---CABLE SYSTEM MAPS Sample Clauses

---CABLE SYSTEM MAPS. (a) The Licensee shall file with the Issuing Authority or its designee "as-built" maps of the Cable System plant. If changes are made in the Cable System, upon request, the Licensee shall file updated as-built maps, including strand information, not later than fifteen (15) days after any such request, and annually not later than fifteen (15) days after each anniversary of the Execution Date of the Final License.
AutoNDA by SimpleDocs
---CABLE SYSTEM MAPS. Upon written request, the Licensee shall file with the Issuing Authority strand maps of all Cable System plant. Upon written request said strand maps shall also be provided in electronic format if they exist in said electronic format. The Licensee shall not be required to provide a particular type of electronic format which is different from the electronic format the Licensee maintains, If changes are made in the Cable System, the Licensee shall notify the Issuing Authority and, upon written request, the Licensee shall file updated maps annually, not later than sixty (60) days after a written request.
---CABLE SYSTEM MAPS. (a) The Licensee shall provide, upon written request, not more than once annually, the Issuing Authority or its designee with strand maps of the Cable System plant. If changes are made in the Cable System that effect the accuracy of such strand maps, the Licensee shall file updated strand maps not more than once annually.
---CABLE SYSTEM MAPS. Within thirty (30) days of a written request by the Issuing Authority, but no more than once annually, the Licensee shall file with the Issuing Authority or its designee a “strand” map of the Cable System in hard copy. Said “strand” map shall also be provided in electronic format, if it exists in electronic format, if so requested in writing by the Issuing Authority. Thereafter, after written request of the Issuing Authority or its designee, if changes are made to the Cable System, such that a map is no longer accurate, the Licensee shall file with the Issuing Authority updated “strand” map within a reasonable period of time.
---CABLE SYSTEM MAPS. (a) Upon request, the Licensee shall continue to file with the Issuing Authority or its designee(s) strand maps of the Cable System plant. If changes are made in the Cable System, upon request, the Licensee shall file with the Town updated strand maps annually, not later than fifteen (15) days after each anniversary of the Effective Date of this Renewal License.

Related to ---CABLE SYSTEM MAPS

  • PROPANE GAS SYSTEM SERVICE AREA If the Property is located in a propane gas system service area owned by a distribution system retailer, Seller must give Buyer written notice as required by §141.010, Texas Utilities Code. An addendum containing the notice approved by TREC or required by the parties should be used.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Network Resource Interconnection Service (check if selected)

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Customer (1) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: None

  • Interconnection Customer Drawings Within one hundred twenty (120) days after the date of Initial Operation, unless the Interconnection Parties agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Transmission Provider and the Interconnected Transmission Owner final, “as-built” drawings, information and documents regarding the Customer Interconnection Facilities, including, as and to the extent applicable: a one-line diagram, a site plan showing the Customer Facility and the Customer Interconnection Facilities, plan and elevation drawings showing the layout of the Customer Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Customer Facility to the step-up transformers and the Customer Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Customer Facility. As applicable, the Interconnection Customer shall provide Transmission Provider and the Interconnected Transmission Owner specifications for the excitation system, automatic voltage regulator, Customer Facility control and protection settings, transformer tap settings, and communications.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

Time is Money Join Law Insider Premium to draft better contracts faster.