Airport Staging Area Sample Clauses

Airport Staging Area. In the event of a spill, initially, there shouldn’t be any need to store any of the offshore equipment at the airport. Once the response equipment arrives, it will be immediately transported to its final destination or laydown area which will most likely be the local FOB / port at destination. However, special consideration should be taken for Dispersant. If the Boeing 727 Tersus Spray Dispersant System is mobilised, the best staging area for dispersant will be located at the airport’s facilities as it will provide an easier access to complete the Boeing 727 reloading operations. In circumstances where the dispersant or the response equipment requires to remain for a certain period of time at the airport, the following should be considered: • Capacity and location for the equipment storage. • Accessibility to the equipment. • Security requirements / clearance. • Bunded, shaded or covered area for dispersant would be preferred. When it comes to defining the staging area required, the initial dispersant mobilisation may contain 42 IBC’s refer to Section 1.4.2), which will require an area of approximately 42m2 for the dispersant plus additional space for forklift movement. Additional space should also be scoped in the event further dispersant is mobilised.
AutoNDA by SimpleDocs

Related to Airport Staging Area

  • Service Areas The MCP agrees to provide services to Aged, Blind or Disabled (ABD) members, Modified Adjusted Gross Income (MAGI) members, and Adult Extension members residing in the following service area(s): Central/Southeast Region ☐ Northeast Region ☐ West Region ☐ The ABD and MAGI categories of assistance are described in OAC rule 5160-26-02. The Adult Extension category is defined in Ohio’s Medicaid State Plan as authorized by the Centers for Medicare and Medicaid Services (CMS). The MCP shall serve all counties in any region they agree to serve.

  • Work Location While employed by the Company hereunder, the Executive shall perform his duties (when not traveling or engaged elsewhere in the performance of his duties) at the offices of the Company in Bermuda. The Executive shall travel to such places on the business of the Company in such manner and on such occasions as the Company may from time to time reasonably require.

  • Project Location [Insert the location of the Project, if applicable]

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Work Area The specific work area and/or crew an employee reports to on a daily schedule. Work areas are generally smaller divisions of a larger Bid Area.

  • Data Center Location Upon the effective date of the Agreement, the Data Centers used to host Personal Data in the Cloud Service are located in the EEA or Switzerland. SAP will not migrate the Customer instance to a Data Center outside the EEA or Switzerland without Customer’s prior written consent (email permitted). If SAP plans to migrate the Customer instance to a Data Center within the EEA or to Switzerland, SAP will notify Customer in writing (email permitted) no later than thirty days before the planned migration.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Service Area (a) SORACOM shall provide the SORACOM Air Global Service within the area designated on the web site of SORACOM (the “Service Area”), provided, that, the Service Area may be different if stated otherwise as specified by SORACOM separately. However, within the Service Area, you may not use the SORACOM Air Global Service in places where transmissions are difficult to send or receive.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

Time is Money Join Law Insider Premium to draft better contracts faster.