Blackberry Substation Upgrade Sample Clauses

Blackberry Substation Upgrade. 1.1.1 The Blackberry Substation Upgrade consists of the installation of 345 kV terminal equipment, and, if necessary, rerouting up to two 345 kV line segments to different terminal positions, at the existing Blackberry substation necessary to support a 345 kV line from the Blackberry substation to the Wolf Creek substation with a summer emergency rating of at least 1792 MVA. All elements and conductor must have at least an emergency rating of 1792 MVA, but are not limited to that amount.
AutoNDA by SimpleDocs
Blackberry Substation Upgrade. Estimated Engineering and Construction Cost of the Blackberry Substation Upgrade - $7.5 million 1. SPP cost responsibility - $7.5 million (100%) 2. AECI cost responsibility - $0 (0.0%)

Related to Blackberry Substation Upgrade

  • Cell Phones The College follows the State’s Cell Phone Policy. Employees who receive cell phones from the College shall also abide by this Policy. The College shall provide the Policy to any employee who is given a cell phone. Employees are responsible for the cost of all personal calls. While the College anticipates some incidental personal use of cell phones, it is also expected that such use is infrequent.

  • Workstation/Laptop encryption All workstations and laptops that process and/or store DHCS PHI or PI must be encrypted using a FIPS 140-2 certified algorithm which is 128bit or higher, such as Advanced Encryption Standard (AES). The encryption solution must be full disk unless approved by the DHCS Information Security Office.

  • Computers All computers, hardware, software, computer upgrades and maintenance in connection therewith shall be at Owner's expense.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • Cell Phone Employee shall be provided with a cell phone, with e-mail capabilities, at Board expense. As a condition of receipt of said cell phone, employee is expected to be reachable as necessary and appropriate by the Superintendent and Board President for the thorough and efficient operation of the School District. Incidental personal use shall be permitted. Employees shall have the option of being reimbursed for the use of a personal smartphone in the amount of fifty dollars ($50.00) per month instead of accepting a district cell phone. As a condition of this reimbursement, employee must a) be reasonably available at all times via the personal phone; and b) take reasonable measures to protect the confidentiality of student and staff information being transmitted to and through said phone.

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Outdoor Lighting 3.8.1 Lighting shall be directed to driveways, parking areas, loading area, building entrances and walkways and shall be arranged so as to divert the light away from streets, adjacent lots and buildings.

Time is Money Join Law Insider Premium to draft better contracts faster.