Authority to Suspend Contractor’s Operations Sample Clauses

Authority to Suspend Contractor’s Operations. The Engineer has the authority to suspend the Contractor’s operations, wholly or in part. The Engineer will order such suspension in writing, giving in detail the reasons for the suspension. Contract Time will be charged during all suspensions of Contractor’s operations. The Department may grant an extension of Contract time in accordance with 8-7.3.2 when determined appropriate in the Department’s sole judgment. No additional compensation or time extension will be paid or granted to the Contractor when the operations are suspended for the following reasons:
AutoNDA by SimpleDocs

Related to Authority to Suspend Contractor’s Operations

  • Operations Logs Seller shall maintain a complete and accurate log of all material operations and maintenance information on a daily basis. Such log shall include, but not be limited to, information on power production, fuel consumption, efficiency, availability, maintenance performed, outages, results of inspections, manufacturer recommended services, replacements, electrical characteristics of the generators, control settings or adjustments of equipment and protective devices. Seller shall maintain this information for at least two (2) years and shall provide this information electronically to Buyer within one day of Buyer’s request.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • STATE's Right to Suspend the Operations The STATE and/or the STATE's Authorized Representative has the authority to suspend portions or all of the operations due to causes including, but not limited to:

  • Owner’s Right to Suspend Work The Owner reserves the right, with or without the concurrence of the Design Professional, to suspend the Work at any time or from time to time at the Owner's sole discretion, upon giving Contractor five days advanced written notice thereof. If the Owner exercises this right and then resumes the Work covered hereby, Contractor shall be entitled upon timely claim to a Change Order for payment by Owner of any reasonable Actual Costs actually incurred by Contractor in connection with the suspension and resumption of the Work, as well as an extension in the time for performance of the Work to the extent Contractor is delayed by Owner's suspension, to include compensation based upon the rate for Time Dependent Overhead Costs. The Design Professional shall determine the time, which shall be binding upon both Owner and Contractor, as set forth in Section 3, Part 3.

  • Inspection Testing Authorization and Right of Access 2.1 Equipment Testing and Inspection 2.2 Authorization Required Prior to Parallel Operation

  • REGULATORY FILINGS AND CAISO TARIFF COMPLIANCE 3.1 Filing

  • Evaluation Licenses Access to the Software may be provided to You for beta, demonstration, test, or evaluation purposes, (collectively, “Evaluation Licenses”). For any Evaluation Licenses, the term shall be limited to thirty (30) days (the “Evaluation Period”), unless otherwise agreed to by Xxxxxxxxx in writing. Evaluation Licenses are limited specifically to use for evaluation or demonstration purposes only, and You agree not to use such Software in a production or non-test environment. Your use of the Software under an Evaluation License is provided as-is, without any representations or warranties of any kind, and is at Your sole risk. Honeywell has no obligation to support, maintain or provide any assistance regarding any Evaluation Licenses. IN NO EVENT WILL HONEYWELL BE LIABLE FOR ANY DAMAGES OF ANY KIND, INCLUDING, WITHOUT LIMITATION, ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, EXEMPLARY, STATUTORY, PUNITIVE, OR CONSEQUENTIAL DAMAGES (INCLUDING, WITHOUT LIMITATION, LOST PROFITS, LOST DATA, DAMAGE TO SYSTEMS OR EQUIPMENT, OR BUSINESS INTERRUPTION). YOU ARE NOT ENTITLED TO ANY DEFENSE, INDEMNIFICATION FOR EVALUATION LICENSES GRANTED PURSUANT TO THIS SECTION.

  • Authorization to Proceed A fully executed and approved authorization in the form of Attachment 6 to this Agreement, Authorization to Proceed (“ATP”) accompanied by an executed purchase order document issued by the Owner to the Project Consultant, authorizing the performance of specific professional services, authorizing commencement of a Phase as defined in Article 2.1 through Article 2.8, and stating the time for completion and the amount of fee authorized for such services.

  • Failure to Supply Workmen or Materials or to Prosecute the Work A Notice of Non-Compliant Work may be issued for failure of the Contractor to supply enough workers or enough materials or proper materials to prosecute the Work. A Notice of Non-Compliant Work in such event may be based on Article 3.3.2 (Competent Management of Time), and upon the definition of Work as set forth under Paragraph 1.1.9.58.

  • Evaluation License If You are licensing the Software for evaluation purposes, Your use of the Software is only permitted in a non-production environment and for the period limited by the License Key. Notwithstanding any other provision in this XXXX, an Evaluation License of the Software is provided “AS-IS” without indemnification, support or warranty of any kind, expressed or implied.

Time is Money Join Law Insider Premium to draft better contracts faster.