System Tests definition

System Tests means the tests described in this Schedule which constitute the Acceptance Criteria and successful completion of which constitutes Acceptance for the portion of the System in question.
System Tests means those tests which involve simulating conditions and recording them or the controlled application of irregular, unusual or extreme conditions on the Power System or any part of it and recording them, but not including routine testing, commissioning or re- commissioning tests;
System Tests as defined in Article 4.4.

Examples of System Tests in a sentence

  • Integrated System Tests are executed after Functional Performance Tests are complete and prior to Substantial Completion.

  • Integrated System Tests provide verification that the integrated systems will properly function according to the Contract Documents.

  • A Test Panel will not generally be needed for a routine test and, since the majority of System Tests are routine, the establishment of a Test Panel will be the exception rather than the rule.

  • Anchorage System Tests for STANDARD Systems: Anchorage system test reports shall demonstrate that assembled tendons with production anchors and corresponding wedges comply with the PTI M10.6‐15: Specification for Unbonded Single Strand Tendons.

  • Key intermediate milestones include availability of the complete Detailed Technical Specifications by September 2008, readiness of network connections in OST (Operational System Tests) Member States by late September 2008 and starting of tests involving the Member States in late November 2008 for completion by May 2009.

  • Details of these tests (which will be a subset of System Tests for FAT and a subset of Solution Tests for SP UAT) will be described in the FAT and SP UAT plans.

  • The anchorage system tests required are as follows:  Static test (M10.6‐15, Section 2.2.1.1) Fatigue test (M10.6‐15, Section 2.2.1.2)Anchorage System Tests for ENCAPSULATED Systems: Anchorage system test reports shall demonstrate that assembled tendons with production anchors and corresponding wedges comply with the applicable PTI specification.

  • Further detail on the Proposed Continuous monitoring of MW Availability standard can be found in Appendix C.6.4 PPM CONTROL SYSTEM TESTSCompliance Testing/monitoringTitle of Test: PPM Control System Tests Test Number: 4 Purpose of Test:Great reliance is placed on the reliability of PPM control systems.

  • Owner may require Contractor to reschedule Integrated System Tests to ensure availability of Owner’s representative(s).

  • Details of these tests (which will be a subset of System Tests for FAT will be described in the FAT plans.


More Definitions of System Tests

System Tests has the meaning defined in Section 10.6.
System Tests has the meaning defined in Section 13.2.

Related to System Tests

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Testing means that element of inspection that determines the properties or elements, including functional operation of materials, equipment, or their components, by the application of established scientific principles and procedures.

  • Performance Tests means all tests meant to ensure that the Plant(s)/Unit(s) is/are in all respects in accordance with the requirements of the Contract and that the Plant functions properly and smoothly, in all respects as per the approved design parameters, within the permissible tolerances, and satisfies all the stipulated operating parameters, and will include the Guarantee Tests.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • system user means a natural or legal person supplying to, or being supplied by, a transmission or distribution system;

  • Test means such test as is prescribed by the particulars or considered necessary by the Inspecting Officer whether performed or made by the Inspecting Officer or any agency acting under the direction of the Inspecting Officer;

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • System Downtime means any interruption of access to the Hosting Web Site as measured by the System Availability Monitoring Mechanism. System Downtime specifically excludes: (a) any Scheduled Downtime; (b) inability to access the System resulting from failure in the internet backbone or networks not directly managed by NCR Voyix or its subcontractors or agents; (c) erroneous System monitoring, in which NCR Voyix establishes that the incorrect reporting of the inability to access the System was due to failure in the monitoring mechanism rather than a failure in the System; (d) an Extreme Service Interruption Event; or (e) any System Downtime caused by Customer.

  • System Data means data and data elements collected by the SaaS Software, SaaS Service or Licensor’s computer systems regarding configuration, environment, usage, performance, vulnerabilities and security of the SaaS Software or SaaS Service that may be used to generate logs, statistics and reports regarding performance, availability, integrity and security of the SaaS Software.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Contractor System means the information and communications technology system used by the Contractor in performing the Services including the Software, the Contractor Equipment and related cabling (but excluding the Authority System).

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Monitoring System means a system established by BNY to fulfill the Responsibilities specified in clauses (d) and (e) of Section 1 of Article III of this Agreement.

  • Recalibration means the adjustment of all DRG weights to reflect changes in relative resource consumption.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Calibration means the determination of (1) the response or reading of an instrument relative to a series of known radiation values over the range of the instrument, or (2) the strength of a source of radiation relative to a standard.

  • Electronic Subcontracting Reporting System (eSRS) means the Governmentwide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • MERS(R) System The system of recording transfers of Mortgages electronically maintained by MERS.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.