Engineering Reports has the meaning assigned such term in Section 2.07(c)(i).
Progress Reports The Progress Reports as required by the individual Task Work Orders issued pursuant to this Agreement. Responsible: Responsible or Responsibility means the financial ability, legal capacity, integrity and past performance of Contractor and as such terms have been interpreted relative to public procurements. See NYS Finance Law § 163(1)(c).
Environmental Reports means each and every “Phase I Environmental Site Assessment” (and, if applicable, “Phase II Environment Site Assessment”) as referred to in the ASTM Standards on Environmental Site Assessments for Commercial Real Estate, E 1527-2000 and an asbestos survey, with respect to each Mortgaged Property, prepared by one or more Environmental Auditors and delivered to Lender and any amendments or supplements thereto delivered to Lender.
Inspection Report means the report delivered by the Master Servicer or the Special Servicer, as the case may be, substantially in the form of Exhibit L hereto.
Site Assessment means an environmental assessment report for the Mortgaged Property prepared at Borrower’s expense by a qualified environmental consultant engaged by Borrower, or by Lender on behalf of Borrower, and approved by Lender, and in a manner reasonably satisfactory to Lender, based upon an investigation relating to and making appropriate inquiries to evaluate the risks associated with Mold and any existence of Hazardous Materials on or about the Mortgaged Property, and the past or present discharge, disposal, release or escape of any such substances, all consistent with the most current version of the ASTM 1527 standard (or any successor standard published by ASTM) and good customary and commercial practice.
Engineering Report means either an Independent Engineering Report or an Internal Engineering Report.
Monthly Reports shall have the meaning specified in Section 5.16(b) of the Indenture.
Survey Report means a report of the results of a Survey, containing the information set out in clause 12.4 and Schedule 6.
Reports means the reports described in Schedule B as well as any other reports or information required to be provided under the Enabling Legislation or this Agreement;
Environmental Information Regulations means the Environmental Information Regulations 2004 and any guidance and/or codes of practice issued by the Information Commissioner or relevant government department in relation to such regulations.
Surveys has the meaning set forth in Section 4(o) above.
Compliance Report means, as applicable in relation to the test being conducted, a report containing the results of the Compliance Tests carried out by State Street.
MI Reporting Template means the form of report set out in the Annex to Framework Schedule 8 (Management Information) setting out the information the Supplier is required to supply to the Authority;
Geotechnical report or "geotechnical analysis" means a scientific study or evaluation conducted by a qualified expert that includes a description of the ground and surface hydrology and geology, the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes, conclusions and recommendations regarding the effect of the proposed development on geologic conditions, the adequacy of the site to be developed, the impacts of the proposed development, alternative approaches to the proposed development, and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties. Geotechnical reports shall conform to accepted technical standards and must be prepared by qualified professional engineers or geologists who have professional expertise about the regional and local shoreline geology and processes.
ESDM Report means the Emission Summary and Dispersion Modelling Report prepared in accordance with the Procedure Document by Donald Hum of DHM Engineering Ltd. and dated October 8, 2010 submitted in support of the application, and includes any amendments to the ESDM Report listed in Schedule A and all up-dated ESDM Reports prepared as required by the Documentation Requirements conditions of this Certificate.
Updates are changes that do not require a change to the established Centralized Contract terms and conditions. A request to add new products at the same or better price level is an example of an update. “Amendments” are any changes that are not specifically covered by the terms and conditions of the Centralized Contract, but inclusion is found to be in the best interest of the State. A request to change a contractual term and condition is an example of an amendment.
Geotechnical engineer means a Professional Engineer whose principal field of specialization is the design and Construction of earthworks in a permafrost environment.