Consent to Examination In connection with the performance by the Transfer Agent of the Delegated Duties, the Transfer Agent understands and acknowledges that the Fund remains responsible for assuring compliance with the USA PATRIOT Act and that the records the Transfer Agent maintains for the Fund relating to the AML Program may be subject, from time to time, to examination and/or inspection by federal regulators in order that the regulators may evaluate such compliance. The Transfer Agent hereby consents to such examination and/or inspection and agrees to cooperate with such federal examiners in connection with their review. For purposes of such examination and/or inspection, the Transfer Agent will use its best efforts to make available, during normal business hours and on reasonable notice all required records and information for review by such examiners.
Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.
Preliminary Examination 24.1 The Purchaser will examine the bids to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the bids are generally in order. 24.2 Arithmetical errors will be rectified on the following basis. If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the total price shall be corrected. If the Supplier does not accept the correction of the errors, its bid will be rejected, and its bid security may be forfeited. If there is a discrepancy between words and figures, the amount in words will prevail. 24.3 The Purchaser may waive any minor informality, nonconformity, or irregularity in a bid which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder. 24.4 Prior to the detailed evaluation, pursuant to ITB Clause 25 the Purchaser will determine the substantial responsiveness of each bid to the bidding documents. For purposes of these Clauses, a substantially responsive bid is one which conforms to all the terms and conditions of the bidding documents without material deviations. Deviations from, or objections or reservations to critical provisions, such as those concerning Bid Security (ITB Clause 15), Applicable Law (GCC Clause 30), and Taxes and Duties (GCC Clause 32), will be deemed to be a material deviation. The Purchaser’s determination of a bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence.
Regulatory Examinations The Sub-Advisor will cooperate promptly and fully with the Advisor and/or the Trust in responding to any regulatory or compliance examinations or inspections (including information requests) relating to the Trust, the Fund or the Advisor brought by any governmental or regulatory authorities having appropriate jurisdiction (including, but not limited to, the SEC).
Program Requirements Provided At No Charge to the Judicial Council A. The Contractor shall provide the following items during the Program at no charge to the Judicial Council:
Proposed Personnel
SITE EXAMINATION Contractor has examined the Site and certifies that it accepts all measurements, specifications and conditions affecting the Work to be performed at the Site. By submitting its quote, Contractor warrants that it has made all Site examination(s) that it deems necessary as to the condition of the Site, its accessibility for materials, workers and utilities, and Contractor’s ability to protect existing surface and subsurface improvements. No claim for allowance of time or money will be allowed as to any other undiscovered condition on the Site.
Notification to Unsuccessful Job Applicants The parties agree that any unsuccessful candidate for an ONA job posting will be notified, in writing, within one (1) week of the decision being made and prior to the posting of the name of the successful candidate. The parties further agree that the above notification will be copied to the ONA Bargaining Unit President.
Initiation – Written Claim The claimant initiates a claim by submitting to the Plan Administrator a written claim for the benefits. If such a claim relates to the contents of a notice received by the claimant, the claim must be made within sixty (60) days after such notice was received by the claimant. All other claims must be made within one hundred eighty (180) days of the date on which the event that caused the claim to arise occurred. The claim must state with particularity the determination desired by the claimant.
Leave for Writing Examinations Leave of absence with pay shall be granted to allow employees time to write examinations for courses approved by the Employer. Employees shall advise the Employer of the time and place of the examination when they are made aware of the time and place.