Examples of Water Use Permit in a sentence
If water for any construction purpose is required from a non‑municipal water source, the Contractor shall obtain a Temporary Water Use Permit from the Water Resource Manager, and provide a copy to the Engineer.
The applicant shall utilize SFWMD, Part B Water Use Management System Design and Evaluation Aids, Part V, Supplemental Crop Requirement and Withdrawal Calculation, within Volume 3, Permit Information Manual for Water Use Permit Applications, to determine the 1-in-10 year drought and average rainfall conditions for the purpose of evaluating drought recharge rates.
An Industrial Water Use Permit is required for remediation projects that include groundwater or surface water withdrawals.
In re Water Use Permit Applications, 94 Hawaiʻi at 119, 9 P.3d at 431.
An Industrial Water Use Permit is required for remediation projects that include ground water or surface water withdrawals.