powder, tomato powder and enrichments. The cost of semolina shall be calculated in accordance with Exhibit 2.2.1(a).

Examples of Raw Materials Cost in a sentence

  • According to a recently published report by IMARC group titled “Potato Chips Market – Industry Trends, Manufacturing Process, Plant Setup, Machinery, Raw Materials, Cost and Revenue” potato chips represent the second largest segment of the global savoury snack food market.

  • Cost incurred in bringing each product to its present location and condition are accounted as follows:(a) Raw Materials: Cost includes Cost of Purchase and other costs incurred in bringing the inventories to their present location and condition.

  • If raw materials are A50 per chair, then: NUMBER OF CHAIRS This can be represented on a graph where the variable cost line is an upward sloping line as follows: Figure 1.1: Variable cost graphY-axis Raw Materials Cost A1 5001 0005000102030X-axis Number of chairsVariable CostFixed costA fixed cost remains the same or fixed regardless of the level of activity.

  • Cost of inventories is computed on FIFO basis.Cost incurred in bringing each product to its present location and condition are accounted as follows:(a) Raw Materials: Cost includes Cost of Purchase and other costs incurred in bringing the inventories to their presentlocation and condition.

  • Table 4.2 indicates the descriptive statistics of the relative share of labor and raw materials of firms over the period between 1996 and 2007.Table 4.2: Descriptive Statistics of Input Cost Shares from GVP (1996-2007)Statistics Labor Cost Share Raw Materials Cost Share Minimum0.0020.05Mean0.1490.463Median0.1130.483Standard Deviation0.1140.207Max0.6120.855Source: Own Calculation based on CSA (Various Years).

  • Any delay in the submittal of the Archeological Construction Monitoring, Mitigation and Preservation Plans shall result in a day for day reduction to the date to which the Fixed Design-Build Price shall be adjusted pursuant to subsections 10.1(C)(3) (ECI-Construction Labor Cost Adjustment) and 10.1(C)(4) (Adjustment for Certain Raw Materials Cost Fluctuations).

  • In addition, Raw Materials Cost may be adjusted at other times, effective upon thirty (30) days prior written notice to Sysco, in the event of *.

  • Upon request, Consultants or the Company, as the case may be, shall provide to the other, in writing, a reasonable explanation of any changes in Raw Materials Cost, Packaging Cost or other components of Fully Loaded Manufacturing Costs that resulted in a price change to the Company.

  • The study makes use of the various variables that are used in the manufacturing industry such as; Raw Materials Cost, Storage Cost, and Inventory Conversion Period.

  • Figure 3 Comparison of Raw Materials Cost Between Coal and Hydrogen (Conversion rate USD$1 = RM4.40) In addition to the raw material cost benefits, shifting to hydrogen in I&S production could also potentially mitigate the risk of coal price hike caused by supply-chain disruption, such as the recent coal export restriction by the Indonesian government because water (the raw material for green hydrogen) and renewable energies could be sourced locally.

Related to Raw Materials Cost

  • Raw Materials means all raw materials, supplies, components and packaging necessary to manufacture and ship the Product in accordance with the Specifications, as provided in Exhibit A, but not including the API.

  • Raw Material means any unprocessed material in its raw or natural state that is intended to become part of the components of a cannabis product.

  • Manufacturing Cost means ***

  • Cost of materials means the cost of components, parts or materials which are intended for the production, manufacturing or assembling of the goods bid for and which are not produced, manufactured or assembled in the factory where the production, manufacture or assembly of such goods occurs, including freight, landing costs, port charges, import duties and other import costs of such components, parts or materials and all costs in connection with the handling and transport thereof prior to delivery at that factory;

  • Consumables means where the context permits, Digital Print Consumables, Inkjet Printing System Consumables and Prepress Consumables.

  • Project Cost means the price payable to Service Provider over the entire period of Agreement (i.e. Rs. <in words>) for the full and proper performance of its contractual obligations.

  • Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).

  • The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Direct Cost means a cost not to exceed the cost of labor, material, travel and other expenditures to the extent the costs are directly incurred to provide the relevant assistance or service. “Direct Cost” to the Acquirer for its use of any of a Respondent’s employees’ labor shall not exceed the average hourly wage rate for such employee;

  • Manufacturing Costs means, with respect to a given AquaBounty Product, the full-time equivalent costs (under a reasonable accounting mechanism to be agreed upon by the Parties) and out-of-pocket costs that AquaBounty or any of its Affiliates incurred in manufacturing such products, including costs and expenses incurred in connection with (a) the development or validation of any manufacturing process, formulations or delivery systems, or improvements to the foregoing; (b) manufacturing scale-up; (c) in-process testing, stability testing and release testing; (d) quality assurance/quality control development; (e) internal and Third Party costs and expenses incurred in connection with qualification and validation of Third Party contract manufacturers, including scale up, process and equipment validation, and initial manufacturing licenses, approvals and inspections; (f) packaging development and final packaging and labeling; (g) shipping configurations and shipping studies; and (h) overseeing the conduct of any of the foregoing. “Manufacturing Costs” shall further include: (i) to the extent that any such AquaBounty Product is manufactured by a Third Party manufacturer, the out-of-pocket costs incurred by AquaBounty or any of its Affiliates to the Third Party for the manufacture and supply (including packaging and labeling) thereof, and any reasonable out-of-pocket costs and direct labor costs incurred by AquaBounty or any of its Affiliates in managing or overseeing the Third Party relationship determined in accordance with the books and records of such Party or its Affiliates maintained in accordance with US GAAP; and (ii) to the extent that any such AquaBounty Product is manufactured by AquaBounty or any of its Affiliates, direct material and direct labor costs attributable to such product, as well as reasonably allocable overhead expenses, determined in accordance with the books and records of AquaBounty or its Affiliates maintained in accordance with US GAAP.

  • Finished Services means complete end-to-end services offered by Qwest to wholesale customers or retail End User Customers. Finished Services do not include Unbundled Network Elements or combinations of Unbundled Network Elements. Finished Services include Access Services, private lines, retail services, and resold services.

  • Tooling means tools funded or provided by the Buyer.

  • Goods/Materials means any of the articles, materials, machinery, equipments, supplies, drawing, data and other property and all services including but not limited to design, delivery, installation, inspection, testing and commissioning specified or required to complete the order.

  • Drug Substance means an active ingredient that is intended to furnish pharmacological activity or other direct effect in the diagnosis, cure, mitigation, treatment, or prevention of disease or to affect the structure or any function of the human body, but does not include intermediates used in the synthesis of such ingredient.

  • Supplier Equipment means the Supplier's hardware, computer and telecoms devices, equipment, plant, materials and such other items supplied and used by the Supplier (but not hired, leased or loaned from the Customer) in the performance of its obligations under this Call Off Contract;

  • Consumable means any component of a good that is used up recurrently and needs to be replaced for the good to function as intended;

  • Routine Patient Costs means all health care services that are otherwise covered under the Group Contract for the treatment of cancer or other Life-threatening Condition that is typically covered for a patient who is not enrolled in an Approved Clinical Trial.

  • Finished Lots Entitled Land with respect to which (a) development has been completed to such an extent that permits to allow use and construction, including building, sanitary sewer and water, are entitled to be obtained for a Unit on such Entitled Land and (b) start of construction has not occurred.

  • Contract Work means everything required to be furnished and done by the Contractor by any one or more of the parts of the Contract referred to in Article 1, except Extra Work as hereinafter defined.

  • The Contract Price/ Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Cost of the Work means those costs described in Paragraph 11.2.

  • Major medical equipment means medical equipment which is used for the provision of medical and other health services and which costs in excess of the capital expenditure minimum, except that such term does not include medical equipment acquired by or on behalf of a clinical laboratory to provide clinical laboratory services if the clinical laboratory is independent of a physician's office and a hospital and it has been determined under Title XVIII of the Social Security Act to meet the requirements of paragraphs (10) and (11) of Section 1861(s) of such Act. In determining whether medical equipment has a value in excess of the capital expenditure minimum, the value of studies, surveys, designs, plans, working drawings, specifications, and other activities essential to the acquisition of such equipment shall be included.

  • Equipment Cost means, for each Unit, the purchase price therefor -------------- paid by the Owner Trustee to the Lessee pursuant to Section 2 of the Participation Agreement and as set forth in Schedule 1 to the Participation Agreement with respect to such Unit. Notwithstanding anything to the contrary contained in the Operative Agreements, the Equipment Cost for any Replacement Unit shall be deemed to be the Equipment Cost or deemed Equipment Cost of the Unit replaced by such Replacement Unit.

  • Extra Work means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Structural components means liners, leachate collection systems, final covers, run-on/run-off systems, and any other component used in the construction and operation of the MSWLF that is necessary for protection of human health and the environment.