Data Protection Impact Assessment means an assessment by the Controller of the impact of the envisaged processing on the protection of Personal Data.
Risk assessment means a programme to determine any risk associated with any hazard at a construction site , in order to identify the steps needed to be taken to remove, reduce or control such hazard;
Environmental and Social Impact Assessment or “ESIA” means a site-specific report, to be prepared in accordance with the parameters laid down in the ESMF (as hereinafter defined) and acceptable to the Association, identifying and assessing the potential environmental and social impacts of the activities to be undertaken for the Project, evaluating alternatives, and designing appropriate mitigation, management, and monitoring measures.
conformity assessment means the process demonstrating whether the requirements of this Regulation relating to a device have been fulfilled;
Root Cause Analysis Report means a report addressing a problem or non-conformance, in order to get to the ‘root cause’ of the problem, which thereby assists in correcting or eliminating the cause, and prevent the problem from recurring.
Needs assessment In this section, LEAs are asked to describe the impact of the pandemic on their students, examine disproportionate impacts on specific student groups, and highlight the LEA’s promising practices in supporting students’ needs since March 2020.
Family assessment means a comprehensive assessment of child
Site Assessment means an environmental assessment report for the Mortgaged Property prepared at Borrower’s expense by a qualified environmental consultant engaged by Borrower, or by Lender on behalf of Borrower, and approved by Lender, and in a manner reasonably satisfactory to Lender, based upon an investigation relating to and making appropriate inquiries to evaluate the risks associated with Mold and any existence of Hazardous Materials on or about the Mortgaged Property, and the past or present discharge, disposal, release or escape of any such substances, all consistent with the most current version of the ASTM 1527 standard (or any successor standard published by ASTM) and good customary and commercial practice.
Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;
Testing laboratory means a laboratory, facility, or entity in the state that offers or performs tests of cannabis or cannabis products and that is both of the following:
Standard Methods for the Examination of Water and Wastewater means the most recent edition of Standard Methods for the Examination of Water and Wastewater published jointly by the American Public Health Association, the American Waterworks Association and the Water Environment Federation;
Functional behavioral assessment means an individualized assessment of the student that results in a team hypothesis about the function of a student’s behavior and, as appropriate, recommendations for a behavior intervention plan.
conformity assessment body means a body that performs conformity assessment activities including calibration, testing, certification and inspection;
Initial Environmental Examination or “IEE” means the initial environmental examination for the Project, including any update thereto, prepared and submitted by the Borrower and cleared by ADB;
Clinical review criteria means the written screening procedures, decision abstracts, clinical protocols, and practice guidelines used by a health carrier to determine the necessity and appropriateness of health care services.
Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.
Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.