Air Traffic Control Tower and Technical Building Sample Clauses

Air Traffic Control Tower and Technical Building. The ATC tower complex comprises of the ATC tower, technical building and the utilities block. The ATC tower is designed to allow the controller eye level to be 68 m above surrounding ground level. Category I ILS system has been selected for both the approaches to provide the necessary operational efficiency for air traffic movements. The ATC tower has the workspaces and supporting equipment planned on three levels at the top of the tower. The apron control is located in the ATC tower below the air traffic control room for arrival and departure manoeuvres. Staff facilities such as pantry and toilets are also provided at this level. Another level houses the technical equipment and machine rooms. A balcony is provided for maintenance of the glazing. The control room floor has a stepped profile to allow unobstructed vision. The total height of the tower is about 70m. The load bearing elements are the service shaft which houses 2 elevators and a staircase. The airside face of the elevator shafts has glazing supported by a series of beams between the cone and the shell. The tower roof is in steel and is supported by the mullions on the periphery which also support the glazing. The total area of ATC tower is about 1170 sq.m. The technical building is a 2 level reinforced concrete framed structure of size 34m x 44.5m and is connected to the tower by an elevated passage at first floor level. The total area of technical building is about 2050 sq.m. Most areas are provided with an access floor. The utility block has a size of 20m x 10m and houses the substation and air-conditioning plant. Workspaces in the tower and technical block shall have access floors with carpet tiles. UPS rooms shall have anti-static rubberized floors. The courtyard in the technical building shall be landscaped with a subsoil drainage network floor. Technical rooms shall have anti-static rubberized floor. Anti skid ceramic tile floors shall be provided in toilets, rest rooms and pantry. Equipment rooms shall have industrial grade rubberized floors. The north and south facades and court facing facades of technical building shall have glazed curtain walls. The east and west facades shall be finished in a dry stone cladding. External walls of service areas will have metal cladding with louvers for air extraction and ventilation. The roof of technical building shall be in structural steel and pre-coated profiled metal sheeting. The roof dips over the entrance lounge and extends to the base. The ro...
AutoNDA by SimpleDocs

Related to Air Traffic Control Tower and Technical Building

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Trunk Group Architecture and Traffic Routing 5.2.1 The Parties shall jointly establish Access Toll Connecting Trunks between CLEC and CBT by which they will jointly provide Tandem-transported Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic from and to CLEC's Customers. 5.2.2 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access and non-translated Toll Free traffic (e.g., 800/888) to allow CLEC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier that is connected to the CBT access Tandem. 5.2.3 The Access Toll Connecting Trunks shall be one-way or two-way trunks, as mutually agreed, connecting an End Office Switch that CLEC utilizes to provide Telephone Exchange Service and Switched Exchange Access Service in the given LATA to an access Tandem Switch CBT utilizes to provide Exchange Access in the LATA.

  • Technology Access Contractor expressly acknowledges that state funds may not be expended in connection with the purchase of an automated information system unless that system meets certain statutory requirements relating to accessibility by persons with visual impairments. Accordingly, Contractor represents and warrants to System Agency that the technology provided to System Agency for purchase (if applicable under this Contract or any related Solicitation) is capable, either by virtue of features included within the technology or because it is readily adaptable by use with other technology, of: • providing equivalent access for effective use by both visual and non-visual means; • presenting information, including prompts used for interactive communications, in formats intended for non-visual use; and • being integrated into networks for obtaining, retrieving, and disseminating information used by individuals who are not blind or visually impaired. For purposes of this Section, the phrase “equivalent access” means a substantially similar ability to communicate with or make use of the technology, either directly by features incorporated within the technology or by other reasonable means such as assistive devices or services which would constitute reasonable accommodations under the Americans With Disabilities Act or similar state or federal laws. Examples of methods by which equivalent access may be provided include, but are not limited to, keyboard alternatives to mouse commands and other means of navigating graphical displays, and customizable display appearance. In accordance with Section 2157.005 of the Texas Government Code, the Technology Access Clause contract provision remains in effect for any contract entered into before September 1, 2006.

  • Technology Upgrades Notwithstanding any other provision of this Agreement, Verizon shall have the right to deploy, upgrade, migrate and maintain its network at its discretion. The Parties acknowledge that Verizon, at its election, may deploy fiber throughout its network and that such fiber deployment may inhibit or facilitate PNG’s ability to provide service using certain technologies. Nothing in this Agreement shall limit Verizon's ability to modify its network through the incorporation of new equipment or software or otherwise. PNG shall be solely responsible for the cost and activities associated with accommodating such changes in its own network.

  • Building Access The authorized representatives of the Union shall upon request have access to the District’s premises at any reasonable time for the purpose of adjusting grievances, investigating working conditions, or ascertaining that provisions of this Agreement are being adhered to; provided the representatives check in with the front office, following school protocol to receive a visitor’s badge, they do not interfere with employees in the performance of their duties. The Union shall furnish the District with the names of its authorized representatives.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!