BRICKWORK AND BLOCKWORK SUNDRIES. Brickwork reinforcement:
AutoNDA by SimpleDocs
BRICKWORK AND BLOCKWORK SUNDRIES. Galvanized brickwork reinforcement m2 58 m2 133 m2 45 m2 248 5 115mm Wide reinforcement built in horizontally A1 : 25 A2 : 38 A3 : 88 6 230mm Wide reinforcement built in horizontally. A1 : 374 A2 : 312 A3 : 344 m 151 m 1 030 Carried to Collection R
BRICKWORK AND BLOCKWORK SUNDRIES. Galvanized brickwork reinforcement 1 115mm Wide reinforcement built in horizontally A0 : 0 A1 : 53 A6 : 35 AD : 35 AE : 18 AF : 124 AG : 88 AH : 88 2 230mm Wide reinforcement built in horizontally. A0 : 271 A1 : 390 A6 : 273 AD : 273 AE : 206 AF : 328 AG : 376 AH : 109 Cramps, ties, etc: m 442 m 2 227 3 30 x 2mm Galvanized roof tie 1500mm long with one end fixed to timber and other built into brickwork or concrete. No 208 A0 : 26 A1 : 26 A6 : 26 AD : 26 AE : 26 AF : 26 AG : 26 AH : 26 Air bricks etc: 4 229 x 152mm terracotta clay vermin proof air brick No A0 : 12 A1 : 12 A6 : 12 AD : 12 AE : 12 AF : 12 AG : 12 AH : 12 Bagging and sealing the outer face of the inner skin of walls with 1:3 cement and sand mixture and seal with two coats "Brixeal" bitumen emulsion waterproofing coating: 5 To walls (Provisional). m2 A0 : 53 A1 : 84 A6 : 68 AD : 68 AE : 54 AF : 93 AG : 91 AH : 25 Samples 96 537 6 Prepare and construct for approval L-Shaped one brickwall faced and pointed both sides as per given specification, size: 1000x1000x1000mm high. same area (1000x1000mm) to be paved as per given specifications. Turning pieces to lintels etc Item

Related to BRICKWORK AND BLOCKWORK SUNDRIES

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

  • Metalwork Section 2

  • Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.

  • MSEA SEIU shall have exclusive rights to payroll deduction of membership dues, service fees, and premiums for current MSEA-SEIU spon- sored insurance programs. Deductions for other programs may be mutually agreed to by the parties.

  • Firefighters Any truck with an inoperative aerial ladder shall be regularly and routinely staffed with one (1) officer and five (5) firefighters for the period of time that the aerial ladder is inoperative, or until such time as the truck with the inoperative aerial ladder is replaced with a truck with an operative aerial ladder. At 0800 and 2000 hours, all trucks shall be staffed with one (1) officer and four (4) firefighters, and any truck with an inoperative aerial ladder shall be staffed with one (1) officer and five (5) firefighters.

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

  • Přetrvající platnost This Section 3 “

  • FABRICATION Making up data or results and recording or reporting them.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

Time is Money Join Law Insider Premium to draft better contracts faster.