Examples of Storage pile in a sentence
Students serving detention are to have schoolwork or reading material available to utilize once detention responsibilities have been completed.
Storage pile identification: Minimum load-out inspection frequency: iron ore pellets weekly limestone/dolomite weekly coke weekly BF flue dust weekly swarf weekly lime weekly other* weekly The frequency of inspections for a particular type of storage pile may be reduced upon written approval by the Northeast District Office.
Storage pile emissions result from of both wind erosion from piles and the effect of equipment moving around, on, and in the vicinity of, storage piles.
Storage pile activity (Loading & unloading) should be conducted downwind.
The following are the estimates of PTE for the coal pile and the unloading of coal to it: Mine activity Plaintiff PTE tpyDefendant PTE tpyCoal unloading at storage pilePM25.10.16 - 0.27 PM105.70.08 - 0.09 PM2.50.50.01 - 0.01Coal storage pile wind erosionPM209.016.7 - 18.45 PM10104.58.4 - 9.22 PM2.515.71.3 - 3.69 Storage pile maintenance by bulldozer18PM PM10 PM2.542.910.20.921.01- 45.05.0 - 10.70.46 - 1.3Truck traffic through and around coalPM49.8No estimatestorage pilePM1014.2made PM2.51.4 (Doc.
Except as otherwise provided in this section, the permittee shall perform inspections of each load-in operation at each storage pile in accordance with the following frequencies: Storage pile identification Minimum Load-in inspection frequency All Storage Piles Daily 2.
The following parameters were chosen to calculate leaching emissions:− Storage pile: height 2 m, density 1800 kg/m3, average lifetime of storage one year, calculated11 percolation of 0.11 m corresponds to an L/S of 0.03 l/kg during storage for one year.− Pavement on road: height 0.2 m for bound base layer and 0.04 m for surface layer, density 2400 kg/m3, average yearly percolation of 0.05 m/y corresponds to an L/S of 0.087 l/kg, y or8.7 l/kg for a service life of 100 years.
Storage pile work will be curtailed during high winds in accordance with abnormal operating procedures for high winds.
The impoundments capture stormwater runoff from Deicing Salt Storage pile pads and rail car unloading areas.Southcentral Region: Clean Water Program Manager, 909 Elmerton Avenue, Harrisburg, PA 17110.
Storage pile identification: Minimum load-in inspection frequency: iron ore pellets weekly limestone/dolomite weekly coke weekly BF flue dust weekly swarf weekly lime weekly other* weekly The frequency of inspections for a particular type of storage pile may be reduced upon written approval by the Northeast District Office.