Water Permit definition
Examples of Water Permit in a sentence
District has determined that the construction of this Project requires enrollment in the Construction Storm Water Permit.
The insurance Notice of Intent must be sent to the following address along with the appropriate payment (warrant to be furnished by the District upon request by the Contractor, allow warrant processing time.): California State Water Resource Control Board, Division of Water Quality, Storm Water Permit Unit, P.O. Box 1977, Sacramento, California 95812-1977.
The design must satisfy the design criteria set out in the Ministry of the Environment, Conservation and Parks publication “Water Main Design Criteria for Future Alterations Authorized under a Drinking Water Permit – June 2012”.
Port Industrial Storm Water Permit Activities include: NPDES Permit reporting, inspection and compliance; onsite water quality and flow control, stream monitoring, industrial waste system (IWS) operation and education and outreach.
After construction of the project is complete, the Municipality agrees to follow and maintain post-construction Best Management Practices as outlined in the Municipal Storm Water Permit that is filed with the Ohio Environmental Protection Agency (O.E.P.A.).
On September 2, 2009, the State Water Resources Control Board (State Water Board) adopted the Construction General Storm Water Permit (Permit).
Consultant shall comply with Chapter 4, Article 3, Division 3 of the San Diego Municipal Code, Storm Water Management Discharge Control and the Municipal Storm Water Permit (MS4) Permit, California Regional Water Quality Control Board Order No. R9-2013-0001 (amended by R9-2015-0001 and R9- 2015-0100), Storm Water Standards Manual, as amended from time to time, and any and all Best Management Practice (BMP) guidelines and pollution elimination requirements as may be established by the Enforcement Official.
Permits required include: FDEP Water Permit, FDEP Wastewater Permit, Orange County E-Plan, and SFWMD Permit modification.
The design must satisfy the design criteria set out in the Ministry of the Environment publication “Water Main Design Criteria for Future Alterations Authorized under a Drinking Water Permit – June 2012”.
Before and during construction, the project would disturb more than one acre, the awardee will be required to obtain a General Construction Activity Storm Water Permit from the State Water Resources Control Board (SWRCB) for storm water discharges associated with construction activities.