Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.
WINDOW CLEANING Tenant shall not clean, nor require, permit, suffer or allow any window in the Premises to be cleaned from the outside in violation of Section 202 of the Labor Law, or any other Requirement, or of the rules of the Board of Standards and Appeals, or of any other board or body having or asserting jurisdiction.
Processing operations The personal data transferred will be subject to the following basic processing activities (please specify):
Ongoing Operations From the Effective Date through Closing:
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Annual Work Plans and Budgets The Recipient shall furnish to the Association as soon as available, but in any case not later than September 1 of each year, the annual work plan and budget for the Project for each subsequent year of Project implementation, of such scope and detail as the Association shall have reasonably requested, except for the annual work plan and budget for the Project for the first year of Project implementation, which shall be furnished no later than one (1) month after the Effective Date.
Safe Operations Notwithstanding any other provision of this Agreement, an NTO may take, or cause to be taken, such action with respect to the operation of its facilities as it deems necessary to maintain Safe Operations. To ensure Safe Operations, the local operating rules of the ITO(s) shall govern the connection and disconnection of generation with NTO transmission facilities. Safe Operations include the application and enforcement of rules, procedures and protocols that are intended to ensure the safety of personnel operating or performing work or tests on transmission facilities.
Rent Rolls; Operating Histories The Seller has obtained a rent roll (the “Certified Rent Roll(s)”) other than with respect to hospitality properties certified by the related Mortgagor or the related guarantor(s) as accurate and complete in all material respects as of a date within 180 days of the date of origination of the related Mortgage Loan. The Seller has obtained operating histories (the “Certified Operating Histories”) with respect to each Mortgaged Property certified by the related Mortgagor or the related guarantor(s) as accurate and complete in all material respects as of a date within 180 days of the date of origination of the related Mortgage Loan. The Certified Operating Histories collectively report on operations for a period equal to (a) at least a continuous three-year period or (b) in the event the Mortgaged Property was owned, operated or constructed by the Mortgagor or an affiliate for less than three years then for such shorter period of time, it being understood that for mortgaged properties acquired with the proceeds of a Mortgage Loan, Certified Operating Histories may not have been available.
CLEANING UP 4.15.1 Before commencement of any on-site activities, Contractor is required to prepare and submit to the Project Manager a Construction Site Waste Reduction Plan. A sample plan is available at: xxxx://xxx.xxx.xxxxx.xx.xx/dec/wastediv/recycling/CandD.htm . Failure to comply with this provision or a failure to comply with the plan itself will result in withholding of general conditions’ money from the contractor’s monthly requisition until Contractor has rectified the situation and is in full compliance with these provisions. 4.15.2 The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish. At the completion of the Work he shall remove all his waste materials and rubbish from and about. the Project as well as all his tools, construction equipment, machinery and surplus materials and shall leave the premises in a clean and satisfactory condition. 4.15.3 If the Contractor fails to clean up at the completion of the Work, the State may do so as provided in Paragraph 3.4 and the cost thereof shall be charged to the Contractor.
Banking Operations Enter into any new material line of business; change its material lending, investment, underwriting, risk and asset liability management and other material banking and operating policies, except as required by applicable law, regulation or policies imposed by any Governmental Authority; or file any application or make any contract with respect to branching or site location or branching or site relocation.