Tower Evaluation definition

Tower Evaluation. A structural evaluation of the existing tower and foundation for the new equipment has been performed and the tower was confirmed compliant with Transmission Owner’s and ANSI/TIA 222-G-2005 Class III standards. The tower was originally designed for future additions. Antennas: A 6 foot diameter antenna pointing to Xxxx Substation and a working platform will be installed on the existing tower at the 180 ft and 176 ft levels respectively in accordance with the design specifications. Radio Equipment: Radio and associated equipment will be provided in accordance with Transmission Owner’s standards. Xxxx Substation: Civil/site work: The microwave tower and equipment shelter will be located within the new substation and no additional site work will be required. Grounding: Tower will be provided with a lightning protection system in accordance with EIA requirements and will be connected to the substation grounding system. Communications shelter will be grounded to the below grade grounding system according to the Motorola Grounding and Bonding Manual, R56. Station Service: Power will be supplied from the substation service supply. Power to the DC equipment will be through a UPS battery/charger system, which will have a 12 hour capacity. Tower: 195 ft high free standing galvanized steel lattice tower. Tower to be designed to ANSI/TIA 222-G-2005 Class III standards. Antennas: A 12 ft diameter antenna pointing to Big Hill will be installed 185 ft above ground. A 6 ft diameter antenna pointing to Xxxxxx Substation will be installed 160 ft above ground. Building: The communications equipment will be installed in a 10 ft x 13 ft x 9 ft high pre-cast concrete building. Building will be designed to meet New York State Building Code requirements. Radio Equipment: Radio and associated equipment will be provided in accordance with Transmission Owner standards.
Tower Evaluation. A structural evaluation of the existing tower and foundation for the new equipment has been performed. The tower was confirmed compliant with Transmission Owner’s and ANSI/TIA 222-G-2005 Class III standards. Antennas: A 6 ft diameter antenna pointing to Big Hill will be installed on the existing tower 150 ft above ground in accordance with the design specifications. Radio Equipment: Radio and associated equipment will be provided in accordance with Transmission Owner specifications.
Tower Evaluation. A structural evaluation of the existing tower and foundation for the new equipment has been performed and the tower was confirmed compliant with Transmission Owner’s and ANSI/TIA 222-G-2005 Class III standards. The tower was originally designed for future additions. Antennas: A 6 foot diameter antenna pointing to Xxxx Substation and a working platform will be installed on the existing tower at the 180 ft and 176 ft levels respectively in accordance with the design specifications. Radio Equipment: Radio and associated equipment will be provided in accordance with Transmission Owner’s standards. Civil/site work: The microwave tower and equipment shelter will be located within the new substation and no additional site work will be required. Foundation: Reinforced concrete mat foundation with piers. Grounding: Tower will be provided with a lightning protection system in accordance with EIA requirements and will be connected to the substation grounding system. Communications shelter will be grounded to the below grade grounding system according to the Motorola Grounding and Bonding Manual, R56.

Examples of Tower Evaluation in a sentence

  • Tower presented in its most recently filed annual report under the Exchange Act the conclusions of the certifying officers about the effectiveness of the disclosure controls and procedures based on their evaluations as of the Tower Evaluation Date.

  • Since the Tower Evaluation Date, there have been no changes in Tower’s internal control over financial reporting (as such term is defined in the Exchange Act) that has materially affected, or is reasonably likely to materially affect, Tower’s internal control over financial reporting, and no significant deficiencies or material weaknesses in internal controls over financial reporting, or other factors that could significantly affect Tower’s internal controls over financial reporting, have been identified.

  • The scope of work will include the following: Tower Evaluation: A structural evaluation of the existing tower and foundation for the new equipment has been performed.

  • This design shall take into account the Water Tower Evaluation Report, as performed by Bolton and Menk in 2015.

  • The details of the evaluation and retrofit alternatives can be found in the reports dated September 2008 titled Seismic Evaluation of Retrofit Options for Briones Outlet Tower, and March 2009 titled Briones Reservoir – Inlet/Outlet Tower: Evaluation of Retrofit Options, Final Report.

Related to Tower Evaluation

  • Independent educational evaluation means an evaluation conducted by a qualified examiner who is not employed by the public agency responsible for the education of the child in question.

  • Electronic Subcontracting Reporting System (eSRS) means the Governmentwide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.

  • Fraud Monitoring System means an off-line administration system that monitors suspected occurrences of ABT- related fraud.

  • Operating System refers to the software that manages the Hardware Device. You have the right to use the Operating System delivered with the Hardware Device (and any updates acquired through our technical support services) only as incorporated in, and as part of, the Hardware Device and subject to the terms of the license agreement(s) delivered with or on the Hardware Device. Current versions of the license agreements are located in the documentation for the Hardware Device.

  • Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time averager, output meter, and weighting networks used to measure sound pressure levels.

  • Financial Monitoring Report or “FMR” means each report prepared in accordance with Section 4.02 of this Agreement;