Set Pressure definition

Set Pressure means the valve opening pressure in a relief valve which shall not exceed the marked service pressure;
Set Pressure means the pressure at which a pressure− relief device or pressure control is set to operate.
Set Pressure means the predetermined pressure at which a safety valve under operating conditions commences to open."

Examples of Set Pressure in a sentence

  • The tire air pressure is higher than Set Pressure.- The connection to the wheel valve within 1st filling sequence was not optimal.Press “Stop” button, check and reconnect wheel valve - and retry.

  • From one stand point the statement “If correctly selected and fitted an elastomeric seal will last for the lifetime of the product it is fitted to” to factors such as “Friction; Compression Set; Pressure, and Temperature meant giving maximum expected leakage rates as virtually impossible”.

  • The mechanical designer shall review the pressure limitations of all components and their relationship to the following levels of pressure:  System Operating Pressure  Set Pressure and Opening Range of Relief Devices  Maximum Allowable Working Pressure (MAWP)  Overpressure Test Pressure  Predicted Failure Pressure Sandia Facilities Standard Construction Specifications have been developed to meet the requirements of the Pressure Safety Program for their intended systems.

  • Start by opening a blank drawing, your company template file, or the project in which you want to place the parts.2. Set the new catalog you created current: Civil 3D ribbon > Home tab > Create Design >Set Pressure Network Catalog.3. Browse to the folder where the new SQLite catalog you created is stored.4. Select the new catalog from the Catalog database file: drop-down list.5. Save the file.

  • If the load is likely to contain air pockets, the time may be extended to remove as much air as possible.Pre-Vacuum (if vacuum fitted) – Set Pressure; Hold TimeThe set temperature determines the pressure to which the vessel is drawn down (for example, 500mBar), in order to begin removing air before sterilization.

  • This gas bottle method provides at the very best a simmer point, not the lift pressure and thus cannot comply with AS1271 Set Pressure Accuracy.

  • ZERO Set Pressure ZeroSets S15 (Piezo Zero Value) to the current sensor counts.

  • Optimization of Air compressor Set Pressure saving @6800 Units per year.

  • This will save around 22705 Units annually.Modification of Power circuit of 1000 kva Transformer to cater to “C”Plot lighting saving @8000 Units per year.Optimization of Air compressor Set Pressure saving @6800 Units per year.Installation of energy efficient passenger lift which will save @16500 Units per annum.At SLPP:-Installation of new energy efficient ‘ENCON’ make cooling tower fans was done in cell no.3/1 & 2/2.

  • The Set Pressure Limits tab serves for setting the pressure limits in the pump.Fig 13: UNI Pump Control Setup - Set Pressure LimitsConversion of Clarity Figures to Device Communication FormatThis section serves for setting the calculation equation for pressure between Clarity and the pump figures.

Related to Set Pressure

  • Pressure means relative pressure versus atmospheric pressure, unless otherwise stated.

  • Vapor pressure as herein used means Vapor Pressure at 100° Fahrenheit as determined by ASTM Method D-323-90, "Standard Method of Test for Vapor Pressure of Petroleum Products (Reid Method)."

  • True vapor pressure means the equilibrium partial pressure exerted by a petroleum liquid as determined in accordance with methods described in American Petroleum Institute (API) Bulletin 2517, Evaporation Loss from External Floating Roof Tanks, 1980. The API procedure may not be applicable to some high viscosity or high pour crudes. Available estimates of true vapor pressure may be used in special cases such as these.

  • Reid vapor pressure means the vapor pressure of crude oil or other volatile petroleum products at 100 degrees Fahrenheit as determined by the latest edition of ASTM D6377 (RVPE): Standard Test Method for Determination of Vapor Pressure of Crude Oil.

  • Operating pressure means the pressure at which the parts of an irrigation system are designed by the manufacturer to operate.

  • Working pressure means the settled pressure of a compressed gas at a reference temperature of 15 °C in a full pressure receptacle;

  • Pressure vessel means a vessel that may be used for containing, storing, distributing, transferring, distilling, processing or otherwise handling any gas, vapour or liquid under pressure greater than the atmospheric pressure and includes any pipeline fitting or other equipment attached thereto or used in connection therewith; and

  • Low water pressure means water pressure below the regulatory reference level which is the minimum pressure when demand on the system is not abnormal.

  • design pressure means the maximum pressure that a pressure vessel or plant is designed to withstand safety when operating normally;

  • Heat input means the product (expressed in mmBtu/time) of the gross calorific value of the fuel (expressed in Btu/lb) and the fuel feed rate into the combustion device (expressed in mass of fuel/time) and does not include the heat derived from preheated combustion air, recirculated flue gases, or ex- haust from other sources.

  • Vessels shall have the meaning set forth in the recitals.

  • LNG means liquefied natural gas.

  • Pipelines has the meaning set forth in the Recitals.

  • Altitude means the vertical distance of a level, a point or an object considered as a point, measured from mean sea level (MSL);

  • Output means the exposure rate, dose rate, or a quantity related in a known manner to these rates from a brachytherapy source or a teletherapy, remote afterloader, or gamma stereotactic radiosurgery unit for a specified set of exposure conditions.

  • Interconnector means a transmission line which crosses or spans a border between Member States for the purpose of connecting the national transmission system of those Member States or a transmission line between a Member State and a third country up to the territory of the Member States or the territorial sea of that Member State;

  • Gasification means the substoichiometric oxidation or steam reformation of a substance to produce a gaseous mixture containing two or more of the following: (i) oxides of carbon; (ii) methane; and (iii) hydrogen;

  • low voltage means the set of nominal voltage levels that are used for the distribution of electricity and whose upper limit is generally accepted to be an a.c. voltage of 1000V ( or a d.c. voltage of 1500 V). [SANS 1019]

  • Sensor means any measurement device that is not part of the vehicle itself but installed to determine parameters other than the concentration of gaseous and particle pollutants and the exhaust mass flow.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Diatomaceous earth filtration means a process resulting in substantial particulate removal in which (1) a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and (2) while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.

  • voltage means the root-mean-square value of electrical potential between two conductors.

  • MAOP means the maximum allowable operating pressure of the Maui Pipeline or any part of it, as set out in Schedule 6.

  • Positive pressure respirator means a respirator in which the pressure inside the respiratory inlet covering exceeds the ambient air pressure outside the respirator.

  • Sound pressure level means twenty times the logarithm to the base 10 of the ratio of the effective pressure (µPa) of a sound to the reference pressure of 20 µPa;

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.