Analysis of DXA Sample Clauses

Analysis of DXA. ‌ In the subset of subjects treated at sites where DXA scans are being done, mean changes from baseline to Week 56 in bone mineral density (BMD) and bone mineral content (BMC)-Z scores will be evaluated. The mean change in BMD and BMC will be summarized descriptively as a continuous variable.
AutoNDA by SimpleDocs

Related to Analysis of DXA

  • Analysis LICENSEE represents and agrees that it will only incorporate Components received from authorized suppliers into Licensed Products and for no other purpose, and that LICENSEE will not directly or indirectly attempt to reverse-engineer any material provided to it hereunder by LICENSEE or any supplier of any Component.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurement (and calculations) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are be upgraded and/or replaced and/or modified; and o If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used; o A description of the key input parameters and output metrics which will be measured; o A description of the M&V protocol and analysis methods to be employed; and o A description of the independent, third-party measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project.

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • Protocols Each party hereby agrees that the inclusion of additional protocols may be required to make this Agreement specific. All such protocols shall be negotiated, determined and agreed upon by both parties hereto.

  • analyzed A sample acknowledgment statement is provided for each dataset in the Addendum to this Agreement.

  • Tests 7.7.1 If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any portion of the Work to be inspected, tested or approved, the Contractor shall give the Architect timely notice of its readiness so the Architect may observe such inspection, testing or approval. The Contractor shall bear all costs of such inspections, tests or approvals conducted by public authorities.

  • Protocol No action to coerce or censor or penalize any negotiation participant shall be made or implied by any other member as a result of participation in the negotiation process.

  • Audit and Testing 4.1 The Contractor shall conduct tests of the processes and countermeasures contained in the Security Plan ("Security Tests") on an annual basis or as otherwise agreed by the Parties. The date, timing, content and conduct of such Security Tests shall be agreed in advance with the Authority.

  • Testing Procedures Testing will be conducted by an outside certified Agency in such a way to ensure maximum accuracy and reliability by using the techniques, chain of custody procedures, equipment and laboratory facilities which have been approved by the U.S. Department of Health and Human Services. All employees notified of a positive controlled substance or alcohol test result may request an independent test of their split sample at the employee’s expense. If the test result is negative the Employer will reimburse the employee for the cost of the split sample test.

  • Vaccination and Inoculation (a) The Employer agrees to take all reasonable precautions, including in-service seminars, to limit the spread of infectious diseases among employees.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!