Capacity Demonstration Test Dates Sample Clauses

Capacity Demonstration Test Dates. The 20-Day Demonstration shall commence at noon on a mutually agreed upon date which follows or is coincident with the Term Start Date and shall be completed no later than the Firm Operation Date, and shall extend for a total period of 20 consecutive non-holiday weekdays (the “20-Day Demonstration”). The Six-Hour Demonstration must be scheduled for a non-holiday weekday within the 20-Day Demonstration period. Concurrently with the selection of the commencement date for the 20-Day Demonstration, Seller shall select which Generating Units will be the Generating Units for the Capacity Demonstration Test, if applicable. This selection may not be changed for any reason during the Capacity Demonstration Test or the Capacity Demonstration Test will be repeated in its entirety. Buyer and Seller may each, upon three Business Days advance Notice, make up to two requests to reschedule the commencement date for either the 20-Day Demonstration or the Six-Hour Demonstration. The commencement date for the Six-Hour Demonstration may only be rescheduled to a different date within the 20-Day Demonstration, if applicable. Neither the 20-Day Demonstration nor a Six-Hour Demonstration may be rescheduled once it has commenced, except as set forth under Section 5 of this Exhibit C. 20-Day Demonstration. In order to pass the 20-Day Demonstration, the Generating Facility must achieve a Capacity Demonstration Factor of greater than or equal to 0.95. The Capacity Demonstration Factor is calculated as follows: CAPACITY DEMONSTRATION FACTOR = A / (B x C) Where A = The number of Capacity Measurement Intervals during the test period when the Demonstration Rate of Metered Energy equals or exceeds the Firm Contract Capacity specified in Section 1.02(d). B = The total number of hours during the 20 consecutive non-holiday weekday test period that begin at noon and end at 6:00 p.m. (i.e., 120 hours). C = The number of Capacity Measurement Intervals within each hour. Six-Hour Demonstration. For the Six-Hour Demonstration, Seller shall demonstrate the ability of the Generating Facility to Operate for a six consecutive hour period, starting at noon and ending at 6:00 p.m. (the “Six-Hour Demonstration”). The Generating Facility shall be deemed to have satisfied the Six-Hour Demonstration if the Power Output in each and every Metering Interval during the six-hour period equals or exceeds the Firm Contract Capacity set forth in Section 1.02(d).
AutoNDA by SimpleDocs
Capacity Demonstration Test Dates. The 20-Day Demonstration shall commence at noon on a mutually agreed upon date which follows or is coincident with the Term Start Date and shall be completed no later than the Firm Operation Date, and shall extend for a total period of 20 consecutive non-holiday weekdays (the “20-Day Demonstration”). The Six- Hour Demonstration must be scheduled for a non-holiday weekday within the 20-Day Demonstration period. Concurrently with the selection of the commencement date for the 20-Day Demonstration, Seller shall select which Generating Units will be the Generating Units for the Capacity Demonstration Test, if applicable. This selection may not be changed for any reason during the Capacity Demonstration Test or the Capacity Demonstration Test will be repeated in its entirety. Buyer and Seller may each, upon three Business Days advance Notice, make up to two requests to reschedule the commencement date for either the 20-Day Demonstration or the Six-Hour Demonstration. The commencement date for the Six-Hour Demonstration may only be rescheduled to a different date within the 20-Day Demonstration, if applicable. Neither the 20-Day Demonstration nor a Six-Hour Demonstration may be rescheduled once it has commenced, except as set forth under Section 5 of this Exhibit C.

Related to Capacity Demonstration Test Dates

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones: 6.1 Substantial Site work completed. On or before December 31, 2020 Interconnection Customer must demonstrate completion of at least 20% of project site construction. At this time, Interconnection Customer must submit to Interconnected Transmission Owner and Transmission Provider initial drawings, certified by a professional engineer, of the Customer Interconnection Facilities. 6.2 Delivery of major electrical equipment. On or before December 31, 2021, Interconnection Customer must demonstrate that all generating units have been delivered to Interconnection Customer’s project site.

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • Follow-up Testing An employee shall submit to unscheduled follow-up drug and/or alcohol testing if, within the previous 24-month period, the employee voluntarily disclosed drug or alcohol problems, entered into or completed a rehabilitation program for drug or alcohol abuse, failed or refused a preappointment drug test, or was disciplined for violating the provisions of this Agreement and Employer work rules. The Employer may require an employee who is subject to follow-up testing to submit to no more than six unscheduled drug or alcohol tests within any 12 month period.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Acceptance Tests 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract. 11.2 Where the Contract provides for an acceptance procedure in the presence of both parties, at the successful completion of such procedure, the Purchaser shall issue the Supplier with an acceptance certificate which shall authorise the Supplier to invoice the Purchaser for any payment due on such acceptance. 11.3 The Purchaser shall at its discretion be entitled to issue and acceptancecertificate with reserves. The Supplier shall be obliged to remedy any non-conformities within the period set out in the acceptance certificate. Any payment which would otherwise have been due on acceptance may be withheld by the Purchaser in whole or part until the non- conformities underlying the reserves have been remedied.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).